HomeMy WebLinkAboutEPL Display CardFORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 97
The lower the EnergyPerformance Index, the more efficient the home.
1. New construction or existing
2. Single family or multiple family
3. Number of units, if multiple family
4. Number of Bedrooms
5. Is this a worst case?
6. Conditioned floor area (ftz)
7. Windows- Description
a. U-Factor: Dbl, U=0.35
SHGC: SHGC=0.29
b. U-Factor: N/A
SHGC:
c. U-Factor: N/A
SHGC:
d. U-Factor: N/A
SHGC:
Area Weighted Average Overhang Depth:
Area Weighted Average SHGC:
8. Skylights Description
a. U-Factor(AVG): N/A
SHGC(AVG): N/A
5701 SHANNON DRIVE,, FL,
New (From Plans)
10. Wall Type and Insulation
Insulation
Area
Detached
a. Concrete Block - Int Insul, Exterior
R=4.1
1164.00 ftz
b. Frame - Wood, Adjacent
R=13.0
292.00 ftz
1
c. N/A
R=
ftz
4
d. N/A
R=
ftz
11. Ceiling Type and insulation level
Insulation
Area
No
a. Under Attic (Vented)
R=30.0
1650.00 ftz
1650
b. N/A
R=
ftz
c. N/A
R=
ftz
Area
12. Ducts, location & insulation level
R ftz
126.00 ftz
a. Sup: Attic, Ret: Main, AH: Main
6 330
ftz
13. Cooling systems
kBtu/hr
Efficiency
ftz
a. Central Unit
22.2 SEER:14.50
ftz
1.000 ft.
0.290
Area
ftz
9. Floor Types Insulation Area
a. Slab -On -Grade Edge Insulation R=0.0 1650.00 ftz
b. N/A R= ftz
c. N/A R= ftz
14. Heating systems
a. Electric Heat Pump
15. Hot water systems
a. Electric
b. Conservation features
None
Credits (Performance method)
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code c plia t features.
Builder Signature: (����G Date:
Address of New Home:
City/FL Zip:
kBtu/hr Efficiency
22.2 HSPF:8.20
Cap: 50 gallons
EF: 0.92
Pstat
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
2/1/2021 2:50 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 5701 Shannon Drive 1650 LHG - E Builder Name: WADE JOURNEY
Street: 5701 SHANNON DRIVE Permit Office: ST LUCIE
City, State, Zip: FL, Permit Number:
Y
U
Owner: WADE JOURNEY Jurisdiction: 661000
W
x
Design Location: FL, Fort Pierce
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/door jambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind p*p0no and wiring,
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sorunkler cover plates and walls or ceolangs.
a. In addition, inspection of log walls shall be in accordance with the provisions of KX-4UU.
2/1/2021 2:50 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1