Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONe Manual S Compliance Report Job: Lot21 Phase 3 Waterston... wrightsoft® Date: Dec 29, 2008 Entire House By: sND DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Licerse:CAC032448 AJ Project For: ADAMSHOMES 8316 Amalfi Circle, Fort Pierce, FL 34951 Cooling Equipment Design Conditions design DB: 90.4 °F Sensible gain: 25460 Btuh Outdoor design WB: 77.4 OF Latent gain: 4345 Btuh Indoor design DB: 75.0 OF Total gain: 29805 Btuh Indoor RH: 50% Estimated airflow: 1167 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Carrier Actual airflow: 1167 cfm Sensible capacity: 28431 Btuh Latent capacity: 4937 Btuh Total capacity: 33368 Btuh Design Conditions Outdoor design DB: 38.0 cF Indoor design DB: 70.0 OF Model: 25HBC537AP03+FX4DN F037L00 112% of load 114% of load 112%ofload SHR: 85% Heat loss: 29420 Btuh Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Carrier Model: 25HBC537AP03+FX4DNF037L00 Actual airflow: 1167 cfm Output capacity: 30089 Btuh 1020% of load Supplemental heat required: 0 Btuh Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 1167 cfm Output capacity: 8.0 kW 93% of load Temp. rise: 21 OF Meets all requirements ofACCA Manual S. Entering coil DB: 76.7°F Entering coil WB: 63.4°F Entering coil DB: 69.3°F Capacity balance: 34 OF Economic balance: -99 OF wrightsoft® 2021-Ari-09 15:50:07 �, ate•• • �,�,• Right-Srite®Universal 2021 21.0.02 RSU23828 Am— -A Page 1 erstore2117CRGR�Lot21Pts3Waterstone2117CRGR.rip Calc=MJ8 Horsefaces: N e wrightsoft® Component Constructions Job: Lot 21 Phase 3 Waterston... �" Date: Dec 29, 2008 Entire House By- sND DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Licerse: CAC032448 iLroject intormation For: ADAMS HOMES 8316 Amalfi Circle, Fort Pierce, FL 34951 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl, FL, US Indoor temperature (OF) 70 75 Elevation: 26 ft Design TD (OF) 32 15 Latitude: 28 ON Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (grAb) 5.7 56.9 Dry bulb (OF) 38 90 Infiltration: Daily range (T) - 15 (L ) Method Simplified Wet bulb (OF) - 77 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area tJ-value Insul R Htg HTM Loss Cig HTM Gain (tz BryrWftz'F ftz°FBtuh Bt&ft' Btuh Btuh/ft� Btuh Walls 1613-19ad: Knee wall, asphalt shingles roof mat, r-19 kw ins, 1/2" gypsum n 20 0.049 19.0 1.57 31 2.59 52 board int fnsh a 20 0.049 19.0 1.57 31 2.59 52 s 20 0.049 19.0 1.57 31 2.59 52 w 20 0.049 19.0 1.57 31 2.59 52 all 80 0.049 19.0 1.57 125 2.59 207 Blk wall, stucco ext, r-4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh n 193 0.201 4.1 6.43 1240 4.06 783 e 365 0.201 4.1 6.43 2347 4.06 1482 s 308 0.201 4.1 6.43 1980 4.06 1250 w 305 0.201 4.1 6.43 1961 4.06 1238 all 1171 0.201 4.1 6.43 7529 4.06 4753 Partitions 12C-Osw: Fan wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board int 220 0.091 13.0 2.91 641 1.31 288 fnsh, ZM" wood frm, 16" o.c. stud Windows 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" n 32 0.330 0 10.6 342 8.22 266 thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1.33 ft overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" n 16 0.330 0 10.6 171 8.22 133 thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1.33 It overhang (5.25 ft window ht, 4.5 ft sep.); 6.67 ft head ht 2B-2fv: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" n 5 0.330 0 10.6 53 11.6 58 thk; NFRC rated (SHGC=0.31); 8 ft overhang (1 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2B-2fv: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" n 13 0.330 0 10.6 142 8.22 110 thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 8 ft overhang (6.7 ft window ht, 3 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" e 7 0.330 0 10.6 72 21.9 150 thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 ft overhang (3.17 ft window ht, 0.83 ft sep.); 6.67 ft head ht W 7 0.330 0 10.6 72 21.9 150 all 14 0.330 0 10.6 145 21.9 301 ~ wrightsoft" �� •k• a•• .