Loading...
HomeMy WebLinkAboutBuilding PlansHYDRO VENT (5) THIS SIDE STRUCTURAL NOTES: • SOIL BEARING CAPACITY MIN. 2500 P5F * ALL 571zZUGTURAL CONCRETE SHALL DEVELOP A MIN. COMPRE551VE 5TRENGTH OF 3000 P51 AT 25 0iAY5. • ALL REINFORCING 5TEEL SHALL BE GRADE 60 ry MEETING A5TM 5FE05 A-615 • MIN. CONC. PROTECTION FOR RE-5AR5: FT65:5" 5EAM5:1V 5LAB5: 1" r • LAP REINFORCING BAR5 30 INCHES MINIMUM EXP05URE "C" — 1-70 MF'H 3 SEC QUA PROVIDE 5OX34 6 - ALUM ACCESS NOTE: DOOR. THE FOUNDATION/PIER 5Y5TEM 15 DESIGNED TO RE515T FLOOD ELEMENT5 OF FLOTATION, I COLLAPSE AND LATERAL MOVEMENT PER FEMA CRITERIA FOR EXP05URE "C" LOCATIONS. ACCE55 DOORS TO BE BUILT ON A 1" X 2" OPEN BACK FRAME SECURED WITH #10 X 2" 5HEET METAL 5GREW5, WITH A HALF-Z WRAP (#5 X 3/4" TEK5 ON THE FACE); DOOR SLAB 15 5GREEN DOOR MAINFRAME #10 X 1" 5HEET METAL 5GREW5 INTO AN INTERNAL ALUMINUM CORNER NITM .024 5TUCCO COIL FOR THE FACE OF THE DOOR. ATTAC 4:5 TO FRAME WITH 2 5TANDARD 5GREEN DOOR OFFSET H IN6 E5, 5TANDARD 5GREEN DOOR LATCH FOR HARDWARE. . CONCRETE THICKENED EDGE: S"D X 81N W/ (1) #5 RB CONT CONCRETE EXTEN51ON G REQUIRED ALONG ENTIRE 11 6,. LENGTH OF CARPORT (FOR FUTURE IMPROVEMENT) SEGTION B-B SCALE: 3/4" = I'-0" UNIT TO BE TIED DOWN PROVIDE BOX50 r- ALUM ACCESS --+- \\l Bill \ I� 'ion ESE -, -1 q-= Fz= SEE STAIR DETA ff DECK DETAILS HYDRO ENT 5) TH15 51DE 5(, IGH t--v_a,,VINY RAIL A j�> I r-- PROVIDE 3OX50 1 ALUM ACCESS ­-4 I 5'- HYDRO VENT (5) TH15 SIDE PROV105/S" TOUGHROGK FIRE GUA GYP. BOARD (BOTH SIDES WALL) (U305) 1 HOUR L 37-0" ON ZERO LOT LINE15VE TIE-DOWN/PIER REQUIREMENTS I PROVIOE (2) #9 X 2--f' 2X 5YP DECK 5GREW5 TOE -NAILED v v AT EACH VERTICAL MEMBER OF KNEE WALL TIE DOWN STRAP PER SPECIFICATIONS WALL COMPLIES WITH UNIT MANUFACTURER'S PERIMETER WALL BLOCKING REQUIREMENT I -BEAM HYDRO VENT 5EE PLAN SEE all all 16" P.T. 5YP KNEE WALL W/ STUDS @ 16" OG GB5 BLOCK W/ Y4"XB" TAP -CONS @ 24" Or - PIERS l (BOTTOM PLATE) W/ ' COX PLYWOOD COVERED W/ /V' CEMENT BOARD 1^L' IN TYVEX W/ HARDI LAP SIDING 4" SLAB W/ RB XX Q H i j SEE TIE -DOWN/ } PIER REaUIREMENT5 cV U_ ( L 01 5/s"x 7" Y`IEDGE ` GONG F E7E THICKENED EDGE: /� I `� MI052 ANCHOR ANCHOR (RED HEAD) 8"D X W W (1) #5 RB GONT ' (SEE DETAIL) 01-� V�� P •�" QV�k� TA \ J SECTION A -A SCALE: 3/4" = 1'-0" RM1 TECH TD BRACKET5 GU CONDEN5ING UNIT (3) SELF TAPPING METAL 5GREW5 3�6" X 1 Y4' TAPGON A/C TIE-DOlNN PE A CONCRETE'AD I -BEAM PART # 5c1002 STRAP/SWIVEL CONNECTOR FACTORY -� WELDED BRACKET FRAME ATTACHMENT FOR FACTORY BRACKETS CONCRETE UNIT WT. 360 LES. 55.3 OFT (1) Y4" X 2Y4' LG. TAPCON PER BLOCK d (2) AT CONCRETE: 180 LBS. FIER DETAIL. B-BOLT 5-BOLT SOME HOMES MAY HAVE FACTORY BRACKETS WELDED TO THE I -BEAMS FOR LONGITUDINAL ANCHORS. ATTACH THE 5TRAP/5AVEL CONNECTOR TO THE FACTORY BRACKETS USING A 2" ORADE 5 BOLT $ NU-7• ANGHOR5/TIES MUST BE INSTALLED TO PROVIDE A 450 OR LOWER 5TRAf` ANGLE. GONDEN5ING UNIT 51MP50N M5TC52 8X16 BLOCK 4 COURSE (2) #14 SHEET METAL 56REW5 TO GONDEN5IN6 UNIT. 200 LB. SHEER WORKING CAPACITY - - -1 X 2-3/4" P05T PIGKE" 5TORAAv- e 30"x40" IMP HYDf ZO VENT (5) T 415 SIDE 1'-4" 4'-4"4— - 0 ❑ p p 0 p p p I , I E� I PROVIDE Y2" MACHINE BOLT THRU I -BEAM i W/ (2) TIE DOWN STRAPS AT BOLT (2) MIG52 ANCHORS AT CONCRETE A5 SHOWN (SEE TIE DOWN ENGINEERING I—R—_—_—_—__OR17EE171NORMATg—_—_—_—_—_—_——_—_—_—_ —_—� —_I L -ICI--� � �I I 13 _ p p _ 0 _ p_'�0'� _ p _- -11 _ p 0 _ p _ p - p O - -- a __600 1'-4" 4'-4" 3'-9"0 4'-92" 4'-5" 4'-5 4'- 4'- 4'- 4'_1 I � IDE A" MACHINE BOLT THRU 1-BEAM 5"x16" CONCRETE FOOTING I W/ (2) TIE DOWN STRAPS AT BOLT W/ (2) #5 RB CONTINUOUS (2) MIG52 ANCHORS AT CONCRETE I AS 5HOWN (SEE TIE DOWN ENGINEERING FOR DETAILED INFORMATION) E----- ---- ----- ---- -- � p p p p p p p p I YYIIVLyJYY — — — — — — _ _ 5-2" 5-2' 5'-2" 5'-2" 5'-2" IT-4" SEE5HEET 5-2 FOR tu113a�'ni '1 ,4,jno0 GROS5 HATGHING STORAO ROOD FRAM INO , DENOTES SQ. FT. FOR PENT GALG'S TYP. MULT14NIDE TIE—�OkNN PLACEMENT HYDRO VENTS IN KNEE WALL TO BE SCALE: 1/4° = r-0° MODEL F5 1605 (50.7 SQ. IN. NET) PER 322.2.2. (1) 50. IN. FOR EACH 5Q. FT. OF ALL MATERIAL BELOW FLOOD MUST BE CONSTRUCTED ENCLOSED AREA. EACH VENT COVERS 50FT. PER PRODUCT APPROVAL.L. WITH FLOOD RE515TANT MATERIAL, IN ACCORDANCE WITH SECTION R322 OF THE 20201 (NTH EDITION) RESIDENTIAL BUILDING GORE. 535 5Q. FT. / 50 = 10 VENTS 4X4 5YP POST VINYL POST PER 408.2. EXGEt=TION (1) 5Q. F�. STAIR DETAIL PER 1500 SQ. FT. OF FLOOR ARE WITH VAPOR BARRIER. (1) SQ. FT. = 144 5Q. IN. NET VENT AREA 15 50 SQ. 9NOOMP051TE DECKING ATTACHED W/ (2) #10 2X6 5YP DECK VINYL RAIL JOISTS @ 16" OG 2X6 5YP 5TRINGER43 N; M . 144 / 50 = 2 VENTS GALV DECK 5GREW5 AT EACH BEARING POINT 2-#10 X 1" NON -CORROSIVE 5.M.5. @ EACH PICKET CONNECTION. TOP PLATE TO F05T 8 P05T TO CHANNEL W/ #10X1Y2'5.M.5. 