HomeMy WebLinkAboutApproved P0.DPURSUIT BOATSNew ManufacturingFacility3901 St Lucie Blvd.Ft Pierce FL 34946Dwg. File:XREF File:Plot File:.Copyright C 2021, Donadio & Associates, Architects, P.A.Cert. No.:Date Signed:17,285Sheet No.:Project No.:Chd:MJB/BCSAR/MG2021-26Drn:.Architect:Drawing Title:D O N A D I OVero Beach, FL 32960License No. AA00022382001 9th Avenue, Suite 308& Associates, Architects P.A.Fax.772.562.8600Tel.772.794.2929Consultant:Key Plan:No.:Issues:Description:Date:Project:www.donadio-arch.com575 NW MERCANTILE PLACESUITE 206PORT ST. LUCIEFL 34986T.561.746.6343 F.561.746.3602info@CEAengineers.comPE# 78477 CA LIC. 31555A.08/30/21OWNER ISSUEB.C.09/21/21OWNER REVISIONSD.11/01/21OWNER REVISIONS11/04/21WALL TYPES UPDATEE.11/15/21FOUNDATION PERMITPLUMBING SCHEDULESP0.DPLUMBING GENERAL SPECIFICATIONS1.ALL MATERIALS AND WORKMANSHIP SHALL BE IN STRICT ACCORDANCE WITH ALLLOCAL CODES AND ORDINANCES. ALL MATERIALS SHALL BE NEW, FREE OFDEFECTS AND OF AMERICAN MANUFACTURE, ALL REQUIREMENTS ANDMATERIALS SHALL BE AS INDICATED IN THESE DRAWINGS AND SPECIFICATIONSAND/OR MATCH EXISTING WHEN APPROVED AS APPLICABLE.2.DOMESTIC WATER PIPING "INTERIOR TO CONDITIONED SPACE" SHALL BE TYPE "L"HARD TEMPER COPPER ABOVE FLOOR WITH WROUGHT COPPER FITTINGS AND95/5 SOLDER JOINTS. POTABLE WATER SYSTEM SHALL BE "LEAD FREE". SOLDERAND FLUXES SHALL COMPLY WITH ASTM B813.3.DOMESTIC WATER PIPING & FITTINGS UNDERGROUND AND EXPOSED INWAREHOUSE SHALL BE CPVC SCHEDULE 80. PIPE SHALL BE MANUFACTUREDFROM CORZAN® TYPE IV, GRADE I CHLORINATED POLYVINYL CHLORIDE (CPVC)COMPOUNDS WITH CELL CLASSIFICATION OF 23447 PER ASTM D1784. THE PIPESHALL BE MANUFACTURED IN STRICT COMPLIANCE TO ASTM F441 AND THEFITTINGS IN STRICT COMPLIANCE TO ASTM F439, CONSISTENTLY MEETING THEQUALITY ASSURANCE TEST REQUIREMENTS OF THESE STANDARDS WITHREGARD TO MATERIAL, WORKMANSHIP, BURST PRESSURE, FLATTENING, ANDQUALITY. THE PIPE AND FITTINGS SHALL BE PRODUCED IN THE USA USINGDOMESTIC MATERIALS, BY AN ISO 9001 CERTIFIED MANUFACTURER, AND SHALLBE STORED INDOORS AFTER PRODUCTION, AT THE MANUFACTURING SITE, UNTILSHIPPED FROM FACTORY. THE PIPE AND FITTINGS SHALL CARRY THE NSFNATIONAL SANITATION FOUNDATION (NSF) STANDARD 14 & 61 LISTINGS FORPOTABLE WATER APPLICATIONS. ALL PIPE AND FITTINGS SHALL BEMANUFACTURED BY GF HARVEL (OR EQUAL).4.ALL HOT WATER AND HOT WATER RETURN PIPING SHALL BE INSULATED WITH 1"ULTRA FIBER GLASS PIPE INSULATION WITH A POLYPROPYLENE (PP)-COATEDFACTORY-APPLIED