•� MA �m ,. Rig1t-Sute®Uriversa12021 21.0.02 RSU23828 2021-Jtr-0915:50:07 A erstore2117CRGR�Lot21Pts3Waterstom2117CRGR.np Calc=MJB Hotsefaces: N Page 1 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" a 16 0.33C thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 ft overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht 10C-v: 2 glazing, clr outs air gas, vnl frm mat, dr low-e innr, 1/4" gap, 1/8" s 18 0.55C thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 11.33 ft overhang (6.67 ft window ht, 1 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, insulated vinyl frm mat, clr low-e innr, s 33 0.330 1/4" gap, 1/8"thk; NFRC rated (SHGC=0.23); 1.33 ft overhang (5.3 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, insulated vinyl frm mat, clr low-e innr, s 33 0.330 1/4" gap, 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 11.33 ft overhang (5.3 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, dr low-e innr, 1/4" gap, 1/8" s 16 0.330 thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 ft overhang (5.3 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" s 33 0.330 thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 11.33 ft overhang (5.3 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" w 16 0.330 thk; NFRC rated (SHGC=0.23); 1.33 ft overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht Doors 11 JO: Door, mtl fbrgl type n 20 0.600 Ceilings 16B-30ad:Attic ceiling, asphalt shingles roof mat, r-30 cell ins, 1/2" 2153 0.032 gypsum board int fnsh Floors 22A-tpl: Bg floor, light dry soil, on grade depth 207 0.989 4F wrightsofta % m • -,gym, RigFt-Sute®Uriversal 2021 21.0.02 RSU23828 ACCerstore2117CRGRLot21Phs3Waterstore2117CRGR.np Calc=W8 Hosefaces: N 0 10.6 171 22.4 363 0 17.6 313 12.6 225 0 10.6 345 9.90 324 0 10.6 345 8.52 279 0 10.6 173 8.52 139 0 10.6 345 8.52 279 0 10.6 171 26.3 425 6.3 19.2 389 17.6 356 30.0 1.02 2205 1.69 3638 0 31.6 6551 0 0 20214n.09 15:50,07 Page 2 Project Summary Job: Lot 21 Phase 3 Waterston wrightsof® Date: Dec 29,2008Ent re House By- ... DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 PhDr e:407-333-2665 License: CAC032448 Proiect Information For: ADAMS HOMES 8316 Amalfi Circle, Fort Pierce, FL 34951 Notes: RVSD L.S. 3-16-18 SRP RVSD 6-6-18 SRP L. S. 6-9-21 VWK D' _qn Information Weather: St Lucie Co Inti, FL, US Winter Design Conditions Summer Design Conditions Outside db 38 OF Outside db 90 OF Inside db 70 OF Inside db 75 OF Design TD 32 OF Design TD 15 OF Daily range L Relative humidity 50 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 23423 Btuh Structure 17980 Btuh Ducts 5996 Btuh Ducts 7480 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh none (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 29420 Btuh Use manufacturer's data y Rate/swin multipplier 1.00 Infiltration Equipmenqsensible load 25460 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 2796 Btuh Ducts 1549 Btuh Central vent (0 cfm) 0 Btuh Heatingg coolingg� Area (none) (ft2) 2115 2115 Equipment latent load 4345 Btuh Volume (ft3) 17427 17427 Air changes/hour 0.32 0.16 Equipment Total Load (Sen+Lat) 29805 Btuh Equiv. AVF (cfm) 93 46 Req. total capacity at 0.75 SHR 2.8 ton Heating Equipment Summary Cooling Equipment Summary Make Carrier Make Carrier Trade CARRIER Trade CARRIER Model 25HBC537AP03 Cond 25HBC537AP03 AHRI ref 204837926 Coil FX4DNF0371-00 AHRI