Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutICC Push Piers Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
The product described in this Uniform Evaluation Service (UES) Report has been evaluated as an alternative material, design or method of construction in order to satisfy and comply
with the intent of the provision of the code, as noted in this report, and for at least equivalence to that prescribed in the code in quality, strength, effectiveness, fire resistance, durability
and safety, as applicable, in accordance with IBC Section 104.11. This document shall only be reproduced in its entirety.
Copyright © 2021 by International Association of Plumbing and Mechanical Officials. All rights reserved. Printed in the United States. Ph: 1-877-4IESRPT • Fax: 909.472.4171
web: www.uniform-es.org • 4755 East Philadelphia Street, Ontario, California 91761-2816 – USA
Page 1 of 10
SUPPORTWORKS, INC. 11850 Valley Ridge Drive Papillion, Nebraska 68046 www.supportworks.com kolson@supportworks.com SUPPORTWORKS PP288 AND PP237 PUSH PIER SYSTEMS
CSI Section:
31 62 00 Driven Piles
1.0 RECOGNITION
Supportworks, Inc. Models PP288 and PP237 push pier
systems recognized in this report have been evaluated for use
as support foundations. The structural performance and
geotechnical properties of the Supportworks, Inc. push pier
systems comply with the intent of the provisions of the
following codes and regulations:
• 2018, 2015, 2012, and 2009 International Building
Code® (IBC)
• 2018, 2015, 2012, and 2009 International
Residential Code® (IRC) –Attached Supplement
2.0 LIMITATIONS
Use of Models PP288 and PP237 push pier foundation
systems recognized in this report is subject to the following
limitations:
2.1 The push pier foundation systems are manufactured,
identified and installed in accordance with this report,
approved construction documents (engineering drawings and
specifications), and the manufacturer’s published installation
instructions. In case of conflicts, the more restrictive governs.
2.2 The push pier foundation systems have been evaluated for
support of structures assigned to Seismic Design Categories
A, B, and C in accordance with IBC Section 1613. Push pier
foundation systems that support structures assigned to
Seismic Design Category D, E or F, or are located in Site
Class E or F, are outside the scope of this report.
2.3 Installations of the push pier foundation systems are
limited to regions of concrete members where analysis
indicates no cracking occurs at service load levels or due to
the effects of restrained shrinkage.
2.4 The push pier brackets shall be used only to support
structures that are laterally braced as defined in Section
1810.2.2 of the IBC.
2.5 The push pier foundation systems have not been
evaluated for use in soil conditions that are indicative of a
potential pier deterioration or corrosion situation as defined
by the following: (1) soil resistivity less than 1,000 ohm-cm;
(2) soil pH less than 5.5; (3) soils with high organic content;
(4) soil sulfate concentrations greater than 1,000 ppm; (5)
soils located in a landfill, or (6) soil containing mine waste.
2.6 Zinc-coated steel and bare steel components shall not be
combined in the same system, except where the sacrificial
thickness (Ts) for the zinc-coated components is taken as that
given for bare steel components. All push pier foundation
components shall be galvanically isolated from concrete
reinforcing steel, building structural steel, or any other metal
building components.
2.7 The push pier shafts shall be installed at a maximum angle
of 3.0 ± 1.0-degrees from the vertical.
2.8 Special inspection is provided in accordance with Section
3.4 of this report.
2.9 Engineering calculations and drawings, in accordance
with recognized engineering principles, as described in IBC
Section 1604.4, prepared by a registered design professional,
are provided to, and are approved by the building official.
2.10 The adequacy of the concrete structures that are
connected to the brackets shall be verified by a registered
design professional, in accordance with applicable code
provisions, such as Chapter 15 of ACI 318 and Chapter 18 of
IBC, and subject to the approval of the building official.
2.11 A geotechnical investigation report for each project site
shall be provided to the building official for approval in
accordance with Section 3.2.1 of this report.
2.12 When using the alternative basic load combinations
prescribed in IBC Section 1605.3.2, the allowable stress
increases permitted by material chapters of the IBC
(including Chapter 18) or the referenced standards are
prohibited.
2.13 Evaluation of compliance with Section 1810.3.11.1 of
the IBC for buildings assigned to Seismic Design Category
C, and with Section 1810.3.6 of the IBC for all buildings, is
outside the scope of this evaluation report. Such compliance
shall be addressed by a registered design professional for
each site, and the work of the design professional shall be
subjected to approval of the building official.
2.14 Settlement of push piers is beyond the scope of this
evaluation report and shall be determined by a registered
design professional as required in Section 1810.2.3 of the
IBC.