2X8 5YP STRINGER 2X COMPOSITE DECKING ATTACHED W/ (2) #10 DECK FRAM INO DETAIL AT EACH BEARNGG POENT SCALE: 1/4" = I'-0" ' - NOTES: HAND RAIL 1D ETA I L 2-6ALV. BOLTS %"-11 X 2-3/4" L W/ HEX. 5a. NECK W/ NUTS N.T.S. TEN51ON BOLT LABELED (A) FOR 2X8 5YP DECK .O15T FRAME ATTACHMENT ONLY. ' S/S'Xi" WEDGE ANCHOR SUPPORT W/ (RED HEAD) TEN51ON BOLT LABELED (13) FOR (2) %" GALV LAG 5GREW5 VERTICAL TENSION. VINYL 2X2 RAIL POST AT GARAGE DECK OR G ATTACHED TO VINYL (2) Y.2 GALV MACHINE #10 5.5.5. MIN. CASTERS BOLTS 2" EMBEDMENT. AT EXTERIOR DEGK5 4-REa'D. MIG52 ANCHOR E BMIN. 1" EMBEDMENT. 5Y: TIE DOWN ENGINEERING C 4-RENGINEERING MAX UPLIFT PER COMPOSITE 2X6 5YP 51MP50N FACE MOUNT HANGER LU26 - 2X6 5YP DECK JOISTS @ 16" OG LENGTH VARIES 51MP50N MT51 STRAP 2X6 5YP 5TRINC,ER 51MP50N LU25 AT STAIR 5TRINGER5 TO 2X8 DECK J015T SUPPORTS OR (2) %" GALV LAC, 5GREW5 AT 5TRINC,ER TO P05T 2X COMPOSITE DECKING ATTACHED W/ (2) #10 GALV DECK 5GREW5 AT EACH BEARING POINT 4X4 PT P05T W/ SIMPSON A544 '5 2X12 5YP 5TRINC,ER 2X12 5YP 5TEP 1XS 5YP W/ DECK 5GREW5 5/la" X 3" GALV. HEX 5GREW5 4-REO'D. NOLE •APCON5 TREAD + 1" NOSE 5TA I fit DETAIL NOTE: HANDRAIL BRACKETS OR BALU5TER5 N.T.S. SHALL NOT BE WN51DEREP TO BE OBSTRUCTIONS TO GRA5PA5ILITY. BOTTOM OF HANDRAIL SHALL CONTINUE TO SLOPE FOR A DISTANCE OF THE DEPTH OF ONE TREAD FROM BOTTOM RISER. HANDRAIL HAS CIRCULAR GRO55-SECTION `9 W/ 1 Y4" TO 2" DIMENSION. m NOTE: t ----- GUARDRAIL SHALL COMPLY W/ FBG 2020 (7TH EDITION) A #5 GALV 5GREW5 (2) EACH SIDE 4X4 5YP P05T ATTACHED TO GONG W/ 51MP50N AB44 POST BASE DEVICE 15 4,150 LB5 DECKING STRINGER Rf�ILING BASE N.T.S. — ------------ CONCRETE IY2" WEDGE ANCHOR W/ 3" EMBEDMENT MIN PFDECKCONNECTIONDETAIL TYPICAL ELEv,ATION5 FOR DECKS SCALE: I/2" = I'-0" N.T.S. (FOR VISUAL PUWOSES ONLY) THIS 51[tTUP HAS BEEN DE5I6NED FOR A FLOOD ZONE INSTALLATION DE516N GORE FBG — 2020 ('7TH EDITION) LB) Architecture AA20005774 W SW nALNrLL AM POPT SAIRT LUC � rL. 54V 772-800-5700 www.b]ar(hitc(ture.(om OF FLOC S. Mcc fd ti 1 `4 E D P, 62 0 IL. lLJ 0 ry p 0 "-' F~-- r v 4 0 Cl_ DO(UnlnT DATE: 11.9.2021 Revisions 11% TOUR PROW55 MAIT DATE 1 6UILDIM DIPARTAMT (OMM FITS 09.212020 2 PIER MAWS 1222202--------------- c.,1t cor L a t. e LU LU In �� -�/ x LE 1 O T -1 m O LU Q O O VM lSl < %Z n O P m � St1eeT TITLE: FOUNDATION PLAN & DETAILS SHEET nur\SeQ: � Architecture AA26003774 T M HALKLL AVCRUC POPT SA ITT LUC C 134V 772-800-N00 www. b]architQcturc.com 14248 rs ti 6i O U-1 0 � od f LLJ LLl LLJ u 0 a DOCUMMT DATA:: 08.15.2020: PEVISIOI'IS: 1% YOUR PPOGRESS SUMIT DATE t' 1 1 , , w a: SHUT rlU/\b[P: mpg