ref 204837926 Efficiency 8.5 HSPF Efficiency 12.5 EER, 15.5 SEER Heating Input Sensible cooling 26250 Btuh Heating output 34600 Btuh @ 47OF Latent cooling 8750 Btuh Temperature rise 27 OF Total cooling 35000 Btuh Actual airflow 1167 cfm Actual airflow 1167 cfm Airflowfactor 0.040 cfm/Btuh Air flow factor 0.046 &nBtuh Static pressure 0.30 in H2O Static pressure 0.30 in H2O Space thermostat Load sensible heat ratio 0.85 Capacity balance point = 34 OF IInu =p8 kW, Output = 27347 Btuh,100 AFUE Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -r- wrightsoft- 2021-Joi-0915:50:07 Right-Sute®Uriversal 2021 21.0.02 RSU23828 Page 1 erstore2117CRGR�Lor21PIs3Waterstom2117CRGR.rnp Calc=MJ8 Hosefaces: N -�- wrightsofC Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Pfone:407-333-2665 Licerse: CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name Entire House BR 2 2 3 Exposed wall Room height 207.0 ft 82 ft d 27D It 8.0 If heaticool 4 5 Room dimensions Room area 2115.5 ft2 15.0 x 12D ft 180D ft2 Ty Construction number U-value (BtuMIL- j Or HTM (Btuh/ft2) Area (ft2) or perimeter (ft) Load (Btuh) Area (ft2) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 W _... V)J W _16&19ad__.w Blk well, stucco ext 2A-2ov 2A-2ov 2B-2fv 2B-2fv tiJO _ Blk vell, stucco ext 2A-2ov 2A-2ov 16B 19ad _ Blk well, stucco ext 0.201 0.330 0.330 0.330 0.330 _0600 0.201 0.330 _... 0.330 0049 0.201 n n n n n n a a a r.s._ s 6.43 1056 1056 1056 1056 1920 6.43 1056 10.56 6.43 4.06 822 822 11.58 822 _- 1758 4.06 21.92 22.43 4.06 280 32 16 5 13 20 388 7 16 440 193 0 0 0 0 20 365 1 _._ — _ _ _ 1 308 1240 342 171 53 142 389 2347 72 - 171 1980 783 266 133 58 110 356 1482 150 363 1250 0- 0 0 0 0 _ �0 96 0 . _ _ _0 —3 120 0 0 0 0 0 _0 0 96 0 _ _ _0 ..104._ - - .._0 0 0 0 0 0 0 _._._,Q 617 0 _ __.. _ 0 Q 667 0 0 0 0 0 _-__- �_Q .___,_.__0 390 0 ... ,0. 421 1OC-v 2A-2ov 0550 0230 s s 17.60 10.56 12.64 9.90 18 33 18 33 313 345 225 324 0 0 0 0 0 0 0 0 X.-_,. Vl/ I�—GG C_,. 2A-2ov 2A-2ov 2A-2ov ?6619ad_` __.__ : Blk vdl, stucco ext 2A 2ov 2A2ov 12COsw 18B-30ad _ 0,330 0.330 0.330 _ __.__Q049 0.201 0.330 0.330 ____ Q091, _0.032 s s s rw,_ w w w_ -;-----291. v_ 1056 1056 1056 1.57; 6.43 1056 1056_ , - 1.02 -31,65 852 852 852 259 4.06 2627 2192 -___131, 1.69 - _0.00 33 16 33 _. _ 20 328 16 w.._._.7 __220.___,220__ 2153 _ _2116 33 16 33 _.20 305 1 1 345 173 345 4..-._ 31 1961 171 —_ 72 279 139 279 _. ---. 52 1238 425 150_— 3638 _ 0 0 16 0 0 0 0 -180 _'_180 0 16 0 0 0 _ 0 _ :0 , __ _„180 _ :m27 0 173 0 0 0 0 �. __0__�__4_Q _ 184 _ _-,_ 854 0 139 0 0 0 0 . , ,2153 .'-- 207 _ y641_,-,--288-------�Q _— 2.205 4-_,__6551, ,�._ 304 ----_,Q 6 c) AED excursion 0 -35 Envelope loss/gain 20155 12144 2496 1220 12 a) Infiltration 3268 786 466 112 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 5 1150 0 0 Applianceslother 3900 300 Subtotal (lines 6to 13) 23423 17980 2961 1632 Less extemal load 0 0 0 0 14 Less transfer Redistribution Subtotal 0 0 23423 0 0 17980 0 0 2961 0 0 1632 15 Duct loads 126%1 420/6 5996 7480 26 % 42%1 758 679 Total room load Air required (cfm) 29420 1167 25460 1167 3719 148 2310 106 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -- -➢'rj- wwvao t:soft- 2021 -Jun-09 15:50,07 �P. "' "'"- Rigli-Sdte®Unversal 2021 21.0.02 RSU23828 Page 1 erstore2117CRGR\Lot21Pts3Waterstone2117CRGR.nQ Calc=MJ8 Horsefaces: N - - wrightsoft° Right-M Worksheet Entire House DEL -AIR HEATING AND AIR 531 CODISCO WAY, SANFORD, FL 32771 Phone: OND3TIONINGrre. CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name BATH 3 BR 3 2 3 4 5 Exposed wall Room height Room dimensions Room area 5.0 ft 8.0 ft heat/cool 9.0 x 5.0 ft 45.0 ftz 13.0 It 8.0 ft heaU000l 1.0 x 151.0 ft 151.0 ftz Ty Construction number U-value (Btuh -fl Or HTM (Btuh/ftz) Area (ftz) or perimeter (ft) Load (Btuh) Area (ft2) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 W___.. W. __:.16B W C ..