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 2 of 10
2.15 Allowable lateral load resistance capacities of the
system are outside the scope of this report.
2.16 The Model PP288 push pier foundation system
components are manufactured at the following facilities:
Behlen Technology & Manufacturing Company, Omaha,
Nebraska; Behlen Manufacturing Company, Columbus,
Nebraska; PowerBrace, Des Moines, Iowa; and TSA
Manufacturing, Omaha, Nebraska. The Model PP237 push
pier foundation system components are manufactured at the
following facilities: Behlen Technology & Manufacturing
Company, Omaha, Nebraska; Behlen Manufacturing
Company, Columbus, Nebraska; and TSA Manufacturing,
Omaha, Nebraska.
3.0 PRODUCT USE
3.1 General: Supportworks, Inc. Models PP288 and PP237
push pier systems are used to support foundations of existing
structures or to provide additional axial compression capacity
to existing foundation systems. The systems are alternatives
to driven piles described in IBC Section 1810.3.1.4.
3.2 Design: Structural calculations (analysis and design) and
drawings, prepared by a registered design professional, shall
be approved by the building official for each project, and
shall be based on accepted engineering principles as
described in IBC Section 1604.4, and shall conform to IBC
Section 1810. The design methods for the steel components
are Allowable Strength Design (ASD), described in the IBC
and AISC 360 Section B3.4. The structural analysis shall
consider all applicable internal forces due to applied loads,
structural eccentricity and maximum span(s) between push
pier foundations. The structural analysis, the IBC, and this
report shall be used to select an appropriate push pier system.
The ASD capacities of push pier system components are
indicated in Table 2 of this report. The geotechnical
investigation shall address the suitability of the push pier
system for the specific project. The requirements for deep
foundations in IBC Section 1803.5.5 shall be considered. In
addition, effects on the supported foundation and structure
and group effects on the pile-soil capacity shall be
considered. The investigation shall provide estimates of the
axial compression capacities for the push piers, and the
expected total and differential settlements due to single pier
or pier group, as applicable.
3.2.1 A written report of the geotechnical investigation shall
be submitted to the building official as one of the required
submittal documents, prescribed in IBC Section 107, at the
time of the permit application. The geotechnical report shall
comply with provisions in IBC Section 1803.6 and also
include, but need not be limited to, the following information:
1. Information on groundwater table, frost depth and
corrosion-related parameters, as described in Section 2.5
of this report.
2. Soil properties, including those affecting the design such
as support conditions for the piers.
3. Recommendations for design criteria.
4. Any questionable soil characteristics and special design
provisions, as necessary.
3.2.2 Bracket Capacity (P1): Only localized limit state of
concrete bearing strength in compression has been evaluated
in this evaluation report for compliance with IBC Chapter 19
and ACI 318. All other structural requirements in IBC
Chapter 19 and ACI 318 applying to the concrete foundation,
such as those limit states described in ACI 318 (anchorage
per Appendix D, punching (two-way) shear, beam (one-way)
shear, and flexural (bending) related limit states), have not
been evaluated in this evaluation report. The concrete
foundation shall be designed and justified to the satisfaction
of the building official with due consideration to structural
detailing, applicable limit states, and the direction and
eccentricity of applied loads, including reactions provided by
the brackets, acting on the concrete foundation.
3.2.3 Shaft Capacity (P2): The top of shafts shall be braced
as prescribed in Section 1810.2.2 of the IBC. In accordance
with Section 1810.2.1 of the IBC, any soil other than fluid
soil shall be deemed to afford sufficient lateral support to
prevent buckling of systems that are braced. When piers are
standing in air, water, or fluid soils, the unbraced length is
defined as the length of piers that is standing in air, water or
fluid soils plus an additional 5 feet (1524 mm) when
embedded into firm soil or an additional 10 feet (3048 mm)
when embedded into soft soil. Firm soils shall be defined as
any soil with a Standard Penetration Test (SPT) blow count
of five or greater. Soft soil shall be defined as any soil with a
SPT blow count greater than zero and less than five. Fluid
soils shall be defined as any soil with a SPT blow count of
zero [weight of hammer (WOH) or weight of rods (WOR)].
The SPT blow counts shall be determined in accordance with
ASTM D1586. For fully braced conditions where the pier is
installed in accordance with Section 1810.2.2 of the IBC, and
piers do not stand in air, water, or fluid soils, the shaft
capacities shall not exceed the ASD shaft compression
capacities shown in Table 2 of this report. Shaft capacities of
push pier foundation systems in air, water or fluid soils, shall
be determined by a registered design professional.