VAPOR-BARRIER JACKET. MADE FROM ROTARY GLASS FIBERSBONDED WITH A THERMOSETTING RESIN. THE PP-COATED JACKET INCLUDES ALONGITUDINAL, SELF-SEALING CLOSURE LAP AND MATCHING BUTT STRIP. THEJACKET SYSTEM IS ADHERED TO EACH FIBER GLASS SECTION USING ASPECIALLY FORMULATED ADHESIVE TO ENSURE JACKET SECUREMENT. PROVIDEWEATHER-PROTECTIVE JACKETING FOR PIPING EXPOSED TO OUTDOORCONDITIONS. ALL JOINTS TO BE SEALED WITH FACTORY APPLIED, SELF-SEAL LAPAND BUTT STRIPS.5.EACH FIXTURE AND EQUIPMENT SUPPLY SHALL BE PROVIDED WITH A SUPPLYSTOPOR SHUT-OFF VALVE AS APPLICABLE, AND A CALCULATED SHOCK ABSORBERS/WATER HAMMER ARRESTORS AS REQUIRED BY THE AUTHORITY HAVINGJURISDICTION.6.THE CONTRACTOR SHALL MAKE ALL NECESSARY CONNECTIONS TO ALLEQUIPMENT FURNISHED BY OTHERS.7.ALL PIPING SHALL BE SUPPORTED IN AN APPROVED MANNER FROM THE BUILDINGSTRUCTURE. INSTALL DIELECTRIC FITTINGS AT ALL DISSIMILAR METAL PIPINGCONNECTIONS. PROVIDE COMPENSATION FOR EXPANSION AND CONTRACTION.8.INSULATE ALL AIR CONDITIONING AND REFRIGERATED EQUIPMENT CONDENSATEDRAINS WITH 1/2" IMCOSHIELD, OR AP ARMAFLEX INSULATION RATED 25/50.FINISH WHERE EXPOSED TO EXTERIOR WEATHER CONDITIONS WITH 2 COATS OFWHITE LATEX PAINT AS PER THE MANUFACTURER'S INSTRUCTIONS.9.INSULATE EXPOSED PIPING AND TRAP DRAINS ON LAVATORIES THAT ARECLASSIFIED AS ACCESSIBLE WITH TRUEBRO LAVGAURD 2 INSULATION KIT ORAPPROVED EQUAL.10.ALL WATER PIPING PROVIDED SHALL BE TESTED AT 100 PSIG AND 150% OFAVAILABLE SERVICE PRESSURE MINIMUM HYDROSTATIC PRESSURE FOR AMINIMUM OF 4 HOURS.11.ALL SANITARY AND VENT PIPING PROVIDED SHALL BE TESTED WITH A 10 FOOTHEAD OF WATER. WATER LEVEL POINT OR HYDROSTATIC PRESSURE FOR AMINIMUM OF 4 HOURS.12.CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSURANCE, PERMITS, FEES,INSPECTIONS AND TAXES REQUIRED TO INSTALL AND COMPLETE SYSTEMSINDICATED ON THE DRAWINGS AND SPECIFIED HEREIN. CONTRACTOR SHALLPERFORM AND/OR PAY FOR ALL TESTS INDICATED AND/OR REQUIRED BYAUTHORITIES HAVING JURISDICTION FOR ALL SYSTEMS PROVIDED.13.ALL SANITARY PIPING SHALL BE SLOPED AS FOLLOWS: FOR PIPING 3"Ø ANDLARGER SLOPE AT 1/8" PER FOOT, FOR PIPING 2-1/2"Ø AND SMALLER SLOPE AT1/4" PER FOOT.14.THE CONTRACTOR SHALL COMPLETELY FAMILIARIZE HIMSELF WITH ALLCONDITIONS. PRIOR TO COMMENCEMENT OF WORK, VERIFY MEASUREMENTS ATBUILDING SITE. NOTIFY ARCHITECT AND/OR ENGINEER OF ANY CHANGESREQUIRED DUE TO SUCH CONDITIONS BEFORE PROCEEDING WITH THE WORK.SUBMIT DISCREPANCIES, DIFFERENCES AND PROPOSED VARIATIONS