- F -= 16&19ad ;�ry �4�' BIk wall, stucco ext 2A-2ov 2A-2ov 2B-2fv 28-2fv 11,10_ _._. BIk Hell, stucco e)d 2A 2ov 2A2ov .. 19ad_� BIk wall, stucco ext 10C-v 2A-2ov 2A-2ov 2A-2ov 2A 2ov __ 16B19ad_.__---__1--'__-_-._0049_w_ BIk Hall, stuccoed 2A-2ov 2A2ov ._ 12C Osw _..____:.__- 16B-30ad- a 2211I - - _..�_._0049 0.201 0.330 0330 0330 0.330 0600 0Q, 9 0201 0.330 0330 _0049 0.201 0550 0330 0230 0.330 0330 - - 0.201 0.330 , 0330 _ 0091 0032 _ _ _0969 __0-.- n n n n n - n� ^e; a a e_. -s . s s s s s s -7-- - w w w_ __-= _-- ._.c . d1.57: 6.43 10.56 1056 1056 1056 1920 1.51 6.43 1056 1056 _:_1.57.:- 6.43 17.60 1056 1056 1056 1056 -1 1,5Z. 6.43 1056 1056 --_ 2.91- 1:02 _. 31.6.5 � _`2.59 4.06 822 822 11.58 822 y_w 1758 ' 4.06 21.92 22.43 -259._ 4.06 12.64 9.90 852 852 852 . ___, _259. 4.06 2627 21.92 __.131; _._ 1.69 0.00:. ____�__ 0 0 0 0 0 0 40 0 0 -.. �' 0 0 0 0 0 0 _ 0.__v__0.-_ - 0 0 ,4 __. _, '_0 __,-„ 45 ---45 .___-___.0______�--0 0 0 0 0 0 ----_____6 40 0 -- -0' 0 0 0 0 0 _ 0 0 0 __- 0 --.'--_ .,9 45 -_--- ___0 0 0 0 0 0 _Q 162 0 0 0 0 0 0 0 0 __..__.00 0 0 -- 0 ___ 0 - _ 76 _w._____ 0 0 0 0 0 0 _0 104 0 - -� 0 0 0 0 0 0 0 0 _ 0 _. __ �__0 ,•151 151 �_ ��0 0 0 0 0 0 88 0 --- - 0 0 0 0 0 0 0 0 0 0 4 _...___. 0 151 . - .. 13 _--_--•-6 0 0 0 0 0 565 0 ._.._._0 0 0 0 0 0 0 �_...0, 0 0 _ ----- _-_0,. 155 411 ---._^_0. 0 0 0 0 0 357 0 ... __0. 0 0 0 0 0 0 _ _-__. 0 0 0 255 - 0 0 0 0 0 0 _ ----, Q 257 0 ._.._•. 0,._..._ 0 0 0 0 0 0 _..., Q 0 0 --- 0 ____0 46 6 c) AED excursion -5 84 Envelopelossgain 462 233 1302 1059 12 a) Infiltration b) Room ventilation 86 0 21 0 224 0 54 0 13 Internal gains: Occupants@ 230 Appliances/other 0 0 0 0 0 300 Subtotal (I i nes 6 to 13) 548 254 1526 1413 14 15 Less external load Less transfer Redistribution Subtotal Duct loads 26% 42% 0 0 0 548 140 0 0 0 254 106 26% 429/6 0 0 0 1526 391 0 0 0 1413 588 Total room load Air required (cfm) 688 27 359 16 1917 76 2001 92 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -r�&- wrightsoft.^ A Right-Suite®Unversal 2021 21.0.02 RSU23828 2021-Jun091 Page 2 erstore2117CRGRLot21Pfs3Waterstone2117CRGR.rtp Calc=MJ8 House faces: N 9 -�- wrightsoft9 Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531CODISCOWAY, SANFORD,FL32771Phone:407-333-2665 Licerse:CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name BATH 2 BR 4 2 3 4 5 E>posed `mall Room height Room dimensions Room area 10.0 it 8.0 ft heat/cool 6.0 x 10.0 it 60.0 112 20.0 It 8.0 it heat/000l 11.0 x 14.0 it 154.0 ftz Ty Construction number U-value (BtuhRtz--q Or HTM (BtuM2) Area (ftz) or perimeter (ft) Load (Btuh) Area (ftz) or perimeter (ft) Load (Stuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 W .��-.. .__..- W .:... _ V+/ W--259 Vl! C 16&19ad:. _�� Blk v dl, stucco ext 2A-2ov 2A-2ov 2B-2fv 2B-2fv 11,10 __.. _ 16 _19ad_; : BIk wall, stucco e>d 2A 2ov 2A 2ovy_ _ BIk v%dI, stucoo ext 1OC-v 2A-2ov 2A-2ov 2A-2ov 2A 2ov .16B19ad __----,- BIk vied, stucco eM 2A 2ov 2A 2ov _,. .._. w-- -12C Osw__:_..- . 1613-30ad _ _-.__, _ _ ,-- .._..__0049 0201 0330 0230 0.330 0330 _0600 _ ._-0049 0.201 0.330 _ 0330 0.201 0550 0.330 0.330 0330 0230 ---.-0.049 0.201 0330 . _ 0,330 ---. 0.091 0.032 _ __ ___0989 ._n n n n n n n_. = e a a e _ s s s s s s _ w� w w w. --- 1,57 6.43 10.56 1056 1056 10.56 _.. 1920 ,157, 6.43 1056 1056 6.43 17.60 1056 1056 1056 10.56 _t57; 6.43 1056 10.56 _ ._ _291 1.02 31.65 -_ -_-�259 4.06 822 822 11.58 822 _-._1758 2.59 4.0G 21.92 2243 4.06 12.64 920 852 8.52 852 _ 259 4.06 2627 21.92 131 169 _ 0.00 -_ _ _. :-00 0 0 0 0 0 0 _ __0 80 7 _ 0 _ _._0 0 0 0 0 0 0 _0 0 0 ____0 - 0 -60 -_ _ .