HomeMy WebLinkAboutduct sealCouN
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date. 2 d o 'L'L
Permit #: Z I 2-
y
Lot #:
Contractor.
Address:
3 7 6
`' Sfi ��r �• s 1
Construction: Post Construction Test ❑ Rough -in Test
Test Conditions: o
Date: ( 2� Za 2� Floor Area (ft2):
Time; �5 Primary Location of Supply Ductwork t
Indoor Temperature (F): -t 2 Primary Location of Return Ductwork Mom•,
Outdoor Temperature (F): r7s
Total Leakage Test (Outside) o 6
Duct Leakage: ❑ Default ❑ Prop. Leak Free Proposed On
Test Pressure: 't-- T (Pa)
Baseline Duct Pressure (optional) D •f (Pa)
Duct Press. (Pa) Flbw Ring Fan Press Flow (dm) Results: 4ass o Fail
Installed Pa 3 —?
t 17 Total Leakage (cfm):
Total Leakage per 100 sgfl: sr o
CFM25 x 100 divided by the CFA = Duct Leakage CFMl100 sgfL
Testing Company
Company Name: Pro -Duct Services Address: I ' L ' t/r s 4-- Pr':, Ff- (i FL J
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5e Edition FBC Energy Conservation requirements In accordance with
Section R403.2.2.
Signature:
Printed Name: Martin Klein Lioense/Certificate #: 5061633