HomeMy WebLinkAboutNaranja Ave 164, Reroof formST, LUCIEWORKS
Section A (General lnformation)
Master Permit No.Process No.
Contractors Name:{
E3 Low Slope
Shingles
E New roof D Repair
CC Caslsqq
q^@ 3uq53
3cc
{.. L
License #
lob fri
ROOF CATEGORY
E Mechanically Fastened Tile tr Mortar/Adhesive Set Tiles
E Metal Panel/Shingles EWood Shingles/Shakes
tr Prescriptive BUR-RAS 150
ROOF ROOF TYPE. ,-.
E Maintenance )6 xdroofing fl Recovering{"
ROOF SYSTEM I
Low Slope Roof Area (SF) _ Steep Sloped Roof Total (sF)
Section B (Roof Plan)
Sketch Roof Plan: lllustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
lnclude dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets.
t \\
I
t.4t *\h
\v N \V4
1'7 L ()
*
\
N \
r
t,,\
\\
sT. LUCTE W#Fqffiffi
Section D (Steep Slope Roof System)
Roof System Manufacturer:
(LS
NoticeofAcceptanceNurnber:
F*rfub \ b _ W
Minimum Design Wind Pressures, lf Applicable (From RAS 127 or Calculations):
Zone L:-Zone Ze'.-.Zone 2n:-.Zone 2c-Zone 3e:-Zone 3r:
DeckType:
Type Underlayment
lnsulation:
Fire Barrier:
FmtenerType & Spacing:
Adheshn Type:
Type Cap Sheet
Mean Roof'Height:,t{Roof Covering:
Type & Sire Drip
Edge:
L&w'sr*)
WnW,
{roO
loof Slope;3 :12
/ltJ