-- 60 ___ , ___ _ 0 0 0 0 0 .__ .__0 _._ 73 1 0 ___.__ I-O 0 0 0 0 0 0 -__0 0 0 . 0 _. _ 0 60 ----. _µ10 __ 0_��__._ 0 0 0 0 0 _.. ____0 470 72 0 ---..._-0 0 0 0 0 0 0 _____0_---_. 0 0 .0 ---._ _ Q _ 61 _316 , 0.___ 0 0 0 0 0 0 _ -_- 9._.__�_. 88 0 16 0 0 .._ _._0 0 0 _ 0 __ .__._0 0 0 0 0 0 0 --- - 0 n 0 0 0 154 _, _154 72 0 0 0 0 _.______-._0 0 0 _ .. -0 __.------ _0 0 0 0 0 0 0 72 0 0 - 154 ,____ 20 462 0 171 0 0 _..._._ 0 0 0 0 _Q .. 0 0 0 0 0 0 0 463 0 .. __.,. _0. .- 158 _. _ 633. 292 0 133 0 0 _ 0 0 0 - . _ _--- 0 0 0 0 0 0 0 292 0 _.__. _.._0. 260 ______0 _4__.. _.__ 297 150 _-- -----0 _ _.�_ _0 0 0 0 0 0 0 -0 0 0 0 0 _ 101 _ �. _0 6 c) AED excursion 29 _28 Envelope losstgain 921 578 1887 949 12 a) Infiltration b) Room ventilation 172 0 42 0 345 0 83 0 13 Internal gains: Occupants@ 230 Appliances>other 0 0 0 0 0 300 Subtotal (lines 6to 13) 1093 620 2232 1332 14 15 Less e>dernalload Less transfer Redistribution Subtotal Duct loads 26 % 42 % 0 0 0 1093 280 0 0 0 620 258 26 % 429/ 0 0 0 2232 571 0 0 0 1332 554 Total room load Air required (cfm) 1373 54 877 40 2803 111 1886 86 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. w�a9ti,o,rt- A Right-Sute®Uriversal 2021 21.0.02 RSU23828 2021 JuF09 1 Page 3 erstone2117CRGR�Lot21Pts3Waterstor>e2117CRGR.np Calc=WB Housefaces: N g -�- wrigntsoft, Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR - CONDITIONING 531CODISCOWAY,,SANFORD,FL32771Phone: 407-333-2665 Licerse:CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By- SND 1 Room name GREAT RM Krr/BRKFST 2 Exposed wall 22.0 ft 11.0 ft 3 Room height 85 ft heaV000l 9.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 586.0 It 586.0 ft2 11.0 x 20.0 ft 220.0 ft2 Ty Construction number U-value (Btuh/ft2-19 Or HTM (Btuh/ft2) Area (ft') or perimeter (ft) Load (Btuh) Area . (ftz) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 .W __. _ 16 &19ad __ ___ _ Blk vtdl, stucco ext 2A-2ov - _ _ 0 0_49 0201 0330 ._n. n n 1 a7 1-7 6.43 1056 .-,_;_259 4.06 822 20 56 0 _ 20 17 0 ___. _.3 112 0 --- r 52 70 0 0 0 0 0 0 0 0 0 11 2A-2ov 2&2f( 0330 0230 n n 1056 1056 822 11.58 0 5 0 0 0 53 0 58 0 0 0 0 0 0 0 0 _--D W- - 2B-2N _11 JO __ 16B(9ad 0.330 _ 049. 0 600 0 n n _e... 1056 192_0 157 822 1758 ._.?59 13 _20 �__20 0 _ __20 142 __..w 389 31:, 110 _ 356 0 0 0.. 0 .._ 0 0 _ _ _ 0 0 _..__. _.4. V)1 Blk %dl, stucco ext 2A-2ov 0.201 0.330 a a 6.43 1056 4.06 21.92 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 2A 2ov_._ _.... 16B 19.ad� Blk wall, stucco ext 0.330 _0,049 0201 ._ e _ . s_.. s 10,56 _ _ 157 6.43 .„_22.43 -. _ _259 4.06 _ ..... _. __0 -._:20 120 ..._ . __0 ... _ 20_.._0 70 ._... 0 447 _ Q 282 . _.. -. 88 -- .. 0 ------ _ -- _0 55 ------ _._0 _ _.. _•__ Q 356 _ _ __.. _0 ---- --- ,9. 225 10C-v 2A-2ov 0550 0330 s s 17.60 1056 12.64 9.90 18 0 18 0 313 0 225 0 0 0 0 0 0 0 0 0 2A-2ov 2A-2ov 2A-2ov 0.330 0330 0.330 s s s 1056 1056 10.56 8.52 852 852 0 0 33 0 0 33 0 0 345 0 0 279 33 0 0 33 0 0 345 0 0 279 0 0 yl Blk v,dl, stucco ex[ 2A 2ov 0201 0.330 w w 6.43 1056 2.59 4.06 2627 20 0 0 _.:20 0 0 -- _ 31 0 0 . _ 52.,____,_-.,_0 0 0 0 0 0 0 0 0 r 0 0 I��G 2A 2ov _ 0 330 -_0091 w -. 10.56 _2.91„ 21.92 _ _ .;131 0 _ _ 0 _ 0 _ _ _ 0 .__ _w. 0 _ - 0 - --- _ 0 0 C 16B-30ad -_,---- -__---- 0032 _. _ 1.02.__1.69 91,65 _6 �. ;00 608 608 --•__622 1027 _._. 236 _. 