The elastic shortening/lengthening of the pier shaft will be
controlled by the variation of applied loads from the pier
lock-off load and the mechanical and geometrical properties
of the 27/8- and 23/8-inch-diameter (73 mm and 60 mm) round
structural tubing. The shaft elastic shortening may be
determined from equation Eq.-1:
∆shaft = ∆P x LA x E (Eq. 1)
Where:
Δshaft = change in shaft length due to elastic shortening (inches/mm)
ΔP = change in load between the applied load and the pier lock-off
load (lbf/N)
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 3 of 10
L = pier shaft length (inches/mm)
A = shaft cross-sectional area (in2/mm2) (taken from Table 1 of this
report)
E = shaft steel modulus of elasticity (29,000,000 psi/199,900 MPa)
3.2.4 Soil Capacity (P4): For determination of allowable soil
capacity in axial compression, a minimum factor of safety of
2.0 shall be applied to the final drive force. The final drive
force shall not exceed the maximum drive force rating of the
applicable PP288 or PP237 push pier system as listed in
Table 2 (Note #4) of this report.
3.2.5 System Capacity: The ASD allowable capacity of the
push pier foundation system in compression depends upon
the analysis of interaction of brackets, shafts, and soils; and
shall be the lowest value of P1, P2, and P4 as shown in Table
2 of this report.
3.3 Installation:
3.3.1 Installation General: The push pier foundation
systems shall be installed by trained and certified installers.
The push pier foundation systems shall be installed in
accordance with this section (Section 3.3 of this report), site-
specific approved construction documents (engineering
drawings and specifications), and the manufacturer’s written
installation instructions. In case of conflicts, the more
restrictive governs.
3.3.2 Retrofit Bracket Installation:
1. An area shall be excavated approximately 3 feet (914
mm) square and to a depth approximately 9 to 13 inches
(229 to 330 mm) below the bottom of footing at the push
pier location. The soil shall be removed below the
bottom of footing to about 9 inches (229 mm) from the
footing face in the area where the bracket bearing plate
will be placed. The vertical and bottom faces of the
footing shall, to the extent possible, be smooth and at
right angles to each other for the mounting of the support
bracket. The concrete surfaces shall be free of all soil,
debris and loose concrete so as to provide a full and firm
contact of the retrofit bracket.
2. Notching of the footings may be needed to place the
retrofit bracket directly under the wall/column. Notching
shall be performed, however, only with the acceptance
of the registered design professional and the approval of
the building official.
3. The bracket shall be placed under the footing and raised
into position with the horizontal and vertical bearing
plates in full contact with the concrete surfaces. The
bracket shall be temporarily held in place using wood
cribbing or other mechanical means. The under-footing
brackets do not require mechanical anchorage to the
concrete foundation.
4. The external sleeve shall be placed over the starter tube
and both the external sleeve and starter tube shall be
inserted through the bracket from the top. Care shall be
taken that the sleeve and starter are properly aligned and
extend past both the top and bottom plates of the bracket.
5. The drive stand shall be secured to the bracket, the
hydraulic drive cylinder attached to the drive stand and
connected to the hydraulic operating system.
6. The drive stand shall be aligned by activating the
hydraulics and extending the drive cylinder rod to make
slight contact with the starter tube section. A digital
level, protractor or other device shall be used to check
alignment of the drive stand, sleeve, starter and bracket.
The alignment shall be adjusted as necessary to allow a
3.0 ±1.0-degree installation angle. Temporary cribbing
may be used between the drive stand and the foundation
wall to set the correct installation angle while advancing
the starter tube and external sleeve.
7. The external sleeve and starter tube shall be driven
together until the end of the sleeve is seated at the top of
the bracket. Pier tubes shall then be coupled and pushed
through the external sleeve. When the maximum
cylinder stroke has been reached, the cylinder shall be
retracted, a drive tube tool shall be set in place, and the
push shall be completed to the top of the bracket or
external sleeve.
8. The drive pressure at the final stroke of each pier tube
section shall be recorded. This process shall continue
until the pre-determined drive pressure (final drive force)
is achieved or the structure starts to lift. After reaching
the final drive force, the pressure shall be released from
the hydraulic system and the drive stand and drive
cylinder shall be removed from the bracket. The drive
process shall be repeated at each of the proposed pier
locations. The final drive force shall not exceed the
maximum drive force rating of the push pier system as
listed in Table 2 (Note #4) of this report.
