HomeMy WebLinkAboutEngineering 12/30/2021
Rafael A. Gonzalez Soto, P.E.
255 Giralda Ave 5th floor
Coral Gables, Florida
PE#83104
(833) 888 3644
admin@engipartners.com
Owner:Chung Mark
7469 Commerical Circle Fort Pierce 34951
a�11-a ay3
To: Authority Having Jurisdiction (AHJ), Owner, Contractor, & Others Interested
Subject: Solar Installation Roof Inspection
Madam/Sir: To whom it may concern,
I certify that the existing spacing for the Protea brackets can support the load of the
installed solar system. The inspection verified that the roof installation is'inside
parameters and meet the required safety factors.
S-5! Protea brackets were used to anchor the railing system as:
• Ribs located approximately every 27 in apart in mid sections and 18 in apart for
end sections.
• Four self tapping screws of 1/4"X 1"were used to attach the brackets to the ribs
portion.
I have completed inspection and verified the installation was completed per plans and
installed,per specs and our lags hit every rafter.
Digitally
Respectfully, signed by
o p,GOHZq�F., Rafael A
830, *=_Gonzalez Soto
- it. nA,E ; =Date:
90�:�oQyop a«� 2021.1230
1637.42
Rafael A. Gonzalez Soto, PE -05'00'
Page- 1 ) 1