Loading...
HomeMy WebLinkAboutKSM Enguneering & TestingAsc51v50 21111- 0 630 JAN 13 2022 Headquarters St. � 11345 U.S. Highway 1 ' 1 Z ENGINEERING Mailing P.O. Box 78-1377 Sebastian FL.32958 Orlando IVA AND TESTING Sebastian FL.32978 Phone: 772-589-0712 723 Progress Way C.A. # 5693 Sanford, FL. 32771 KSMengineering.net December 2, 2021 Complete Construction and Design 755 8th Court Suite #4 Vero Beach, FL. 32962 Re: 1912 Lynx Drive Fort Pierce, Florida KSM Project #: 219325-b Dear Mr. Pryor: As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. Site Description: At the time of drilling, the river front site was flat with some light surface vegetation (grass). Project Description: It is our understanding that a one-story single-family residential structure is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. Although we were not furnished with the structural design loads or a foundation plan, for our geotechnical analysis we anticipate the maximum wall loads for the structure will be less than 1,500 pounds per linear foot along the wall foundation. The structural engineer of record should review our assumptions and notify us if the design loads exceed the assumed loads. We estimate 1 to 2 feet of site fill will be required to reach the desired grades. The Scope of Our Study Consisted of the Following: 1. Performed Standard Penetration Test Borings in the proposed structure area to estimate the subsoil relative density. 2. Measured the observed groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. FIZan c®� Page 1 of 5 1912 Lynx Drive Fort Pierce, Florida KSM Project #: 219325-b Site Investigation: IV V IL I ENGINEERING X%0AU AND TESTING The site investigation program consisted of performing four (4) Standard Penetration Test borings (SPT) on the site. The borings were terminated at depths of 10 to 15 feet below existing grade. The locations of the borings are shown on the attached location plan. The SPT borings were completed in accordance with procedures described in ASTM D 1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Engineering Evaluation and Conclusions: Based on the information obtained from this site investigation we are pleased to offer the following evaluation: The boring logs indicate the subsurface soils consist mostly of fine-grained sand with shell fragments. However, a layer of clayed silt with organics, here -in referred to as "unsuitable material", was encountered from 5 to 7 feet below existing grade. SPT "N" values recorded during the boring operation indicate the soil density is generally firm to medium dense excluding the unsuitable material layer which was found to be very soft. Please refer to the soil boring logs for specific information relative to the soil description at each test location. It is our opinion that the unsuitable layer would cause settlement to the planned structure. This settlement, in our opinion, would be too excessive and beyond the general accepted safe limits for the structure. In order to avoid any damaging structural distress due to settlements, an appropriate foundation system would be an engineered concrete steel reinforced "waffle type" structural slab designed for a net soil contact pressure not exceeding 1,500 psf designed for differential settlement. The structural slab foundation shall have a footing below all load bearing walls, reinforced with both top and bottom steel and poured monolithically with the concrete slab. The slab should be reinforced with rebars and have interior deepened reinforced sections so that the maximum slab span does not exceed 20 feet in any direction. We also recommend the unsuitable material layer be densified through cement grouting under pressure. We recommend a representative from our firm be present to observe, document, and certify that the weak soil layer was properly stabilized. The following sections provide our recommendations for site preparation, foundation design and pressure grouting. Page 2 of 5 1912 Lynx Drive Fort Pierce, Florida KSM Project* 219325-b Site Preparation: Prior to beginning the pressure grout stage of the project, we recommend, for optimum results, that the proposed structure area is filled to the desired grades. Prior to placing fill on this site, the proposed structure area and areas to be paved plus a minimum margin of 5 feet beyond the limits of construction shall be stripped and grubbed of surface debris including vegetation, roots and organic matter. The prepared area should then be graded level and proofrolled. Any soft, yielding areas shall be excavated and replaced with compacted structural fill. Sufficient passes should be made to produce a density in accordance with the provided compaction recommendation to a depth of 2 feet. Once the area has been successfully proofrolled, the site may be filled to desired grades in accordance with the provided fill material and compaction recommendations. We do not recommend using heavy vibratory equipment on this site due to the proximity to the neighboring structures. Once the site is at finished grade the pressure grouting stage may begin. Please refer to the Pressure Grouting section for more recommendations pertaining to pressure grouting. After excavating for the footings, the disturbed footing subgrade should be recompacted in accordance with the provided compaction recommendation. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. We recommend field density tests be performed at appropriate times during the earth work operations in order to verify that the site has been properly constructed. Fill Material and Compaction: Structural fill shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Fill should be placed in loose layers with a maximum thickness of 12 inches. Compaction of each lift shall be least 95 percent of its modified Proctor value (ASTM D 1557). We recommend field density tests be performed at appropriate times during the earthwork operations in order to verify the site has been properly constructed. In -place density of the compacted soil can be verified using a nuclear density gauge or any other ASTM approved method to determine percent compaction. It is our recommendation that compaction tests in the excavated footings should be conducted prior to placement of any steel or concrete and conducted at every column footing and once for every 100 linear feet of footing trench. Subgrade and each lift of fill should be tested for compaction at a frequency no less than one test per 2,500 sf of building area, per lift with a minimum of 4 tests in each area prepared. The placement and frequency of testing can be modified as the discretion of the site contractor and the onsite soils technician based on the requirements of the project as stated by the Engineer of Record. Page 3 of 6 1912 Lynx Drive Fort Pierce, Florida KSM Project #: 219325-b Pressure Grouting: Prior to beginning the pressure grout stage, the site preparation stage must be concluded which includes the placement and compaction of fill to subgrade. The injection points of the pressure grouting shall not exceed 5 feet on center below load bearing walls (interior and exterior locations) and at least 1 per column pad which is less than 3 x 3 feet. The contractor shall offset the bearing wall injection points to ensure proper densification under the foundations. KSM recommends providing an injection point plan for our review prior to the installation of pressure grouting. The tip of the injection point should penetrate the soft soils so that the injection points create a lift of at least 1/8 of an inch of ground heave. We recommend the design grout mix per batch should be proportioned as to prevent excessive travel which would prevent compactive effort or an admixture used to facilitate the gelling time of the grout to allow for the seal of the grout hole to set. The licensed contractor should be experienced in soil pressure grouting, and the mix utilized in the field can be modified under their direct supervision. The mix may also need to be modified based on the thickness layer. The decision of the mixture is the responsibility of the licensed grout contractor. Upon completion of the recommended pressure workmanlike manner following industry standards, be verified with additional soil borings to ensur achieved prior to any additional foundation wor borings is determined by the size of the project during the drilling process. '•. grouting by a licensed contractor in a KSM requires the densification of the soils e that the specified soil densification is k starting. The total number of required along with judgement of the Lead Driller Based on the discovered soil conditions, the proposed pool can be designed and constructed using an allowable soil bearing pressure of 2;000 pounds per square foot. When excavating the pool, if any organic soil or soft material is encountered, these materials/soils should be removed and replaced with 3/" stones so the subgrade becomes firm below the pool bottom. Please note that after placing stone in the bottom of the excavation, granular soil should never be placed on top of the stone. Backfill material behind the pool shell shall consist of clean granular sand with less than 10 percent "fines" passing the U.S. No. 200 sieve. Place backfill material in loose lifts of 12 inches in thickness and compact each lift to no less than 95 percent of its modified dry Proctor value (ASTM D 1557). Page 4 of 5 1912 Lynx Drive Fort Pierce, Florida KSM Project M 219325-b Closure: 'v C'1 I' ENGINEERING A%QJM AND TESTING Based upon our subsurface investigation at the above -mentioned project location, the reliance of the recommendations presented within this signed and sealed report is predicated on KSM representative's involvement to verify that not only have the soils been prepared following the indicated recommendations, but the site preparation, pressure grouting and foundations are installed in compliance within the parameters indicated. This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, karst activity and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please feel free to contact the office. Respectfully, Cody C. Clawson, P.E. Geotechnical Engineer Florida Lie. No. 91598 CCC/cv Email to: pandvproperties@ C LA o.• ��E'''SF' :02. 