Loading...
HomeMy WebLinkAboutCOMPACTION TEST (LIFT 1)Dederal Phone:954-784-2941 E-Fax: 954-784-7875 0",-,ngineering admin@fed-eng.com www.fed-eng.com (j esting, Inc. 3370 NE 5th Avenue Oakland Park, Florida 33334 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Single Family Home Address: 5804 Raintree Trail, Fort Pierce, FL 34982 Area Tested: Building Pad Material Type: Dark Brown Sand Company: Groza Builders, Inc. Address: 1332 Biltmore Street Port St. Lucie, FL 34983 Date: January 11, 2022 Order #: Permit #: Tech: 22CMT0108 TS Compaction Req.: 98% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NW Corner of Building Pad 12" 1 L 8.7 100.4 102.0 12.0 98.4% Yes 2 NE Corner of Building Pad 12" 1 L 1 8.5 101.1 102.0 1 12.0 99.1 % Yes 3 1 Center of Building Pad 12" 1 L 7.9 100.8 102.0 12.0 98.8% Yes 4 ISW Corner of Building Pad 12" 1 L 9.8 100.4 102.0 12.0 98.4% Yes 5 SE Corner of Building Pad 12" 1 L 9.5 100.8 102.0 12.0 98.8% Yes 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad/footing and is not a verification of Soil Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted bY SL = Springline FL = Final Lift Keith LeBlanc, P.E.`; SG = Subgrade BG = Below Grade Federal Engineering-& Testing, Inc:;- BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 52394 ` TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publicstion of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of conipaction of the tested layer of maierial only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials beiow the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will s;lppoi t"e proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate th,- suitability rif ;he underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this wcrI4_ PAGE 1 of 2