Loading...
HomeMy WebLinkAboutREVISIONc u r,rv_2" F_1 0 0 0 F-1 a o oo F_1 ao o 0 I T-4" T-8" 4'-10", 8 91-0" 00 O I I ❑ 00 -00 1E I DF-60 00 I - ❑ I I 4 - I F-1 I I N I I O 00 121 a 00 00 00 0o a o0 o — —— — — — — — — — — — — — I I — — — — — — — — — — — N 0 I 0 2 1 /2"" Recess for SI. GI. Dr. ' I I � F-61 1 4'-10„ I 8 0 r � M er 0 — ' N F-4 o I _4„ -1 1 - 1 4"2500# Conc. Pad p I I I 4 3000# FIBERMIX CONC. ❑� I OVER .006 VAPOR BARRIER ON CLEAN, COMPACTED, F-3 I( — — — 4" r TERMITE TREATED FILL .M O I 1I I ASSUMED F.F.E. 0.00' 0� — — — — 5,_4„ 14,-8„ V-8„ 4,-0„ IF-1 8'-2' I r, i 00 1 N ------- F_3-------� o0 0roo Io o -4" -----� NF-2 0 F-61 I � ❑ I M a 1 11 5'-2" 11 F 13 N Slope for I � 1 2'-10" Co 22'_0„ Garage Dr. 8, F-5 —1 I U ( I I o f-5 _ -1 F 21 1 N o o o o 1 4„ I t I o _4," o I 1 I � COI F-5 '� 2-10"1-7"3-10" 4'-5" o F-2 II Rl III E -_ 00 N o8" fI � 1� - co � ------ k Zoo co — M — ---- �, ----- I -4 slope2" o f-6 o F-1 0 o F-1 o F-1 0 l I 1 I M " .00 42 M I Slope for 3'-0" Garage Dr. • ■ I ( O 3,_9„ 5,_2„ 3,_9„ 7°-0" 12'-$", o co 12'-g„ 19,_8„ 8", 22'-0- I 8'" o I I M .I ❑ I I -- ------ I -� F-2 F_2o 'all N 011 lalla a o Foundation & Footing Plan scale: 1 /4" l'-0" 32'-4"" 3,_9„ 1 T-10"' 1 4,_1 „ 4,_1 „ 1 3,-10„ 1 3,_9„ { F-1 j F-2 F-3 I F-4 18" x 16" mono. footing with (2) #5 rebar cont. 16" 18"r MONO. EDGE FOOTING F-5 18" x 16" mono. footing with (2) #5 rebar Cont. 4" /8- - 18" INTERIOR STEP FOOTING FORMWORK & SHORING 18"" x 16" mono. footing with (2) #5 rebar cont. and curb 8„ w rr n rr 16"r 18" CURB FOOTING AT GARAGE 8"" x 8" mono. footing with (1) #5 rebar cont. 4" _ 4- 4" 4„ 8"EDGE THICKENED EDGE Concrete shall be a minimum of 4'" thick over clean, compacted, termite treated fill and 6 mil polyethylene vapor barrier. If concrete slab contains 6"' x 6'" 10/10 WWM provide I- coverage Concrete shall have at minimum compressive strength of not less than 3,000 p.s.i. All 90% hooks are to be extended 10" minimum beyond the turn. Field bends are to be done cold and the diameter of the bend, measured on the inside of the bar, is not to be less than six bar diameters. Minimum coverage for rebar shall be 3" in footings and 1 1/2" in bond beams. Hooks may be rotated horizonitally if required to achieve minimum coverages. Rebar overlap shall be 48 bar diameters. 30' for #5 rebar No structural concrete shall be stripped until it has reached at least 80% of the 28 day design strength. Design, Erection, & Removal of all formwork, shores, & reshores shall meet meet the ACI Standards 347 and 301 Contractor to verify all building setbacks prior to the start of construction. A formboard survey shall be submitted to the building department for approval prior to pouring concrete. SOIL STATEMENT: Foundation has been designed for a soil bearing capacity of 2000 p.s.i. Fill shall be laid in layers of 6". Each layer to be compacted to 95% compaction. If the contractor encounters, while digging the foundation, any discrepancy to suggest the soil may be inadecuate, he must immediately report it to the owner and the Architect or Engineer so as to order a soil boring test. PLUMBING NOTES: Plumber to consult with contractor and equipment ordered for rough in dimensions. Verify all dimensions with the floor plan. The floor plan dimensions dictates all other dimensions on other sheets. Do not scale drawings, if any conflicts arise, contact the Architect or Engineer for clarification prior to construction. All sanitary lines 2" or less shall have a slope of 1 /4" per foot minimum. All sanitary lines above 2- shall have a slope of 1 /8" per foot minimum. Provide Anti -Scalding Valve in all showers. Lowest living area floor elevation (refered as 0.00') to be set by a professional land surveyor to the required building department elevation, but not less than 18" above the crown of the road. I Recess 4" at Shower 8" 18- TYP. SHOWER RECESS 16rr The foundation design assumes that the soil has a minimum load carrying capacity of 2000 p.s.f. In the event the soil bearing capacity falls below 2000 p.s.f. This foundation plan may be superceded by Foundation Design Engineer Satisfactory compaction test of fill does not verify lower soils are adequate. All specifications and dimensions to be verified by contractor. All exterior slabs shall slope a minimum 1 /8" per foot for drainage Dowel Rod Repair Note In the event vertical steel has been omitted from the down pour locations, drill 5" into concrete (no closer than 3 3/4" from edges and 5"" from ends of cap walls) Remove dust per manufacturers instructions and use Two part epoxy to anchor the #5 rebar in place. Use either '"Hilti C-100" or Simpson Epoxy -Tie. corner bars at beam (outside only) (2) corner bars at footing (min.) — vert, dowel lapped with wall reinforcing, all laps 30" (min.) in grout filled cell `1 0 0 • all corner bars to be the same size, number, and spacing as horizontial bars in footing, beams, and walls Corner Reinforcing Detail 100.0 2" v.t.r. I 2" v.t.r. ; 2" I i i Lay. 2' Wash. Sink 2" W.G. 2„ 4" to sewer system 2" Auto Vent 1 E Sink 2" 3" Shower /3 211C7 - 0(o2C V1 U FUG-, my OMPLIANG r:I COUNTY CC 2" v.tr. I � I 2" R Lay. i Lay. W.C. 2J--' II SHWR. Plumbing contractor to provide a water hammer & shut off valve at each fixture Insulate all hot water lines Plumbing Riser Diagram ►.. TOW -1 0N C/) 00 r L. rT "V w Z M M C 0 J w u7 to -- LUto w to p L_ a� LID oo ®N —I a ._ Cn Q ICU V Z w � O • �� > ry 0 w Lo CD C3� +J VJ > M U LLJ LO -- u7 � ., . d,' (U O L_ N r ry_ l— cu 0 O Z r-•.. 00 U UJ DO L.L. CY) U C Q� Cn Q U L_ L. tU C: CL > •� ai o Eco O J rN V 4 O 4V W date revision 1/13/22 Added F-6 Footing drawn s.l. checked s.l. date 10/13/21 scale as noted job number 21059 sheet A--2