TOCONTRACT DOCUMENTS FOR CONSIDERATION AND DECISION BEFOREPROCEEDING .15.OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OFSPACE AVAILABLE FOR INSTALLATION OF THE EQUIPMENT AND MATERIALSUNDERCONTRACT, AND PROVIDE READY ACCESSIBILITY TO VALVES, AND OTHERAPPARATUS, INCLUDING ANY PART OF SYSTEM REQUIRED TO BE REACHED FORMAINTENANCE AND OPERATIONS.16.PROVIDE ACCESS PANELS IN ALL WALLS AND CEILINGS FOR ALL VALVES,DAMPERS,CONTROL DEVICES, ETC. ACCESS PANELS SHALL BE MILCOR FLUSH TYPE.17.VERIFY ALL VOLTAGES WITH ELECTRICAL CONTRACTOR BEFORE ORDERING ANYEQUIPMENT.18.CUT ALL OPENINGS AND CHASES REQUIRED TO ACCOMMODATE THE WORK BYTHIS CONTRACTOR. ALL WORK DONE UNDER THIS HEADING MUST CONFORM INEVERY RESPECT TO ARCHITECTURAL AND STRUCTURAL REQUIREMENTS, ANDFINISH AND QUALITY OF MATERIALS AND WORKMANSHIP REQUIRED OFAPPLICABLE TRADES FOR THE PROJECT.19.PROVIDE AND INSTALL FIRE AND SMOKE PENETRATION SEALS FOR OPENINGS INFLOORS/SLABS, WALLS AND OTHER ELEMENTS OF CONSTRUCTION DEFINED ONARCHITECTURAL DRAWINGS AS FIRE AND/OR SMOKE BARRIERS. FIRE/SMOKESEALING SYSTEM SHALL HAVE THE SAME RATING AS THE BARRIER PENETRATED.INSTALL PER MANUFACTURER'S RECOMMENDATIONS.A.FIRESTOPPING MATERIALS TO BE BY 3M, DOW CORNING CORP., TREMCOX-FERNO PRODUCTS, INC. OR APPROVED EQUAL. SEE DETAILS ON DRAWINGA15-A.B.FIRESTOPPING MATERIALS TO BE ASBESTOS FREE AND IN COMPLIANCE WITHASTM E-814 AND UL 1479.18.PROVIDE AN ACCURATE LAYOUT, GRADES, AND ELEVATIONS; SET SLEEVES ANDOPENINGS IN AMPLE TIME; TAKE PROPER PRECAUTIONS TO PROTECT ALLEXISTING AND NEW WORK AND EQUIPMENT FROM DAMAGE.19.ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOIDINTERFERENCE WITH THE PROGRESS OF CONSTRUCTION AND IN STRICTCOMPLIANCE WITH ALL APPLICABLE CODES, STANDARDS AND AUTHORITYHAVING JURISDICTION.20.VIBRATION ISOLATION: ALL EQUIPMENT AS PER MANUFACTURERRECOMMENDATIONS TO ELIMINATE ANY OBJECTIONABLE NOISE, SUBJECT TOREVIEW BY ENGINEER.21.VERIFY ALL DIMENSIONS WITH STRUCTURE PRIOR TO ANY FABRICATION ORINSTALLATION.22.THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND COMPATIBILITYWITH ANY INTERFACE OR CONFLICT OF BUILDING SERVICES AND INCORPORATESUCH ACCOMMODATIONS INTO THE CONTRACT. AN ALLOWANCE SHALL BE MADEIN THE CONTRACTOR'S BID TO ACCOMMODATE DIFFERENCES FROM THE ACTUALLOCATION VERSUS THE LOCATION INDICATED FROM THE AVAILABLEINFORMATION.23.SUBMIT SHOP DRAWINGS OF ALL PIPING LAYOUTS, MATERIALS, EQUIPMENTAND/OR PROPOSED INSTALLATIONS FOR PROCESSING PRIOR TO