9. A lift cylinder shall be connected to each retrofit bracket
assembly to lift the structure to the desired elevation
and/or transfer the designated portion of the foundation
loads to the push pier system.
3.4 Special Inspection: Continuous special inspection in
accordance with Section 1704.8 of the 2009 IBC or Section
1705.7 of the 2012, 2015, and 2018 IBC shall be provided for
the installation of foundation piers and foundation brackets.
Items to be confirmed by the special inspector include, but
are not limited to, the manufacturer’s certification of
installers, verification of the product manufacturer, push pier
bracket and component configuration and identification,
inclination and position of the push piers, final drive force,
push pier lock-off load, depth of the foundation piers, and
compliance of the installation with the approved construction
documents and this evaluation report.
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 4 of 10
In lieu of continuous special inspection, periodic special
inspection as defined in IBC Section 202 is permitted,
provided that all following requirements identified below, are
satisfied: (1) The installers are certified by the manufacturer
and the evidence of installer training and certification by the
report holder are provided to the building official; (2)
Structural observations in accordance with the 2009 IBC
Section 1710, 2012 IBC Section 1704.5, or 2015 or 2018 IBC
Section 1704.6 are provided; (3) A periodic inspection
schedule, as part of the statement of special inspection,
prepared by a registered design professional, is submitted to
and approved by the building official. As a minimum, the
periodic inspection schedule shall include, but not be limited
to, the following:
1. Before the start of work: Verify manufacturer, verify
installer’s certification by the manufacturer, and confirm
push pier and bracket configuration compliance with the
approved construction documents and this evaluation
report.
2. Installation of the first push pier foundation system:
Verify that the location, inclination, final drive force,
push pier lock-off load and depth of the push piers
comply with the approved construction documents and
this evaluation report. Verify that installers keep an
installation log.
3. First connection to the building structure: Verify that
installation of brackets complies with the approved
construction documents and this evaluation report.
4. End of work: Verify that the installation log complies
with requirements specified in the approved construction
documents. Verify that installation of all structural
connections complies with approved construction
documents and this evaluation report.
4.0 PRODUCT DESCRIPTION
4.1 Product information: Models PP288 and PP237 push
pier systems consist of an under-footing bracket (side load),
external sleeve, starter tube with friction-reduction collar,
and push pier tube sections with slip-fit couplings. The under-
footing bracket is secured against and below the existing
footing while pier sections are hydraulically driven (pushed)
through the bracket and into the soil below using the
combined structural weight and any contributory soil load as
drive resistance. Pier sections are added and driven until a
suitable load bearing stratum is encountered. The weight of
the structure is then transferred through the foundation
brackets and piers, and to firm load bearing soil or bedrock.
4.2 PP288 Material information
4.2.1 Retrofit Bracket Assemblies FS288B, FS288BL, and
FS288BL2: The FS288B, FS288BL, and FS288BL2 bracket
assemblies consist of an FS288B, FS288BL, or FS288BL2
bracket, an external pipe sleeve (FS288ES48), a cap plate
(FS288C), two threaded rods, and matching nuts. The
assemblies are illustrated in Figure 1 of this report.
4.2.1.1 FS288B, FS288BL, and FS288BL2 Brackets: The
FS288B, FS288BL, and FS288BL2 brackets are constructed
from factory-welded, 0.250-, 0.3125-, 0.375-, and 0.500-
inch-thick (6.35 mm, 7.94 mm, 9.53 mm, and 12.7 mm) steel
plates. The steel plates used in the FS288B and FS288BL
brackets conform to ASTM A36, with a minimum yield
strength of 36 ksi (248 MPa) and a minimum tensile strength
of 58 ksi (400 MPa). The steel plates used in the FS288BL2
bracket conform to ASTM A572, Grade 50, with a minimum
yield strength of 50 ksi (345 MPa) and a minimum tensile
strength of 65 ksi (448 MPa). The bracket finish is either
plain steel or hot-dipped galvanized in accordance with
ASTM A123.
4.2.1.2 FS288ES48 External Sleeve: The external sleeve
(FS288ES48) is manufactured from a 48-inch-long (1219
mm), 31/2-inch outside diameter (89 mm) and 0.216-inch
(5.49 mm) nominal wall thickness pipe conforming to ASTM
A500, as specified in the quality control documentation. One
end of the external sleeve has a 1.00-inch long (25.4 mm)
section trumpeted to a final outer diameter of 4.00 inches
(101.6 mm). The sleeve finish is either plain steel or hot-
dipped galvanized in accordance with ASTM A123.
