Loading...
HomeMy WebLinkAbout1-31-22 Oceana I Inspection Report(digital)21033-6-Oceana One N(major) Breitenbach Engineering, Inc Tel: 772-834-4743 4853 SE Pilot Way, Stuart, FL 34997 Attention: Lisa Pepperella e-mail: tgrassijr561 @gmail.com Condo Assoc: joceana of Hutchinson Island, Inc 9940 S. Ocean Drive I 'Jensen Beach, FL 34857 By: Permit Number: SLC 2105-0054 Job Number: 21033-6-Oceana 1 N info(a�concreterepairing. net Contact: Rita Collazo Contractor: Daniello, Salizar & Sons, Inc Address: 2708 N. Australian Ave, #9, WPB 33407 ohn D. Breitenbach, PE Tel: 772-834-4743 'E #59770 SI #2072 johnbach442@gmail.com Date Hours Description Day Time Comments Gate Code: 1#7272 Billing Method: 1 2.00% Pass/Fail Administrative Review specs, dwgs, set-up spreadsheets n.a. 3126/21 Site meeting 4/20/21 Letter of Intent progress 8110/21 Weekly meeting Tues 10:00 General over review n.a. 8/17/21 Weekly meeting Tues 10:00 General discussion n.a. 8124/21 Weekly meeting Tues 10:00 General discussion, inspect unit 203 progress 8131/21 Weekly meeting Tues 10:00 General discussion n.a. end of April -August lAdministrative, reports & mailing emailed 9/7/21 Weekly meeting Tues 11:30 General discussion progress 9114/21 Weekly meeting Tues 11:30 General discussion progress 9121/21 Weekly meeting Tues 11:30 General discussion progress end of September Administrative, reports & mailing n.a. 10/2/21 Weekly meeting Tues 11:30 General discussion, unit 203 done passed Inspect unit 201 progress 10/19/21 Weekly meeting Tues 11:30 Stack 10, all floors progress 10/26/21 Weekly meeting Tues 11:30 General audience Q & A n.a. end of Octobe Administrative, reports & mailing n.a. 11/2121 Weekly meeting Tues 11:30 Unit 901, bar defects, see memo progress 11/9/21 Weekly meeting Tues 10:00 Stack 5, all floors, inspect specific rails progress 11/16/21 Weekly meeting Tues 10:00 1 new proposed post bracket design progress 11/22/21 Weekly meeting Tues 10:00 inspect railing posts @ catwalks 5 & 8; Unit 801 progress 11/30/21 Weekly meeting Tues 10:00 general discussion; unit 801 still in demo progress end of November I Administrative, reports & mailing 12/7/21 Weekly meeting Tues 10:00 Stack 5 demolition progress 12/24/21 Weekly meeting Tues 10:00 Stack 10 demolition progress 12/28/21 Weekly meeting Tues 10:00 1001 column inspection,partial demo progress end of December jAdministrative, reports & mailing 1/11/22 Weekly mg ralgglp Tues 10:00 Stack 1, all floors, 601 column issue progress 1/8122 Weeks' F ues 10:00 general discussion, stack 1 progress 1125/22 W m eting s 10:00 general discussion, stack 5 almost done progress !a ', Administrative, reports & mailing GO TO PAGE 2 BREITEN"', ThBrtem has bee" dlgallly signed REPORTS WI 1 ??N.€xs ap�ti ; gaadga°sPga°seasd"daa PEIED _ ra.. i Ilysig [sd��d cnnaea co .es onh�s doc�mem are inspections are pe y S eQQCC sp R er a permitted pan n P:., n.� o �,� ",<"nslderedaigneda"dsealeda"d Concrete "'rorzro?:�'��" [rye signature must be verified "n any. Repair Institute (ICRIf;, 1 q a�'/1��1ll/IIIJJJJ llll{lllllll�iii 31 ". address concrete restoration. City an m '°", SsoNA elec copse Total Hrs: 0.00 ` • ,;.,..,,.la��t` See Letter of Intent and the Engineer's Plans &Specifications for additional information. Send via: [ x ] e-mail, (digital) [ ] U.S. Mail [ x ] Contractor [ x ] CSM Engineers [ ] Condo Association page One file = c:112021-Projects%CSM Nling with building department