236 242 _ 399 6 c) AED excursion -84 .44 Envelopeloss/gain 3244 2531 1291 858 12 a) Infiltration 552 133 190 46 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 3 690 0 0 Applianoes/other 600 1200 Subtotal (lines 6 to 13) 3796 3954 1481 2103 Less external load 0 0 0 0 Lesstransfer 0 0 0 0 14 Redistribution Subtotal 0 3796 0 3954 0 1481 0 2103 15 Dud loads 26 % 42 % 972 1645 26 % 42 % 379 875 Total room load 4768 5598 1860 2978 Air required (cfm) 189 257 74 137 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. i , -,4- 2021-Jun-0915:50:07 J4E�?-FwA Right-Suite®Unlversal 2021 21.0.02 RSU23828 Page 4 erstore2117CRGR\Lot21Pfs3Waterstom2117CRGR.np Calc=MJB Housefaces: N - + wrightsoft Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCOWAY,,SANFORD,FL32771 Phone:407-333-2665 Lioerse:CAC03244B Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name DIN UTIL 2 Exposed wall 21.0 It 6.0 It 3 Room height 8.0 ft heat/000l 8.0 It heat/cool 4 5 Room dimensions Room area 11.0 x 165 It 181.5 ft2 6.0 x 9.0 It 54.0 112 Ty Construction U-value Or HTM Area (ftz) Load Area (ftz) Load number (BtuhHt-co (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 V�J I�GG Blk wall, stucco ext 2A-2ov 2A-2ov 213-2fv 213-2fv 11J0 _ Blk v�ell, stucco eM 2A-2ov 2A2o_v__.._. __. Blk well, stucco ext u�0049 0201 0.330 0.330 0.330 0.330 r .__0600 0.201 0.330 _---0-330 0049 0.201 n_ n n n n n n a a e_. s ,_157 6.43 1056 1056 1056 1056 1920 6.43 1056 _. .10,56 6.43 ._ 259. 4.06 822 822 11.58 822 1758 4.06 21.92 22.43 2590 4.06 . _ -0 88 32 0 0 0 0 20 0 0 0 ., ____0 56 0 0 0 0 0 20 0 0 358 342 0 0 0 ..v__.0. 129 0 _ .._. .0 _ _-- 0._ 0 226 266 0 0 0 .._ 0 81 0 0 . _._ _0._-..�._ 0 0 0 0 0 0 0 0 0 _ .-...0 0 0 0 0 0 0 0 0 0 0 0 0 ---_-_:_0 0 0 0 0 0 0 .__ _ 0 0 0 �..__ 0 _._ ___... 0 0 0 0 0 0 0 __-----�0 0 0 _. __...0 ..---•°_-_ 0 0 W_� V)! L�___GG F- C_ _ F 10C-v 2A-2ov 2A-2ov 2A-2ov 2A-2ov Blk well, stucco eM 2A 2ov 2A 2ov _. _- _ 'j2COsw60 166-30ad_- _-_-_µ„ 0550 0.330 0.330 0.330 ; _ 0.330 0.049 0.201 0230 0.330 -__-,.__0032 Q989 s s s s s __w_ w w w _ -_Y_. 17.60 1056 1056 1056 10.56 6.43 1056 10.56 1.02 12.64 9.90 852 852 852 __ 259. 4.06 2627 21.92 1.69 0.00 0 0 0 0 0 _ _,_. 0 0 0 0 182 _ .. 0 0 0 0 0 _. - __.,., = 0 0 0 0 . 182 0 0 0 0 0 __ _ _ _0 0 0 _ 0 _ 186 0 0 0 0 . .. . _0 0 0 0 307 0 0 0 0 ..._ .._ _. 0 0 0 _ _ 0 54 0 0 0 0 0 __.. _ __. 0 0 -__ 0 54 0 0 0 0 0 _ _..... 0 0 _.w. _ 0 55 0 0 0 0 __.._ 0 0 0 _. W _- 0 _-_ 91 6 c) AED excursion -26 -16 Envelope loss/gain 1853 933 385 139 12 a) Infiltration b) Room ventilation 233 0 56 0 0 0 0 0 13 Internal gains: Occupants@ 230 1 230 0 0 Appliances/other 0 600 Subtotal (lines6 to 13) 2086 1219 385 739 Less eMernalload 0 0 0 0 14 Less transfer Redistribution Subtotal 0 0 2086 0 0 1219 0 0 385 0 0 739 15 Duct loads 26% 42 % 534 507 26 % 42 % 99 307 Total room load Air required (cfm) 2620 104 1726 79 _T 484 19 1046 48 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. - wr➢g➢�tsoft- 2021-Jun-0915:50,07 .�P. ..I' -' ""^ Riglt-Suite®Uriversal 2021 21.0.02 RSU23828 Page 5 erstore2117CRGRLo@1Pts3Waterstore2117CRGR.rup Calc=MJ8 Housefaces: N - 1- wrightsoft, Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, F_ 32771 Pho , 407-333-2665 License: CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name M BR M BATH 2 Exposed wall 31.0 It 29.0 It 3 Room height 8.0 ft heaVcool 8.0 ft heat/cool 4 5 Room dimensions Room area 14.0 x 17.0 ft 238.0 ftz 1.0 x 160.0 ft 160.0 ftz Ty Construction U-value Or HTM Area (ft2) Load Area (ftz) Load number (Btuhfftz-`F1 (BtuhRtz) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 _W_ .J6619ad __' Blk Hell, stu000 eM 2A-2ov _ _. 0049 0201 0230 �ri ; n n - 157 6.43 1056 _._259 4.06 822 _: ,..�_ 0 0 0 .. .. -0 0 0 -- • 0 0 0 __:_ ,_0 0 0 _�- U 0 0 --_ �_0 0 0 _'__'-0. 0 0 __ __ ._0. 0 0 11 2A-2ov 2B-2fv 0230 0.330 n n 1056 1056 822 11.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 __.