FABRICATIONAND/OR ORDERING OF EQUIPMENT AND MATERIALS. ALL SHOP DRAWINGSAND/OR REQUESTS FOR ANY DEVIATIONS FROM THE CONTRACT DOCUMENTSSHALL BE ACCEPTED FOR REVIEW ONLY WHEN SUBMITTED THROUGH THEARCHITECT. ALL SUBMITTALS SHALL BE MADE WITHIN 30 DAYS OF NOTICE TOPROCEED. SUBMITTALS OF PIPING LAYOUTS OR MATERIALS AND EQUIPMENTSPECIFICALLY SPECIFIED BY DESCRIPTION/MANUFACTURER/MODEL NUMBERNEED NOT BE MADE AS THEIR DEFINITION ON THE CONTRACT DOCUMENTS ISEVIDENCE OF APPROVAL UNLESS OTHERWISE NOTED. CONTRACTOR ASSUMESALL FINANCIAL RISKS FOR PROCEEDING WITHOUT SHOP DRAWINGS PROCESSEDWITHOUT EXCEPTION ON ANY NON- SPECIFIED ITEM. SHOP DRAWINGS ANDSUBMITTALS FOR EACH ITEM SHALL BE REVIEWED NO MORE THAN TWO TIMESUNLESS ACCOMPANIED BY PURCHASE ORDER FROM CONTRACTOR. PIPINGLAYOUTS AND/OR SYSTEMS IF SUBMITTED AT VARIANCE TO THE CONTRACTDOCUMENTS SHALL INCLUDE REASON FOR PROPOSED CHANGE, CREDITOFFERING TO OWNER AND C. O. D. PURCHASE ORDER TO ENGINEER TO REVIEWALTERNATIVE DESIGN, FAILURE TO INCLUDE ANY OF THESE ITEMS WILL RESULTIN REJECTION. CIRCUMSTANCES NECESSITATING A REVISION TO THE PERMITTEDDOCUMENTS NOT PROCESSED PRIOR TO INSTALLATION MAY NOT BE ACCEPTEDAND WILL NOT BE REVIEWED UNLESS ACCOMPANIED BY A PURCHASE ORDERFROM THE CONTRACTOR. RELOCATED TO ACCOMPLISH INTENT OF WORK SHOWNBY ALL TRADES. INCLUDE ALL COSTS FOR EXISTING CONDITIONS AND SYSTEMSTHAT MUST BE CONTRACTOR SHALL THOROUGHLY INVESTIGATE SITE PRIOR TOSUBMITTING BID, AND OTHER AREAS SHALL BE REROUTED INTO NEW WALLS ANDFLOORS AND CEILINGS SPACES. IN A SAFE CONDITION. ANY PIPING RUNNINGTHROUGH CONSTRUCTION AREAS SERVING (SEE ARCHITECTURAL DEMOLITIONPLANS). ALL REMAINING PIPING SHALL BE LEFT OF CONSTRUCTION NOTSPECIFICALLY SHOWN AS REMAINING, OR SERVING OTHER AREAS AND CAPPED.REMOVE ALL PLUMBING TRADE ITEMS THROUGHOUT AREA SHOWN ASREMAINING OR SERVING OTHER AREAS SHALL BE REMOVED VALVES, PIPING,CARRIERS, HANGERS, ETC., I.E. ALL PLUMBING TRADE ITEMS NOT OCCUPANCY.24.WHERE SPECIFIC PRODUCTS, MANUFACTURERS AND/OR MODEL NUMBERS ARELISTED TO ESTABLISH QUALITY STANDARDS AND/OR SPACE LIMITATIONS,SUBSTITUTIONS OF EQUAL STATUS WITH APPROPRIATE CREDITS MAY BECONSIDERED IF ACCEPTED IN WRITING/VIA PROCESSED SHOP DRAWINGS BY THEOWNER AND THE ENGINEER PRIOR TO INSTALLATION. THIS CONTRACTOR WILLABSORB ALL COORDINATION EFFORTS AND ALL IMPACTS IMPOSED ON OTHERTRADES.25.PAINT ALL EXPOSED EQUIPMENT AND PIPING IN COMPLIANCE WITH OWNER'SSPECIFICATIONS LOCATED ON THESE DRAWINGS.26.EQUIPMENT, PIPING, ETC., SHALL