HomeMy WebLinkAboutTruss DrawingsZ12L ®LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that
should be read and given special attention to all
persons installing trusses.
SPACING NOTE
All trusses are to be set 2'-0" on
center except as noted.
MULTIPLE PLY TRUSSES MUST BE FASTENED
TOGETHER PER ENGINEERING BEFORE
SETTING. REFER TO ENGINEERING DRAWING
TO DETERMINE IF MULTIPLE PLY, a .
I
r
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
CONSULT BCSI
0
30' Sp In or less —Spree der Bar
Legreesss
Tag line �— 112 span Tag line 4*---Appfox 2P3 to —�
approx. 112 of Span,
REFER To SCSI REFER TO SCSI
Truss must be set this way if crane is used. Truss must be set this way if crane is used.
Truss is an example, your truss may not match. Truss is an example, your truss may not match.
Insist crane operator sets truss this way. Insist crane operator sets truss this way.
beams,All loC,-3%d bearing walls, headers,
` be in place
I,!\ are installed. / i\
at indicated height before trusses
HANDLERAIR •
Contractor.Unless noted elsewhere on this layout, these trusses are not
designed for air handlers in the roof or for any other A/C
requirements. This may be in conflict with building code and A/C
Design requirements. Consult with Building Department and A/C
Z�-s WA m1mv IN GOOL
The size of these trusses makes it necessary that they a set by a profeesional builder
familiar with and experienced in the problems and dangers of setting large span trusses.
The builder and erector should consult with an engineer licensed in Florida specializing
in wood roof trusses about the safe erection of these trusses. The engineer should be at
the job site when trusses are erected to provide supervision and advice.
REPRESENTS THE LEFT SIDE OF
EACH TRUSS DRAWING
SEAT L TES BY CHAMBERS TRIES
REPRESENTS A HANGER
DANGER SCHEDULE
USE HUS26 FOR 2X4, SUH46 FOR 4X2 EXCEPT AS SHOWN
CARRIED CARRYING HANGER ID FASTENER FOR FASTENER FOR
TRUSS TRUSS CARRIED TRUSS CARRYING TRUSS
*Please refer to Standard Engineering package for general instuction on installing hangers
10d=0.148" x 3" 16d=0.162" x 3 1 /2"
a
4.
LOAD
BEARING
AT 91— "
LOAD
BEARING A
1 4'-2 5/16"
! Dco
A i
>! 'r and hangers !!
' IN LENGTH!
•
HIP CARRIER LGCATED AS DIMENSIONED C, n,yoOl
CORNOR JACjCS
ARE NpY 9EVE#LED.
SEE S" 'VUME
F
ENGINEERING_
U z
C;
OU O
24" O.C. THRU
CORNER JACKS
i7?JLY 24" ,' 1.111S
CORNER DETAIL
OVERHANGS NOT SHOWN! FOR CLWTY
PLUMB CUT END 12
O■ CHORD
► • 1
END DETAIL: COFFER
■'
LUMB CUT END 12
TOP
CHORD
VARIES
DETAIL:END TYPICAL
M POP— a opgapop OF m-- �op
11
FABRICATION AGREEMENT
TRUSSES CANNOT BE STARTED UNTIL. THIS AGREEMENT IS SIGNED & RETURNED
The undersigned acknowledges and agrees:
1. Trusses will be made in strict accordance with this truss placement diagram layout, which is the sole authority for
determining successful fabrication of the trusses.
2. All dimensions in this layout have been verified by the undersigned.
3. Unless written notice is provided by certified mail to Chambers Truss within ten (10) days of delivery the
undersigned agrees that no backcharges will be allowed. In the event such written notice is furnished Chambers Truss
'shall have three (3) business days in which to begin repairs required, or to substitute other trusses, at Chambers option.
After 10 days of delivery remedy will be according to Florida statute 558.
