Loading...
HomeMy WebLinkAboutAir Barrier, Insulation Inspesction2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name, GREEN ADDITION Builder Name: Street 109 MAIN STREET Permit Office: City, State, Zip., FT. PIERCE, FL, PerrM Number. Owner Jurisdiction: ua X Design Location. FL, Fort Pierce . COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION ; CRITERIA General A continuous air barrier shall be installed In the building envelope. Air"aneatife insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed, Ceffing/attla The air barrier in any dropped ceiling/soffit-shall be aligned with *gaps The insulation In any dropped ceifing/soffit. the Insulation and any in the air barrier shall be sealed. shall be aligned with the barrier. air Access openings, drop down stairs or knee wall doors to unconditioned attic spaces %shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of flame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity seated. With a material having a thermal resistance of 11-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for flamed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between wi ndoW/doarjambs and framing, and and doors skylights and framing shall be sealed. Pim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors. The air, barrier shall be installed at any exposed.edgO of Floor -framing cavity insulation shalt bal-installed .t.o (including insulitibn.',� 6ialntaln permanent contact with the undersid 6 of above -garage subilloor decking, or floor framing cavity Insulation and cantilevered shall he permitted to be in contact WM the1op. sidle floors) of sheathing, or continuous Insufatto n Installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor ffilimirij members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Whom provided instead of floor insulation, Insulation a Class 1, vapor retarder with overlapping joints taped; shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shaft opening to exterior or unconditioned space.shall be seated. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be rifled by insulation that on installation readily conforms to the avalfable.caft spaces. Garage separation Air sealing shall be. provided between the garage and conditioned spa c Bs. .Recessed lighting Recessed light fixtures installed in the building thermal erivelope Recessed light ftures, Installed in.the the building, shall be sealed to the drywall. thermal envelope shall be air tight and 10 rated. Plumbing and wiring Batt InsWation shall be cut neatly to fit around Wiring and plumbing In exterior walls, or insulation that an installation readily conforms to available space shall extend bahind alging and wiring. Showeritub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and'tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electricallphone box or The air barrier shall be Installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be seated to the sub -floor or drywall, Concealed When required to be sealed. concealed fire sprinklers shall only be sprinklers sealed In a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or. callinas. a. in a0dition, inspection or log walls snail oe in accomance wan the provisionti of lk;U-4UQ. WS/2020-10.,03 AM EnergyGaugeg USA 6.0.02 (Rev. 11) - FlaRW017 FBC 6th Edition (2017) Compliant Software Page 1 of 1