BE LOCATED AS REQUIRED TO ACCOMMODATEBUILDING CONDITIONS INDICATED BY ALL TRADES.27.ON ALL SCHEDULED EQUIPMENT WHOSE MODEL NUMBER IS INCONSISTENT WITHTHE PERFORMANCE CHARACTERISTICS INDICATED, THE CONTRACTOR SHALLBASE HIS PRICE ON THE MORE EXPENSIVE SOLUTION. ANY SUCH DISCREPANCIESSUCH AS MANUFACTURER'S MODEL CHANGE SHALL BE RESOLVED PRIOR TO THEORDERING ANY EQUIPMENT.28.ALL EQUIPMENT SUPPORTS, PIPING SUPPORTS, AND ROOF PENETRATIONS SHALLBE FABRICATED AND/OR INSTALLED IN A MANNER ACCEPTABLE TO THE BUILDINGSTRUCTURAL ENGINEER AND ARCHITECT.29.FOR ALL SLABS AND PARTICULARLY SLABS CONTAINING REINFORCING INTENSION (POST TENSION), ASCERTAIN LOCATION OF REINFORCING COMPONENTSAND OBTAIN STRUCTURAL ENGINEERS APPROVAL FOR PENETRATION SIZE(S)AND LOCATION(S) PRIOR TO PROCEEDING WITH ANY WORK.30.ALL POTABLE WATER SYSTEMS SHALL BE FLUSHED CLEAN, STERILIZED WITH ANAPPROVED SOLUTION AND THOROUGHLY FLUSHED OF ALL RESIDUAL SOLUTIONAFTER FINAL PRESSURE TEST AND WITH ALL TRIM AND CONNECTIONSINSTALLED.31.CONTRACTOR SHALL OBTAIN APPROVED MANUFACTURER'S INSTALLATIONDRAWINGS AND DIMENSIONED ROUGH-IN LAYOUT AND/OR CATALOG CUTS OF ALLEQUIPMENT PRIOR TO PROCEEDING WITH ANY WORK.32.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIXTURE ROUGH-IN DIMENSIONSAND CORRECT FLOOR AND WALL PENETRATIONS.33.CONTRACTOR SHALL PROVIDE ALL SYSTEMS INDICATED IN THESESPECIFICATIONS ON THE DRAWINGS AND AS REQUIRED TO COMPLY WITH LOCALCODES AND ORDINANCES AS APPLICABLE TO COMPLETING WORK FOR INTENDEDOCCUPANCY. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS FOR THECONTRACTOR TO PROVIDE A COMPLETE AND OPERATING INSTALLATIONINCLUDING PROVIDING SERVICES AND CONNECTIONS TO ITEMS THAT MAY ONLYBE INDICATED ON AIR CONDITIONING, ELECTRICAL AND/OR ARCHITECTURALCONTRACT DOCUMENTS.34.PROVIDE TEMPORARY POTABLE WATER SERVICE AS REQUIRED ON SITE FOR ALLTRADES.35.SEE ARCHITECTURAL DRAWINGS AND SITE CONDITIONS FOR AREAS ANDSYSTEMS PRIOR TO BID AND COMMENCEMENT OF WORK AND ORDERING OFMATERIALS. TO INCLUDE WHERE APPLICABLE ANY DEMOLITION ANDPREPARATION WORK REQUIRED WITHIN THE SCOPE OF THIS PROJECT.36.RE-ROUTE ANY PIPING WHICH INTERFERES WITH, OR IS REQUIRED FORCONTINUITY OF A SYSTEM IN THE CONSTRUCTION OF THIS PROJECT. PROVIDEDRAWINGS OF ALL PROPOSED CHANGES AND OBTAIN WRITTEN AUTHORIZATIONFROM ARCHITECT PRIOR TO RE-ROUTING OR ALTERING ANY SYSTEM ORBUILDING COMPONENT.37.PROVIDE INTERFACE CONNECTIONS TO UTILITY SYSTEMS AS REQUIRED,COORDINATED