4. The undersigned acknowledges receipt of "BCSI" summary sheet by TPi & WTCA.
5. Delivery is to job site. It is the buyer's responsibility to make the job site suitable for delivery. Chambers Truss has
the sole authority to determine the suitability of the job site or a portion of the job site for delivery. Chambers Truss will
Pe responsible for dump delivery only, The buyer Is responsible for additional delivery expenses if Chambers Truss has'
to redeliver because job site is not prepared for delivery or buyer is not prepared for delivery of trusses. Buyer is
responsibte to Chambers Truss for towing costs due to site conditions.
6. Price as shown In paragraph 7 below is subject to change if any changes are made in this layout. A $50 per hour
fee for revisions may be charged by Chambers Truss.
7. This is a PURCHASE ORDER to Chambers Truss of the sum agreed to, or if nD agreement a reasonable price.
;Invoice will be made on delivery and paid within terms of net on delivery. Invoice may be made at scheduled date of
delivery if buyer cannot accept delivery of fabricated trusses. The undersigned agrees to pay Chambers Truss
reasonable attorneys fee for collections in event of payment not timely made. 1-1/2 % per month service charge will be
added for all sums not paid within terms.
8. Signature or initials anywhere on this sheet constitutes agreement to all terms herein.
9. In consideration or Chambers Truss extending credit for this material the undersigned unconditionally guarantees
payment when due of any and all indebtedness owed to Chambers Truss by any entity receiving material and the
I ndersigned agrees to pay such indebtedness including attorney's fees, if default in payment for material be made by the'.
recipient.
10. In the event of any litigation concerning this agreement, the items furnished hereunder or payments referred to
herein, the parties agree that the sole venue for any such action will be Saint Lucie County, Florida.
11. Design responsibilities are per mNational Standard And Recommended Guidelines On Responsibilities For.
Construction Using Metal Plate Connected Wood Trusses ANS€ITPIMTCA 4 - 2002m
12, Warranty is per Chambers Truss Warranty attached.
FOR / --TITLE�r�
A spreader bar may be required per "BCSI" to prevent injury & damage.
Multiple ply trusses must be fastened together per engineering before they are
set, failure to do so can result in roof collapse.
Temporary and permanent bracing are required and can save life and property
and is the responsibility of the truss erector.
Study the contents of the information packet !included on delivery before
setting trusses.
Trusses must be set and braced per design to prevent injury & damage,
Trusses must be set plumb and square
Do not set bunks or stack of plywood, roofing material or any other
concentrated loads on trusses, this can cause collapse.
DO NOT INSTALL TRUSSES USING THIS
IJSE PLAN DELIVERED WITH TRUSSES TO SET TRUSSES
CliIIIIIIAMBEKb TFRUSSi INC
MITEK VERSION 7.4.t0l
LOADINGIDESIGN CRITERIA REDUCIBLE
PER CODE SUCH AS SBC 1604,8 1
DESIGN CRITERIA
County
ST. LUCIE
Building Department
ST. LUCIE COUNTY
Wind Design Criteria
ASCE 7-16
Wind Design Method
MWFRS(Directional)/C-C
hybrid Wind ASCE 7-16
Roofing Material
Shingle or Shake
Loading in PSF
Roof R.D.L.
Floor
Top Chord Live
20
0
Top Chord Dead
7 4.2
0
Bottom Chord Live
*10-Non Conccurent
0
Bottom Chord Dead
10 3
0
Total Load
47 7.2
0
Duration Factor
1.25
0
Wind Speed
160mph
Top Chord C.B.
Sheathing by builder
Bottom Chord C.B.
Sheathing by builder
Highest Mean Height
15,
Building Type
Enclosed
Building Category
II: Non Restrictive
Exposure Category
C>Open Terrain with scattered obstructions
Miles from Ocean
5
Conforms to Florida Building Code
2020
R.D.L.=Restraining Dead Load
CB.=Continuous Bracing
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Building Designer and/or Engineer of Record
Chambers TrussInc. Drawing Name: 77 552
SCALP 1 //
101 total trusses, 39 unique designs
Designer: RLC Reviewed by: RLC
Date: 05/26/21
FOR
FAT RO ASSON
op
DESCRIPTION. - _
ELIZA,BETH SPEC
Page 1 of 1 CUSTOMER INITIALS EACH !PAGE
775,5