4.2.1.3 FS288C Cap Plate: The FS288C cap plate is
manufactured from a 1-inch-thick (25.4 mm), 4-inch-wide
(102 mm), 8.25-inch-long (210 mm) steel plate. The steel cap
plate conforms to ASTM A572, Grade 65, having a minimum
yield strength of 65 ksi (448 MPa) and a minimum tensile
strength of 80 ksi (552 MPa). The cap plate assembly finish
is either plain steel or hot-dipped galvanized in accordance
with ASTM A123.
4.2.1.4 Threaded Rod and Nuts: The cap plate is attached
to the retrofit bracket with two 3/4-inch-diameter by 16-inch-
long (19.1 mm by 406 mm) threaded rods, and matching 3/4-
inch (19.1 mm) heavy hex nuts. The 3/4-inch-diameter (19.1
mm) steel threaded rods conform to ASTM A193, Grade B7,
having a minimum yield strength of 105 ksi (724 MPa) and a
minimum tensile strength of 125 ksi (862 MPa). The
matching 3/4-inch-diameter (19.1 mm) steel heavy hex nuts
conform to ASTM A563 Grade DH or DH3, or ASTM A194
Grade 2H. The threaded rods and nuts are zinc-coated in
accordance with ASTM B633, with coating classification
Fe/Zn 8.
4.2.2 PP288 Starter and Pier Tube Sections: The central
steel shaft of the starter and pier tube sections are 2.875-inch
outer diameter (73 mm) by 0.165-inch (4.19 mm) nominal
wall thickness hollow structural section in conformance with
ASTM A500 as specified in the quality control
documentation. Mechanical properties are listed in Table 1 of
this report. The starter tube includes a 1.00-inch-long (25.4
mm) by 3.375-inch (85.7 mm) outer diameter friction-
reduction collar machined from steel conforming to ASTM
A36 with a minimum yield strength of 36 ksi (248 MPa) and
a minimum tensile strength of 58 ksi (400 MPa). The starter
tube and pier tube shaft finishes are triple coated in-line
galvanized.
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 5 of 10
4.2.3 PP288 Shaft Couplings: The shaft coupling material is
factory crimped or plug-welded to one end of the tube section
and consists of 2.50-inch (63.5 mm) outer diameter by 0.180-
inch (4.57 mm) nominal wall thickness hollow structural
section in conformance with ASTM A53 Grade B, Type E &
S with a minimum yield strength of 35 ksi (241 MPa) and a
minimum tensile strength of 60 ksi (413 MPa). The pier tube
shaft coupling finish is plain steel.
4.3 PP237 Material information
4.3.1 Retrofit Bracket Assembly FS238B: The FS238B
bracket assembly consists of an FS238B bracket, an external
pipe sleeve (FS238ES48), a cap plate (FS238C), two
threaded rods, and matching nuts. The assembly is illustrated
in Figure 1 of this report.
4.3.1.1 FS238B Bracket: The FS238B bracket is constructed
from factory-welded, 0.250- and 0.375-inch-thick (6.35 mm
and 9.53 mm) steel plates. The steel plates conform to ASTM
A36, with a minimum yield strength of 36 ksi (248 MPa) and
a minimum tensile strength of 58 ksi (400 MPa). The bracket
finish is either plain steel or hot-dipped galvanized in
accordance with ASTM A123.
4.3.1.2 FS238ES48 External Sleeve: The external sleeve
(FS238ES48) is manufactured from a 48-inch-long (1219
mm), 27/8-inch outside diameter (73 mm) and 0.203-inch
(5.16 mm) nominal wall thickness pipe with a factory-welded
end ring which consists of a 0.75-inch long (19.1 mm), 33/8-
inch outside diameter (85.7 mm) and 0.188-inch (4.78 mm)
nominal wall thickness pipe. The external sleeve shaft and
end-ring conforms to ASTM A500 and ASTM A53,
respectively, as specified in the quality control
documentation. The sleeve finish is either plain steel or hot-
dipped galvanized in accordance with ASTM A123.
4.3.1.3 FS238C Cap Plate: The FS238C cap plate is
manufactured from a 0.5-inch-long (12.7 mm), 27/8-inch
outside diameter (73 mm) and 0.203-inch (5.16 mm) nominal
wall thickness pipe that is factory welded to a 0.75-inch-thick
(19.1 mm), 3.75-inch-wide (95 mm), 5.75-inch-long (146
mm) steel plate. The steel pipe conforms to ASTM A53,
Grade B, Type E and S, having a minimum yield strength of
35 ksi (241 MPa) and a minimum tensile strength of 60 ksi
(413 MPa). The steel cap plate conforms to ASTM A572,
Grade 50, having a minimum yield strength of 50 ksi (345
MPa) and a minimum tensile strength of 65 ksi (448 MPa).