WITH CIVIL DRAWINGS AND CIVIL CONTRACTOR.38.AT COMPLETION OF WORK REMOVE ALL RUBBISH AND DEBRIS CAUSED BY THISWORK AND THOROUGHLY CLEAN ALL RELATED FIXTURES AND EQUIPMENT.39.CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREEFROM DEFECTS FOR A PERIOD OF NOT LESS THAN ONE YEAR FROM DATE OFACCEPTANCE.40.PROVIDE FIXTURES AND EQUIPMENT AS INDICATED ON DRAWINGS.41.PROVIDE ALL FIXTURES AND EQUIPMENT WITH APPROVED PLUMBING FITTINGS.VISIBLE PARTS OF FIXTURE AND EQUIPMENT TRIM AND ACCESSORIES, INCLUDINGSUPPLIES, P-TRAPS, WASTE ARMS AND ESCUTCHEONS SHALL BE HEAVILYCHROME PLATED.42.PROVIDE WALL HUNG FIXTURES NOT SUPPLIED WITH FLOOR MOUNTED CARRIERSWITH MINIMUM 1/4" THICK STEEL WALL PLATE SECURED TO STUDS FOR WALLHANGER, AND INSTALLED WITH ADDITIONAL STRUCTURAL SUPPORTS ANDBRACING SO THAT FIXTURE CAN WITHSTAND 300 POUND VERTICAL DOWNWARDFORCE AT FRONT EDGE OF FIXTURE WITHOUT DAMAGE TO INSTALLATION.43.SANITARY WASTE AND VENT PIPING SHALL BE DWV PVC ABOVE GRADE, DWV PVCBELOW GRADE.40.PRESSURE AND TEMPERATURE RELIEF PIPING AND HEATER AUXILIARY PANDRAIN PIPING SHALL BE COPPER.41.CONDENSATE DRAIN PIPING SHALL BE DWV PVC BELOW GRADE, INSULATED DWVCOPPER ABOVE FLOOR AND INSIDE BUILDING.42.PIPE SUPPORTS SHALL BE PROVIDED TO BE COMPATIBLE WITH PIPING,INSULATION, STRUCTURE, AND COMPENSATE FOR CONTRACTION ANDEXPANSION.43.ALL HOSE BIBBS AND HOSE CONNECTIONS THIS PROJECT SHALL BE PROVIDEDWITH VACUUM BREAKERS. EACH HOSE BIBB SHALL BE PROVIDED WITH ANINDIVIDUAL SHUT-OFF VALVE.44.ALL TRAPS FOR FLOOR DRAINS, OPEN SIGHT DRAINS, HUB DRAINS, AND INDIRECTWASTES SHALL BE PROVIDED WITH AUTOMATIC TRAP SEAL PRIMING SYSTEMS.SEE DETAILS FOR ACCEPTABLE PRIMING SYSTEMS.45.PROTECT ALL FIXTURES AND EQUIPMENT FROM DAMAGE AND REPAIR ORREPLACE DAMAGED ITEMS AS APPLICABLE IN A MANNER ACCEPTABLE TOAFFECTED PARTY.46.TESTS SHALL BE PERFORMED PRIOR TO APPLICATION OF ANY INSULATION ANDMAKING FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT.47.REFER TO CONTRACT DOCUMENTS CREATED BY SPECIALTY CONSULTANTS(SUCH AS LANDSCAPE, SITE, LIGHTING, CIVIL AND/OR INTERIOR DESIGN ASAPPLICABLE) AND ASSOCIATED SHOP DRAWINGS TO CONFIRM REQUIREMENTSPRIOR TO ROUGH IN FOR QUANTITY, SIZES AND LOCATION OF REQUIREDSERVICES.48."AS-BUILT" DRAWINGS SHALL BE PROVIDED BY CONTRACTOR IN COMPLIANCEWITH SPECIFICATIONS.Y:\Cardinal\Projects\21-08-15-00 Pursuit Product Development Center\Plumbing\21-08-15-00 Pursuit New Tooling Facility PLUMB-rev.dwg, P0.D, 11/17/2021 9:12:37 AM,Operator1