Loading...
HomeMy WebLinkAboutEngineering 12/30/2021 Rafael A. Gonzalez Soto, P.E. 255 Giralda Ave 5th floor Coral Gables, Florida PE#83104 (833) 888 3644 admin@engipartners.com Owner:Chung Mark 7469 Commerical Circle Fort Pierce 34951 a�11-a ay3 To: Authority Having Jurisdiction (AHJ), Owner, Contractor, & Others Interested Subject: Solar Installation Roof Inspection Madam/Sir: To whom it may concern, I certify that the existing spacing for the Protea brackets can support the load of the installed solar system. The inspection verified that the roof installation is'inside parameters and meet the required safety factors. S-5! Protea brackets were used to anchor the railing system as: • Ribs located approximately every 27 in apart in mid sections and 18 in apart for end sections. • Four self tapping screws of 1/4"X 1"were used to attach the brackets to the ribs portion. I have completed inspection and verified the installation was completed per plans and installed,per specs and our lags hit every rafter. Digitally Respectfully, signed by o p,GOHZq�F., Rafael A 830, *=_Gonzalez Soto - it. nA,E ; =Date: 90�:�oQyop a«� 2021.1230 1637.42 Rafael A. Gonzalez Soto, PE -05'00' Page- 1 ) 1