The cap plate assembly finish is either plain steel or hot-
dipped galvanized in accordance with ASTM A123.
4.3.1.4 Threaded Rod and Nuts: The cap plate is attached
to the retrofit bracket with two 5/8-inch-diameter by 14-inch-
long (15.9 mm by 356 mm) threaded rods, and matching 5/8-
inch (15.9 mm) standard hex nuts. The threaded rods conform
to ASTM A193, Grade B7, having a minimum yield strength
of 105 ksi (724 MPa) and a minimum tensile strength of 125
ksi (862 MPa). The matching standard hex nuts conform to
SAE J995 Grade 8. The threaded rods and nuts are zinc-
coated in accordance with ASTM B633, with coating
classification Fe/Zn 8.
4.3.2 PP237 Starter and Pier Tube Sections: The central
steel shaft of the PP237 starter and pier tube sections are
2.375-inch outer diameter (60 mm) by 0.154-inch (3.91 mm)
nominal wall thickness hollow structural section in
conformance with ASTM A500 as specified in the quality
control documentation. Mechanical properties are listed in
Table 1 of this report. The starter tube includes a friction
reduction collar factory welded to one end. The collar
consists of a 1.00-inch-long (25.4 mm), 27/8-inch outside
diameter (73 mm) and 0.203-inch (5.16 mm) nominal wall
thickness pipe conforming to ASTM A53, Grade B, Type E
and S, having a minimum yield strength of 35 ksi (241 MPa)
and a minimum tensile strength of 60 ksi (413 MPa). The
starter tube and pier tube shaft finishes are either plain steel
or hot-dipped galvanized in accordance with ASTM A123.
4.3.3 PP237 Shaft Couplings: The PP237 shaft coupling
material is factory crimped to one end of the tube section and
consists of 2-inch (50.8 mm) outer diameter by 0.187-inch
(4.75 mm) nominal wall thickness hollow structural section
in conformance with ASTM A500 Grade C, with a minimum
yield strength of 46 ksi (317 MPa) and a minimum tensile
strength of 62 ksi (427 MPa). The pier tube shaft coupling
finish is either plain steel or hot-dipped galvanized in
accordance with ASTM A123.
5.0 IDENTIFICATION
The push pier foundation system components described in
this report are identified by labels that include the report
holder’s name (Supportworks, Inc.); the name and address of
Behlen Technology & Manufacturing Company, Behlen
Manufacturing Company, PowerBrace, or TSA
Manufacturing; the product name, the model number (PP288
or PP237); the part number; and the IAPMO UES evaluation
report number (ER-289). The IAPMO Uniform Evaluation
Service Mark of Conformity may be used as shown below
or
IAPMO UES ER-289
6.0 SUBSTANTIATING DATA
6.1 Data in accordance with IBC Section 1810.3.1.4.
6.2 Test Reports for compression loading Push Pier
Foundation System
6.3 Engineering Calculations
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 6 of 10
7.0 STATEMENT OF RECOGNITION
This evaluation report describes the results of research
completed by IAPMO Uniform Evaluation Service on
Supportworks, Inc. Model PP288 and PP237 Push Pier
Systems to assess conformance to the codes shown in
Section 1.0 of this report and serves as documentation of the
product certification. Products are manufactured at locations
noted in Section 2.16 of this report under a quality control
program with periodic inspection under the supervision of
IAPMO UES.
For additional information about this evaluation report please visit
www.uniform-es.org or email us at info@uniform-es.org
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 7 of 10
FIGURE 1 - FS288B, FS288BL, FS288BL2, and FS238B Retrofit Bracket System Components
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 8 of 10
TABLE 1 - MECHANICAL PROPERTIES OF PUSH PIER SHAFTS
Mechanical Properties
Un-corroded After 50 Year Corrosion Loss
Plain Steel Plain Steel Hot-dip Galvanized
PP288 PP237 PP288 PP237 PP288 PP237
Steel Minimum Yield Strength, Fy 50 ksi 60 ksi 50 ksi 60 ksi NA 60 ksi
Steel Minimum Ultimate Strength, Fu 55 ksi 70 ksi 55 ksi 70 ksi NA 70 ksi
Modulus of Elasticity, E 29,000 ksi 29,000 ksi 29,000 ksi 29,000 ksi NA 29,000 ksi
Nominal Wall Thickness 0.165 in. 0.154 in. 0.165 in. 0.154 in. NA 0.154 in.
