Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutEnvelope Leakage Test ReportEnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Buildina Code. Enerav Conservation, 7th Edition
Jurisdiction: 661100 Permit #:
1 a '•t`�a4�9 g; E.ns Wti —��: T' w, r-�:.a'.sF+},a o
x } f s .ski i- _ , 10- ' � n
.t% ry..i u.?-,e Ct,{V x, u i5i^�a?�',gJrbp3�'+ his GAS•` h - S '�
" t.'�-ta:.,.�' ; y�` ��!�. tK^N k ..�1PL'��� N t e�
��rr pii t� 53Rs Y,'-.ri' i wl'.z �+4 %F. .q kL.l ,2W�y"°1S '1���N�S
VQYm{ajlai Ya`�3:�1'1'R-s%,n..�yii''i .�t ri.',. "�`�s'`r�,�.=,.:$Y, h�zm;`i�:. `�:c-s°rs.i._ E.,,..J
?c, f� N +-�.- .fie .a„iay..
Builder: Community: Lot: NA
Address: 7408 San Carlos Dr
City: Fort Pierce State: FL Zip: 34951
me e e rnt . P. n Nwwww
1 ' _rr soli nta-71
N
.o"
• � "�. �(� SO � e , � off' `'�, 20 � fc, •�e �rr+an } r�f� ©&,� �' l 6.000
h lW i°�5�@:�.'i.E�r •.A'�'V�.f�?��fYi,.4Y� �.�'^5t
x 60 _ 10920 = Method for calculating building volume:
CFM(50) Building Volume ACH(50) O Retrieved from architectural plans
F� PASS 0 Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results' are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
7/30/2021 2:27:07 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1