- _ 1N =_ 2B-2N 11J0 _ _. _ 0.330 �_.._0.600 n _n_ 1056 ..__1920. 822 _-_ 1 B8 _ -_ 2.59 0 0 .__ _._._� 0 4 0 _ 0 0 ..._.__ 0 0 0 0 0 V)/ �L- Blk %dl, stucco ext 2A-2ov 0.201 0.330 a a 6.43 1056 4.06 2122 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wy. 2A-2ov_ . __.._ _._...__. y6B 19ad - _:. Bilk MI, stucco e)d 0230 _._'__ 0.049 0.201 ..e __s_.: s _ 1056 .._`_i'57 6.43 .__22.43 _ _,_259 4.06 .. _ 0 .._ :�_.0 112 ._. _._. 9 - .___.. 0 79 __.._ _ __0 _�_.__ _0 510 _. _ _ 0 _. _-__9 322 .... 4 0 ------0 0 _._._ _0 -------0 0 --.. _.._ 0 0 0 . _ 0 - _0 0 10C-v 2A-2ov 0550 0.330 s s 17.60 1056 12.64 9.90 0 33 0 33 0 345 0 324 0 0 0 0 0 0 0 0 V)/ 2A-2ov 2A-2ov 2A-2ov Blk v%di, stu000 ext 2A 2ov 0.330 0.330 0.330 0.201 0230 s s s .w. w w 1056 1056 1056 .____15Z; 6.43 1056 852 852 852 _259 4.06 2627 0 0 0 _. _._ _ 0 136 16 0 0 0 .._ . _ _ 0 120 1 0 0 0 _...._ _,A 771 171 0 0 0 _. _,...0 486 425 0 0 0 ._ 0 1220 0 0 0 0 0 113 0 0 0 0 _ ._ w._._0 728 0 0 0 0 _ _. 0 459 0 I��G P __- 2A2ov __._. ___ 12C Osw_.__ _' _.- _ _ 0230 0091 _w , __ _ .. 1056 __. 2,91 21.92 _ _ 1.31 0 ,_d, _ 0 0 _ . __ _0 0 0 _._V _-- _._0 _ 7 - . 112 . 1 - _._ J12 72 326 150 147 _-_:0 C_ _ _... F, .__ 16B-30ad.. _ , ._ - . _AWL_" .... . 0.032 . _.,0989 ... _ .. 1 02. _._31.65..1.60. ._ . 1.69 . . 238 . __. 238 _ _ _ _244 _ _-_ 402 ..__. -160 .. _.._._ 160 ......29 164 �. 918 270 --•---_ -0. 6 c) AED excursion 62 74 Envelope loss/gain 3022 2022 2208 1101 12 a) Infiltration 535 129 259 62 b) Room ventilafion 0 0 0 0 13 Internal gains: Occupants[ 1a 230 1 230 0 0 Appliancesdother 600 0 Subtotal (lines 6to 13) 3556 2980 2467 1163 Less external load 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 3556 2980 2467 1163 151 Duct loads 126 % 42%1 910 1240 269/6 42°/ 631 484 Total room load 4467 4220 30,98 1647 Afrrequired (chi) 1771 193 1231 75 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -rk- 2021-Jtu-0915:50:07 .45�5A Rtght-Sulte®Uriversal 2021 21.0.02 RSU23828 Page 6 erstone2117CRGR�Lot21Pfs3Waterstone2117CRGR.rnp Calc=MJ8 Housefaces: N -�- wrightsoit' Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phcne:407-333-2665 License: CAC032448 Job: Lot 21 Phase 3 Waterston 21... Date: Dec 29, 2008 By: SND 1 Room name B4 WIC M WIC 2 3 EVosed wall Room height 12.0 It 8.0 ft heat/cool 0 ft 8.0 ft heat/cool 4 5 Room dimensions Room area 6.0 x 6.0 It 36.0 112 1.0 x 50.0 ft 50.0 ft2 Ty Construction number U-value (BtuM-'F) Or HTM (Btuh/ftz) Area (fts) or perimeter (ft) Load (Btuh) Area (ftz) or perimeter (it) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/PS Heat Cool 6 11 W i_ _ V)! _ W.__._ r_. V�J I�-GG C . 16619ad__..__ Blk wall, stucco ext 2A-20v 2A-2ov 213-2fv 26-2fv 11,10 168µ19ad __..___- Blk wall, stucco e)d 2A 2ov 2A 2ov__ _ 16B�1,9ad.--__.__ Blk viall, stucco e)d 1OC-v 2A-2ov 2A-2ov 2A-2ov 2A-2ov Blk v�all, stucco ext 2A-2ov 2A2ov ._. .__291;_.___0 16B 30ad _ _..__ . _._ 0.201 0330 0.330 0330 0330 - 0600 .__.-_ 0049-°;e_ 0.201 0330 0230_ _ 0049 0.201 0550 0230 0.330 0230 0330 0.201 0330 y0330 0032 n n n n n _ n_ a a e _ _s_ s s s s s s w w w_ _--.• 6.43 1056 1056 1056 1056 1920 157 6.43 10.56 1056 _..__.157 6.43 17.60 10.56 10S6 1056 1056 T57 6.43 10.56 1056. 1.02 --- ,31.65 4.06 822 822 11.58 822 _ _1756 4.06 21.92 22.43 _._259 4.06 12.64 9.90 852 852 852 _a 259 4.06 2627 21.92 1.69 48 0 0 0 0 0 48 0 0 0. 0 0 0 0 0 0 _ ;_-- _0 0 0 0 36 36 48 0 0 0 0 0 309 0 0 0 0 _..._-0 309 0 0 ._ 0 0 0 0 0 0 0 0 . 0 37 195 0 0 0 0 _._ _ 0 195 0 0 0 0 0 0 0 0 0 0 .0 .-_- -- 61 0 0 0 0 0 _ 0 0 0 0 _.. 0 0 0 0 0 0 0 0 0 , _0 _ 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ _..__0. 50 _ 0 0 0 0 0 __.. ... 5. 0 0 _ .