Design Wall Thickness 0.153 in. 0.143 in. 0.117 in. 0.107 in. NA 0.133 in.
Outside Diameter, OD 2.875 in. 2.375 in. 2.839 in. 2.339 in. NA 2.365 in.
Inside Diameter, ID 2.569 in. 2.089 in. 2.605 in. 2.125 in. NA 2.099 in.
Cross Sectional Area, A 1.31 in2 1.00 in2 1.00 in2 0.75 in2 NA 0.93 in2
Moment of Inertia, I 1.22 in4 0.63 in4 0.93 in4 0.47 in4 NA 0.58 in4
Radius of Gyration, r 0.96 in. 0.79 in. 0.96 in. 0.79 in. NA 0.79 in.
Elastic Section Modulus, S 0.85 in3 0.53 in3 0.65 in3 0.40 in3 NA 0.49 in3
Plastic Section Modulus, Z 1.14 in3 0.71 in3 0.87 in3 0.53 in3 NA 0.66 in3
For SI: 1 inch = 25.4 mm, 1 kip = 1,000 lbf = 4.448 kN
TABLE 2 - PP288 AND PP237 (WITH RETROFIT BRACKET) ASD COMPRESSION CAPACITIES
Bracket Part
No.1 Sleeve Part No.1 Bracket Description
Allowable Compression Capacity (kips)
Bracket Shaft Soil Foundation
(P1)2 (P2)3 (P4)4 System5
FS288B or FS288ES48 or PP288
Standard Bracket w/48" Sleeve 28.5 29.4 30.0 28.5 FS288B-G FS288ES48-G
FS288BL or FS288ES48 or PP288
Low Profile Bracket w/48" Sleeve 25.4 29.4 30.0 25.4 FS288BL-G FS288ES48-G
FS288BL2 or FS288ES48 or PP288
Low Profile Bracket w/48" Sleeve 24.1 29.4 30.0 24.1 FS288BL2-G FS288ES48-G
FS238B FS238ES48 PP237
2 3/8” Pier Bracket w/48" Sleeve
12.9 20.0 15.0 12.9
FS238B-G FS238ES48-G 15.9 24.9 15.0 15.0
For SI: 1 inch = 25.4 mm, 1 kip = 1,000 lbf = 4.448 kN
1Part numbers with "G" suffix indicate hot-dip galvanized coating. Part numbers without a "G" suffix indicate plain steel.
2Bracket capacities are based on full-scale load tests and assumes a minimum concrete compressive strength (f´c) of 2,500 psi (17.24 MPa).
3Shaft capacities are applicable only to foundation systems that are fully braced as described in Section 3.2.3 of this report.
4Soil capacities are determined by taking the final drive force during installation and dividing it by a minimum factor of safety of 2.0.
Maximum drive force shall not exceed 60.0 kips for the PP288 system and 30.0 kips for the PP237 system.
5Foundation system allowable capacities are based on the lowest of P1, P2, and P4 listed in this table. Section 3.2.5 of this report describes
additional requirements.
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 9 of 10
INTERNATIONAL RESIDENTIAL CODE® (IRC) SUPPORTWORKS, INC. 11850 Valley Ridge Drive Papillion, Nebraska 68046 www.supportworks.com kolson@supportworks.com SUPPORTWORKS PP288 AND PP237 PUSH PIER SYSTEMS
CSI Section: 31 62 00 Driven Piles
1.0 RECOGNITION
Supportworks, Inc. Models PP288 and PP237 push pier
systems recognized in ER-289 comply with the intent of the
provisions of the following codes and regulations when
subject to the additional requirements of this supplement:
• 2018, 2015, 2012, and 2009 International
Residential Code® (IRC)
2.0 LIMITATIONS
Use of Models PP288 and PP237 push pier foundation
systems recognized in this supplement are subject to the
following additional limitations specific to the IRC, when
installed in accordance with ER-289:
2.1 When a geotechnical report, as required and defined by
Section 2.11 and Section 3.2.1, respectively of ER -289 is not
available, the proof-testing requirements of Section 3.3 of
this supplement shall be satisfied. The building official may
require a soil test in accordance with the 2018, 2015, and
2012 IRC Section R401.2 and 2009 IRC Section R401.4,
where, based on quantifiable data, the presence of
questionable soil characteristics such as expansive,
compressible, or shifting soils are likely.