9," 2,- 2®21 : w •'wz", STA'M • =W: � ��%` corn Page 5 of 5 KSM Engineering & Testing BORING NUMBER B-1 P.O. Box 78-1377 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Complete Construction & Design PROJECT NAME 1912 Lynx Drive PROJECT NUMBER 219325-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 11/30/21 COMPLETED 11/30/21 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 1.58 ft LOGGED BY JP/SF/TG CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- tt A SPT N VALUE A U a� of >- wo U) W w �� S �_� 20 40 60 80 PL MC LL ax W O MATERIAL DESCRIPTION Wm g 0 0Z—=i O Q W w Z a —�—; p Q- Z OU - m O Z v" }" 20 40 60 80 ❑ FINES CONTENT (%) ❑ O < W 0 o Light Brown Sand with Traces of Shell Fragments - SS 2-3-4 (7) Gray Sand, Slightly Silty and Slightly Clayed with Traces of Shell Fragments ...................................... SS 6-9-9 (18) ..... .: ....... :....... :....... :....... SS 6-4-5 (9) ...................................... ....................................... Light Gray Sand with Traces of Shell Fragments SS 4-6-6 (12) ...................................... .... .: ....... :....... :....... :...... . Light Gray Sand, Slightly Silty with Traces of Shell Fragments SS 2-5-4 4 (9) ...................................... :.......:.......:.......:....... ....... ........ :....... :....... :....... a: o .A •s,.:e•: Light Gray Sand with Pieces of Cemented Shell (Rock) SS 12-22-24 (46) Bottom of borehole at 15.0 feet. KSM Engineering &Testing BORING NUMBER B-2 Box 78-1377 KSMP.O. Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Complete Construction & Design PROJECT NAME 1912 Lynx Drive PROJECT NUMBER 219325-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 11/30/21 COMPLETED 11/30/21 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 1.75 ft LOGGED BY JP/SF/TG CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- W o z A SPT N VALUE v o Qf Wm >- Wo cn w �Z� W t= 20 40 60 80 PL MC LL w n=_O O MATERIAL DESCRIPTION g > C3 O❑¢ �c w w z n i I ❑ 0 o- ❑ z O m O > U ? Y " ❑ " 20 40 60 80 ❑ FINES CONTENT (%) ❑ < W a M 0 20 40 60 80 Brown Sand with Traces of Shell Fragments ....................................... SS 2-2-3 ° Gray Sand, Slightly Silty with Traces of Shell Fragments (5) :: ....:..............:.............. SS 2-3-5 ....................................... 5 SS 5-7-3 ....................................... = Dark Gray Clayed Silt with Traces of Organics and Shell (10) ......:.......:.......:............... m = SS 1-1-9 Light Gray Sand, Slightly Silty with Traces of Shell Fragments 10 SS 7-10-11 En O ° N Light Gray Clayed Sand with Pieces of Rock and Traces of Shell m Fragments SS 6-3 4 ...... :............. .:.......:....... h 15 (7) Bottom of borehole at 15.0 feet. W W cn Y_ u U O w J LL En En Y_ Y n 0 m a ❑ c� co 3 U) ❑ z v7 0 J a x m x O W F- O w 0 KSM Engineering &TestingP.O. Bx 8-1377 BORING NUMBER B-3 KSM S basstl n7 FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Complete Construction & Design PROJECT NAME 1912 Lynx Drive PROJECT NUMBER 219325-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 11/30/21 COMPLETED 11/30/21 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample �-Z AT TIME OF DRILLING 2.33 ft LOGGED BY JP/SF/TG CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- w o A SPT N VALUE A aE U a0 > wo <n w 0z� w �� ~� 20 40 60 80 PL MC LL w o MATERIAL DESCRIPTION wm J > CY O❑ Q w w z ❑ V o-❑ z 0� m0> U? Y" 0 20 40 60 80 ❑ FINES CONTENT (%) ❑ < W O 0 20 40 60 80 Dark Brown Sand :.,•: SS 3-3-4 Light Gray Sand with Traces of Shell and Rock (7) ....................................... ...............................:....... SS 6-4-3 = Brown Clayed Silt with Traces of Organics (7) ................................ .......Dark 1-1-4 ...................................... ° Gray Sand, Slightly Silty with Traces of Shell Fragments ° SS (5) :....... :....... :....... ...... . 10 ° SS 6-8-10 (18) .............. ........ ........ :...... . ....... ....... :....... :....... :...... . ......:.......:...............:....... Light Gray Clayed Sand with Traces of Shell :--------- KSM Engineering & Testing BORING NUMBER B-4 KSMP.O. Box 78-1377 PAGE 1 OF 1 Sebastian, FL 32978 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Complete Construction & Design PROJECT NAME 1912 Lynx Drive PROJECT NUMBER 219325-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 11/30/21 COMPLETED 11/30/21 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 2.25 ft LOGGED BY JP/SF/TG CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING - W o ♦ SPT N VALUE A a LUm w 20 40 60 80 PL MC LL a =O _ w� 0z� O H� F-� o v O MATERIAL DESCRIPTION - a > Ci O� Z) ¢ m O> w 42 Y" Z o. IO-; 20 40 60 80 2 Z U U z U % < W o ❑ FINES CONTENT (%) ❑ n0. 0 20 40 60 80 Dark Brown Sand SS 2-4-6 Dark Brown Sand with Traces of Shell Fragments (10) ....................................... . o: •'. 3-3-4 ; :... •:. SS (7) ........ ....... .............. :....... 5 Dark Brown Clayed Silt with Organics 4-2-1 a. SS (3) ...... ....... :....... ....... :....... N Gray Sand, Slightly Silty with Traces of Shell Fragments 1-1-3 m SS (4) :.......:.............:....... oSS 4-6-7 ... ... :....... :....... :....... :....... F 10 (13) Bottom of borehole at 10.0 feet. r m Z z_ J_ 0 N N N m m K W W N Y N U O ❑ N w J LL u) Y Y r R o� N a a ❑ c� m 5 u) u) z 0 J a x m 2 U W H W C7 • Ls; Y B 4 R ' B-2 4 B-3 B-4 +LOCATION OF SOIL TESTING PROJECT: 1912 Lynx Drive, Fort Pierce, Florida DRAWN BY: C.V. SHEET 10F 1 V At ENGINEERING DESIGNED BY: C.C.C. PERMIT #: PROJECT #: 219325-b AND TESTI N G DATE: 20211202 SCALE: NOT TO SCALE