Loading...
HomeMy WebLinkAboutEPL Display CardFORM R405-2020 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 97 The lower the EnergyPerformance Index, the more efficient the home. 1. New construction or existing 2. Single family or multiple family 3. Number of units, if multiple family 4. Number of Bedrooms 5. Is this a worst case? 6. Conditioned floor area (ftz) 7. Windows- Description a. U-Factor: Dbl, U=0.35 SHGC: SHGC=0.29 b. U-Factor: N/A SHGC: c. U-Factor: N/A SHGC: d. U-Factor: N/A SHGC: Area Weighted Average Overhang Depth: Area Weighted Average SHGC: 8. Skylights Description a. U-Factor(AVG): N/A SHGC(AVG): N/A 5701 SHANNON DRIVE,, FL, New (From Plans) 10. Wall Type and Insulation Insulation Area Detached a. Concrete Block - Int Insul, Exterior R=4.1 1164.00 ftz b. Frame - Wood, Adjacent R=13.0 292.00 ftz 1 c. N/A R= ftz 4 d. N/A R= ftz 11. Ceiling Type and insulation level Insulation Area No a. Under Attic (Vented) R=30.0 1650.00 ftz 1650 b. N/A R= ftz c. N/A R= ftz Area 12. Ducts, location & insulation level R ftz 126.00 ftz a. Sup: Attic, Ret: Main, AH: Main 6 330 ftz 13. Cooling systems kBtu/hr Efficiency ftz a. Central Unit 22.2 SEER:14.50 ftz 1.000 ft. 0.290 Area ftz 9. Floor Types Insulation Area a. Slab -On -Grade Edge Insulation R=0.0 1650.00 ftz b. N/A R= ftz c. N/A R= ftz 14. Heating systems a. Electric Heat Pump 15. Hot water systems a. Electric b. Conservation features None Credits (Performance method) I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code c plia t features. Builder Signature: (����G Date: Address of New Home: City/FL Zip: kBtu/hr Efficiency 22.2 HSPF:8.20 Cap: 50 gallons EF: 0.92 Pstat *Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 2/1/2021 2:50 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1 2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: 5701 Shannon Drive 1650 LHG - E Builder Name: WADE JOURNEY Street: 5701 SHANNON DRIVE Permit Office: ST LUCIE City, State, Zip: FL, Permit Number: Y U Owner: WADE JOURNEY Jurisdiction: 661000 W x Design Location: FL, Fort Pierce U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door jambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind p*p0no and wiring, Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sorunkler cover plates and walls or ceolangs. a. In addition, inspection of log walls shall be in accordance with the provisions of KX-4UU. 2/1/2021 2:50 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1