2.2 Special inspections as required and defined in Section 2.8
and Section 3.4 respectively, of ER-289 are not required
when the push piers are installed under the provision of the
IRC.
2.3 Installation shall be in accordance with Section 3.3 of ER-
289. Proof testing shall be performed by installers certified
and trained by Supportworks.
2.4 This supplement expires concurrently with ER-289.
3.0 PRODUCT USE
3.1 General: Supportworks, Inc. Models PP288 and PP237
push pier systems are used to support foundations of existing
residential structures or to provide additional axial
compression capacity to existing foundation systems
supporting lightweight construction.
3.2 Design: Design values may be determined in accordance
with Section R301 of the IRC or Section 3.2 of ER-289.
3.2.1 System Capacity: The ASD allowable capacity of the
push pier foundation system in compression depends upon
the analysis of interaction of brackets, shafts, and soils; and
shall be the lowest value of P1, P2 as defined in ER-289 and
P4 as defined in Section 3.2.2 of this supplement.
3.2.2 Shaft Capacity (P2): When a geotechnical evaluation
report is available, the foundation systems shall be considered
to be fully braced when installed as defined in Section 3.2.3
of ER-289. When a geotechnical evaluation is not performed,
the foundation system shall be considered to be fully braced
when piers meet the proof testing requirements of Section 3.3
of this supplement.
3.2.3 Soil Capacity (P4): For determination of allowable soil
capacity in axial compression, a minimum factor of safety of
2.0 shall be used.
3.3 Proof Testing: Proof testing, if required, shall be
performed on the first push pier installed after the final drive
force has been applied and removed. The proof test shall
follow the procedure defined in Section 3.3.1 of this
supplement and shall meet the acceptance criteria in Section
3.3.2 of this supplement.
3.3.1 Test Procedure: The proof test shall be performed with
calibrated equipment. A measuring device consisting of a dial
or electronic displacement indicator shall be setup on a
reference beam to eliminate pier or foundation movement
influence on the displacement indicator readings during
testing. The displacement indicator shall be setup to monitor
pier head movement upon application of load. The proof test
shall maintain the specified loads and hold times shown in
the Proof Test Schedule in this section.
Proof Test Schedule
Load
Step Load Hold Time
(min)
1 AL (0.05DL) 2.5
2 0.25DL 4
3 0.5DL 4
4 0.75DL 4
5 1.0DL 10 or 60
An alignment load (AL) shall be applied prior to the start of
the test using a maximum of 5% of the anticipated design
service load (DL). After application of the alignment load,
the displacement indicator will be reset to zero prior to
starting the proof test.
Number: 289
Originally Issued: 01/16/2015 Revised: 12/06/2021 Valid Through: 01/31/2022
Page 10 of 10
Displacement indicator readings shall be taken at the start and
end of each hold time and the specified load must be
maintained during the hold time. At the 1.0DL load increment
(load step 5), displacement indicator readings shall be taken
at 0, 1, 6, and 10 minutes. At the 1.0DL holding time, the
displacement during the first log cycle of time is the amount
of movement between the 1 and 10 minute readings. If the
movement during the first log cycle of time is more than
allowed in Section 3.3.2 of this supplement, the load will be
maintained to obtain readings for the second log cycle of
time, which is defined as the movement between the 6 and 60
minute readings.
3.3.2 Acceptance Criteria of Proof Testing: The proof test
shall be acceptable if the total movement during the first log
cycle of time (1 and 10 minute readings) at the 1.0DL load
increment is 0.040 inch or less. If the movement is more than
0.040 inch, the 1.0DL load increment shall be held for an
additional 50 minutes to obtain the movement during the
second log cycle of time (6 and 60 minutes). The proof test
shall be acceptable if the total movement during the second
log cycle of time is 0.080 inch or less. If the total movement
is more than 0.080 inch during the second log cycle of time
measurement, the pier shall be derated to a design capacity
that meets the proof test failure criteria.
3.4 Field Reports: A push pier installation report shall be
prepared documenting the design loads, pier locations,
bracket and pier types, pier inclinations, drive forces applied
during the installation of each pier section, final drive forces,
final depths and push pier lock-off loads.
If proof testing is required, a proof-test report shall be
prepared documenting the test setup, equipment calibrations,
pier head deflection readings at the start and end of all loading
intervals and confirmation that the acceptance criteria has
been met. Piers that have had the design load decreased based
on proof testing shall be detailed in the field reports and the
registered design professional’s calculations. The field
reports shall be reviewed and sealed by a registered design
professional. If required, the proof-test report shall be
submitted to the building official for approval within 10 days
after the proof testing.