Loading...
HomeMy WebLinkAbout21-139B - Bryn Mawr Condos 2021 - Bldg B - Rep 4 - 01.26.22M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139B Report No. 4 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 2 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. B 5059 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0406 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. B DATE: January 26, 2022 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Overcast / Rain WORK INSPECTED: Common walkways • Waterproofing and topcoat finish at the 1st, 2nd, 3rd, and 4th floors. • Railing posts and top caps at all floors. (1st through 8th.) OBSERVATIONS: • Waterproofing and topcoat in progress at all repair areas from the 1st through 4th floors. • All cracked railing posts have been replaced at all floors. • Cracked railing top caps have been repaired and stucco finish is in progress. RECOMMENDATIONS: • None at this time. Contractor is scheduled to mobilize to the west of the building next week and shall begin the limited access balcony repairs. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139B Report No. 4 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 2 Pic 1 – Unit 404 Surface spall repair area ready for waterproofing. Pic 2 – 8th Floor Top cap railing repair Pic 3 Railing post replacement