Loading...
HomeMy WebLinkAboutduct sealCouN Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date. 2 d o 'L'L Permit #: Z I 2- y Lot #: Contractor. Address: 3 7 6 `' Sfi ��r �• s 1 Construction: Post Construction Test ❑ Rough -in Test Test Conditions: o Date: ( 2� Za 2� Floor Area (ft2): Time; �5 Primary Location of Supply Ductwork t Indoor Temperature (F): -t 2 Primary Location of Return Ductwork Mom•, Outdoor Temperature (F): r7s Total Leakage Test (Outside) o 6 Duct Leakage: ❑ Default ❑ Prop. Leak Free Proposed On Test Pressure: 't-- T (Pa) Baseline Duct Pressure (optional) D •f (Pa) Duct Press. (Pa) Flbw Ring Fan Press Flow (dm) Results: 4ass o Fail Installed Pa 3 —? t 17 Total Leakage (cfm): Total Leakage per 100 sgfl: sr o CFM25 x 100 divided by the CFA = Duct Leakage CFMl100 sgfL Testing Company Company Name: Pro -Duct Services Address: I ' L ' t/r s 4-- Pr':, Ff- (i FL J I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5e Edition FBC Energy Conservation requirements In accordance with Section R403.2.2. Signature: Printed Name: Martin Klein Lioense/Certificate #: 5061633