Loading...
HomeMy WebLinkAboutREMODEL PROJECT APPLICATION2022 REGENCY ISLAND DUNES Architectural Review Committee -Remodel Project Application Please fill out both sides and return to Regency office manager: regency8640@the-regency.com OWNER NAME: Joe and Karen Raspe BUILDING & UNIT# II #1103 PHONE NUMBER (Regency): PHONE # AWAY: CELL PHONE (1): 305-393-9010 CELL PHONE (2): 305-393-7646 EMAIL (1): karenraspe@bellsouth.net EMAIL (2): joeraspe ,bellsouth.net _ Describe Remodel: Replace cabinets, tops, mirrors, vanity lights, sinks, faucets, toilets and tile floors, in 3 Bathrooms. Master Bath: Remove header in shower to match existing soffit & Install shower & tile. Bath 2: Replace tub w/ new shower & tile. Remove knee wall. Hall Bath:Replace all shower tile. Repair and paint damaged areas. No structural changes to be made. Estimated Project Start Date: * 3/1/2022 Estimated Completion Date: *6/1/2022 Estimated Project Budget: *40,000 Could Your Project Be Scheduled During Summer Months: General Contractor: Cooke Construction, Inc. Yes or X No Phone #: 772-530-0659 Contractor's email: lorri@cookeconstructioninc.com Contractor's License#:. Project Manager: Shawn Hester Project Manager Ph. #: CGC1520585 772-812-9662 General Contractor Physical Address: 1276 Business Park Place Jensen Beach FL. 34957 Contractor Insurance Company: Stuart Insurance, Inc. Ins. Policy No.: See Attached Copy of Insurance Policy Attached Yes X / No Electrician Sub: All Power Electric List All Subs Working On This Project Electrician's License: EC13006338 Electrician's Phone Number: 772-528-7258 Ins Co. & Policy # Plumbing Sub: For Him Plumbing Plumber's License Plumber's Phone Number: 772-342-8677 See Attached CFC1428915 Ins. Co. & Policy: See Attached Flooring/Tile Sub: Cooke Construction, Inc. Sub's License #: Flooring/Tile Phone Number: Ins. Co. & Policy: t a August 2021 Misc. Sub: Misc. Sub Phone Number: Misc. Sub: Misc. Sub: Sub's License #- |ns[o&Po|icy Sub's License #: ARegency Inspection Fee ($25/visit) will be required for the Following Remodel Elements Initial:_NQ_ Floor Replacement* x Wall Removal x ,Kitchen Remodel _�% �_BothroomRemmdei_XHVAC_____ Ceiling Replacennent��_VVindmvvRep|aoenemt*___8ecthca/VVork(beywndrep|acing devices) x Gutting nrDemo Work X Replacing Plumbing: X Replacing Hot Water Tank: ____ sprinklers___ *Window replacements have specific engineer set protocols that must befollowed please allow additional lead time for window/slider replacements interior Mrewa|bmay not be altered in any way without written permission from the ARC No structural changes are allowed -no cutting of any concrete floors or columns. Shower drains for example may not bcelongated inthe floor Please note vertical stacks and vents are Regency property. Please notify office if uncovered so they may beinspected and assessed. *All interior finishes must show evidence of compliance with Section 804 of the Florida Building Codes If your project includes demolition, new electrical, new plumbing, sprinkler work, approved fipewaUwork ur new sliders aSt. Lucie Building Permit will berequired. Please refer tnthe St. Lucie County website: Please contact Mr. Doug Harvey, StLucie County Building Supervisor . with your specific permit questions. Doug Harvey isvery professional and helpful. Please don't hesitate tocontact him. 1 Project Approved 8yArchitectural Review Committee. "", " — Date: � Project Approved byRegency Board Representative (if necessary Date: Walling on approval letter from Regency mfile for permit St. Lucie County Building Permit Applied For: Yes X NnDate: _Approval Date: ______ Please confirm you have read and understand the elevator procedure for material transport: Yes: XDate:1&/Zyu Please confirm you have ren adanduod�tandAnzbbectuoa)[han8estoUnhsGenera|:Yes: X Date,10/26 {21 Please confirm you have read and understand, General Rules for All Contractors: Yes. X Date: 10126/21 Please confirm you have read and understand Carpet and Tile Installers Guidelines: Yes; _X_Date: 10/26121 Please confirm you have read and understand, Glass Slider Installation Requirements: Yes: X Date August 2021