Loading...
HomeMy WebLinkAboutTRUSS DRAWING1251 1t5 I Lane, Suite 200 Maitland, Florida 32751 rF D P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com i!rWebsite: www.fdseng.com ENGINEERING ASSOCIATES August 24, 2021 Building Department Ref: Adams Homes Lot: Lot 21 Ph. 3 Subdivision: Fort Pierce - Waterstone Address: 8316 Amalfi Cir. Model: 2117 CR RHG KA # 21-12006 Truss Company: Builders First Source Date of drawings: 8/19/21 Job No.: 2819524 Wind Speed: 160 Exposure: C Truss Engineer: Joaquin Velez To whom it may concern, We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. Contractor or sub -contractor is responsible for matching all structural components and details shown in the construction documents. Contractor or sub -contractor is also responsible for confirming all quantities and dimensions; selecting appropriate fabrication processes and techniques; and coordinating work with all other trades. l I q q i 13 t s Note: Truss ID's may vary. If you have any questions, please do not hesitate to call Sincerely, 8/24/2021 Carl A. Brown, P.E. FL. # 56126 8/24/202 O � e ' 'T � • No 4PE78750 •' �' M N • x ��•• STATE OF \` 1 8/24/2021 �lsts3sl Scott Lewkowski, P.E. FL. #78750 FDS Engineering Associates, A TSG Company "Your Building Code Experts" Luis Pablo Torres, P.E. FL. # 87864 C C C C t t r C A nf) f1n �1 1� ■'.---ram: .1 ■�'� �' • -:: -.,--:c.�'�-----�="6= .�� � ■1 �� Ali �Ti17 1' 11 ,)n nn nn ❑f Reviewed and Approved ❑ Revise and Resubmit ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner FDS ENGINEERING ASSOCIATES Date:08/26/2021 By -A Submittal No.: Project No.: 21-12006 Project Eng.: Scott Lewkowski Project Name: Adams Homes - Fort Pierce - Waterston - Lot 21 Ph3 CONNECTORS SCHEDULE ROOF TRUSS Q ID MODEL ROOF UPLIFT SYM 0 1 A-11 LUS24 / JUS24 1 895 / 836 4901510 11A' 8 A HTU261THD26 3600 / 3470 1555 / 2330 ILA 0 B HTU28 / THD28 4680 / 5040 2140 / 2330 LLB 1 C HTU26-2 / THD26-2 3600 / 3355 2175 / 2340 1 m 0 D HTU28-2 / THD28-2 4680 / 5005 3485 / 2595 1 1 w 0 E HGUS26-2 / THDH26-2 5320 / 5245 2155 / 2340 J IF 0 F HGUS28-2 / THDH28-2 7460 / 8025 3235 / 3330 1IF 0 G HGUS26-3 / THOH263 5230 / 5246 2155 / 2340 1 tc 0 H HGUS28-3 / THDH28-3 7460 / 7836 3235 / 4370 J w 0 J THJA26 / HJC26 9100 / 8990 4095 / 4370 1 w 3X8NOP VERIFY ALL DIMENSIONSAND CEILING CONDITIONS PRIOR TO APPROVAL SONS CEILING FRAUNG REOUIREDIN FIELD BY eUIDER MAINWIND FORCE RESISTING SYSTEMICL HYBRID WIND ASCE7-10 ENCLOSED IMPORTANT EXPOSURE CATEGORY C OCCUPANCY CATEGORY B This Drawing Must Be Approved And IN) LOAD 160 MPH VAND IMPORTANCE FACTOR 1.00 Returned Before Fabrication Will TRUSSES HAVE BEEN DESIGNED FOR A 1G0 PSF BOTTOM CHORD LIVE LOAD Begin. For Your Protection Check All NONCONCURRENT Wml ANY OTHER LIVE LOADS Dimensions And Conditions Prior To Approval Of Plan. SIGNATURE BELOW INDICATES ALL ROOF LOADING FLOOR LOADING NOTES AND DIMENSIONS HAVE TCLL: 20 PSF TCLL• 40 PSF BEEN ACCEPTED. TCDL: 07 PSF TCDL• 10 PSF BCDL: 10 PSF BCDL: 6 PSF By Date TOTAL: 37 PSF TOTAL: 66 PSF DURATION: 1.25 DURATION: 1.00 CAUTIONM DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE- ENGINEERING -DRAWINGS -AND BSCI-B1 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (ie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE. 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS. The General Contractor Is Responsible For All Connections other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Coiling And Roof Diaphragm Connections. ROOF PITCH: 6112 CEILING PITCH: 3/12 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE: 2 X 4 OVERHANG LENGTH: 16" END CUT: Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE fBC2020 BEARING HEIGHT SCHEDULE BUILDER: Adams Homes PRoJECT: Single Family MODEL. LANAI ADDRESS: 8316 AMALFI CIR LOT/BLOCK: 21PH3 SUBDIVISION: WATERSTONE CITY: FT PIERCE DRAWN BY: KSANCHEZ JOB # : 2819524 DATE: 08r15/2021 SCALE: NTS PLAN DATE: 1 2021 REVISIONS: 1. 2 4. 4408 Airport Road Plant City, FL 33663 Ph. (813) 306.13W Fax (813) 305-1301