__0 0 0 0 0 0 0 __0 0 0 _ 0 51 0 0 0 0 0 _.. _. 0 0 0 0. 0 0 0 0 0 0 0 0 _._0 84 _.._ ._. _._ 48 0 _ 0 . ___0 0 0 0 0 0 0 ..w�0 0 0 0._ _ _ . _36 6 c) AED exaarsion _10 -2 Envelopeloss/gain 1034 440 51 83 12 a) Infiltration b) Room ventilation 207 0 50 0 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Applianees/other 0 0 Subtotal (lines 6 to 13) 1241 490 51 83 Less external load 0 0 0 0 14 Less transfer Redistribution Subtotal 0 0 1241 0 0 490 0 0 51 0 0 83 15 Duct loads 26 % 42% 318 204 260/6 42% 13 34 Total room load Air required (cfm) 1559 62 694 32 64 3 117 5 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. A - 2021-Jurv09 15:50:07 Right-Suite®Uriversal 2021 21.0.02 RSU23828 Page 7 erstore2117CRGF?Lot21PFs3Waterstore2117CRGR.nQ Calc=MJ8 Hoisefaces: N Duct System Summary Job: Lot Phase 3 Waterston... wrightsoft® Date: Dec 29, 2008 Entire House By: sND DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCOWAY,,SANFORD,FL32771 Phone:407-333-2665 Ucerse:CAC032448 Project• • For: ADAMS HOMES 8316 Amalfi Circle, Fort Pierce, FL 34951 External static pressure Pressurelosses Available static pressure Supply / return available pressure Lowest friction rate Actual airflow Total effective length (TEL) Heating 0.30 in H2O 0.06 in H2O 0.24 in H2O 0.120 / 0.120 in H2O 0.171 in/100ft 1167 cfm 140 ft Supply Branch Detail Table Cooling 0.30 in H2O 0.06 in H2O 0.24 in H2O 0.120 / 0.120 in H2O 0.171 in/100ft 1167 cfm Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Mat Actual Ln (ft) Ftg.Egv Ln (ft) Trunk B4 WIc h 1559 62 '32 0.211 5.0 Ox 0 VIFx 28.9 85.0 sti BATH h 1373 54 40 0.220 5.0 Ox0 VIFx 24.2 85.0 sti BATH 3 h 688 27 16 0.315 4.0 Ox 0 VI Fx 6.2 70.0 BR 2 h 3719 148 106 0.312 7.0 Ox 0 VI Fx 6.9 70.0 BR 3 c 2001 76 92 0.291 6.0 Ox 0 VI Fx 12.4 70.0 BR4 h 2803 111 86 0.221 6.0 Ox 0 VIFx 23.7 85.0 sti DIN h 2620 104 79 0.206 7.0 Ox 0 VIFx 31.5 85.0 st2 GREATRM c 5598 189 257 0.306 9.0 Ox0 VIFx 8.4 70.0 Krr/BRKFST c 2978 74 137 0.205 8.0 Ox 0 VIFx 32.2 85.0 st2 M BATH h 3098 123 75 0.171 6.0 Ox 0 VI Fx 40.1 100.0 st3 M BR c 4220 177 193 0.174 8.0 Ox 0 VIFx 37.6 100.0 SO Mwlc c 117 3 5 0.177 4.0 Ox0 VIFx 35.3 100.0 SO unL c 1046 19 48 0.215 4.0 Ox 0 VI Fx 26.6 85.0 st2 Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (crm) (cfm) FIR (fpm) (in) (in) Material Trunk sti PeakAVF 227 158 0.211 417 10.0 0 x 0 VinlFlx SO PeakAVF 303 274 0.171 555 10.0 0 x 0 VinlFlx st2 st2 PeakAVF 500 538 0.171 503 14.0 0 x 0 VinlFlx -r- wrightsoft ��..•�m.ni,nH<w..„�N•, Right-Stite®Uriversa1202121.0.02RSU23828 erstore2117CRGRxLot21Pfs3Waterstore2117CRGR.rrp Calc=MJB Hoisefaces: N 2021-Jrur-0915:50:08 Page 1 Return Branch Detail Table Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Mat Trunk rb1 Ox 0 1167 1167 0 0 0 0 Ox 0 VIFx .- -*- wrightsoft® ��•.-��•.�,.•�•A..•,�mam Right-SuteSUriversa12021 21.0.02 RSU23828 erstore2117CRGRLot21Phs3Waterstone2117CRGR.np CaIc=W8 Hoisefaces: N 2021-Jur0915:5008 Page 2 2020 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Lot 21 Phase 3 Waterstone 2117 CRGR Builder Name: ADAMS HOMES Street: 8316 Amalfi Circle Permit Office: City, State, Zip: Fort Pierce , FL , 34951 Permit Number: Y Owner: Jurisdiction: 661000 w Design Location: FL, ST_LUCIE_CO_INTL U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in an dropped Y aped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace wall . Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be airtight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sp 0 nkler cover plates and walls or nPelongs- a. ui aauuwn, nispecuun of iog waus snau be in accordance with the provisions of!CC-400. 6/9/2021 4:02 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1