HomeMy WebLinkAboutMobile Home Tie Down Permit ChecklistPLANNING & DEVELOPMENT SERVICES DEPARTMENT
Mobile Home Tie Down Permit Checklist
When you submit your building permit application for a tie -down of a Mobile Home, or Park Model, you should
use the following checklist to determine if your application submittal is complete. Only complete applications
will be accepted for processing. Please call our staff in Growth Management at 772-462-1553 if you have any
questions.
4T, t
H 0, ?
COMMENTS..........
Building Permit
1
A completely filled out building permit application must be
Application
submitted, including all required information and enclosed
forms. The application must be signed by the applicant and
notarized.
Notice of
I
A recorded Notice of Commencement for all construction with
Commencement
a value exceeding $2,500 has to be submitted at time of
building permit application.
Permit Worksheets
2
Two (2) complete drawings showing all methods of tie -downs,
describing 3 way strapping, blocking, piers, anchor types,
locations, etc. Drawings to be of the exact unit being installed.
Detail each type of system to be used on plans. Installations
sheets and set-up manuals.
Set-up Manuals
2
Manufacturer's set-up and installation manual.
Blocking Diagrams
2
Provided by manufacturer.
Surveys
2
Surveys are required for all building permits involving a
Plot Plans
primary structure, and for all accessory structures with a
construction value exceeding $ 10,000. The surveys must be
signed/sealed by a registered Florida surveyor. All surveys
must be stamped by the Health Department if a septic permit is
required.
Parking Spaces
The survey must show the location of the parking spaces.Two
8x 18 parking spaces are required for Mobile Homes.
Subcontractor
1 each
One subcontractor agreement with original signature is
Agreement for Electric,
required for each subcontractor on the job. The building
Plumbing & HVAC
permit cannot be issued until it has been determined that all
subcontractors are properly licensed and registered. The use
of unlicensed contractors is strictly prohibited.
� '� �v F
rry�,
�V, tt �
� •as txa x �;nn ;+�t',.�4t� 'Sy?�4`�a��'a � R 'r�.'A .d. ,$1" wmi '$9 ''y"-. "+ �r ttt^a'y3J 4` Y„
,- ,N'
x'Sl�.5. �'St
Filled Lands Affidavit
1
This form is required for all construction, except for interior
renovation. It must bear the original notarized signature of the
property owner. This affidavit serves to notify the property
owner of their responsibility not to adversely impact their
neighbor's properties with storm water drainage and runoff.
Penetrometer Test
1
Required with permit application, just be signed by the Tiedown
Contractor.
Stair Details
2
Must meet requirements for stairs and landings per FBC and
include anchoring details.
County Health
1
If you are planning to use a new or expanded septic tank, or if
Department Septic
you are adding bathrooms, you must first obtain Health
Tank Permit
Department approval for the system. All floor plans and all
surveys plans must bear the original Health Department
approval stamp.
Recorded Warranty
1
If the property has been purchased within the last six months,
Deed
our records may not yet be to date. In this case we must see a
recorded warranty deed in your name to verify ownership.
Flood Elevation
1
If your property is located within a designated flood zone you
Certificate
are required to file an original flood elevation certificate
signed/sealed by a Florida registered surveyor no later than 21
days following the pouring of the first habitable floor.
Vegetation Removal
1
All residential properties of any size and all commercial or
Permit
industrial projects require a completely filled out vegetation
Need (1) survey or Plot
removal application. A specific plan for tree removal and
Plan
preservation is required. If you have any questions please
contact the Environmental Resource Department at 772-
4622526.
Mobile Home
2
Must be prepared, signed and sealed by a Florida registered
Inspection Reports
professional engineer or architect.
(for relocation only)
Copy of Title (for 2 Copies of both sides of title are required. If multiple units,
relocation only) provide copies for all.
❖ Additional information beyond that contained in the above checklist may be required in order to ensure a
complete review of your building permit application.
❖ All impact fees will have to be paid at the time of permit issuance.
❖ You are required to call for all inspections as indicated on your building permit and for a final inspection.
SLCPDSD 06/15/2010
Rev. 8/29/18