Loading...
HomeMy WebLinkAboutTruss End DetailAn, n'1 (D T U O 0 W r— r- 0�4 �-- - ` C:)i r 1- CL e CV H V3 (V PLUMB CUT OVERHANG LO 0 0 0 r r r N CV TYPICAL CORNER SETT DIM'S _ N.T.S. V-05/16" 21 2r V-11 11/16" 2r n O.C. T P TO ODD SPACE Hatch Legend T.O.B. @ 8' A.F.F. 2:12 VAULTED CEILING C) LO ................. i 121 VIN1111 Fli"Mil' J 2820 Kirby Cir. NE, Palm Bay, FI. 32905 Phone: ( 321 ) 409-9800 Fax: ( 321 ) 409-9803 *'• Signature of this document acknowedges that the client has reviewed this truss placement diagram in its entirety and is in agreement with the following items, including but not limited to: A.) The client is responsible to verify the accuracy of information submitted for use in design, fabrication, and scheduling. Any labor, material, or time delay incurred from inadequate or incorrect information supplied from the client will beat the clients expense. B.) Design Criteria: The client acknowledges that the truss design criteria noted on this truss placement diagram meets or exceeds the design criteria specified by the building designer, engineer of record, and local and state building requirements. q Fabrication and Delivery: One approved truss placement diagram must be returned to the truss manufacturer before fabrication and delivery will be sscheduled. It is the client's responsibility to coordinate delivery dates with the truss manufacturer. The client shall provide a marked location for delivery, which must be accessible, level, and dear of material and debris; in lieu of this, trusses will be delivered in the best available motion at our driver's discretion. Care and handling othee trusses --r following dilvery is the resporuibilty of the client 0 D.) Installation & Bracing: BfSI 2009 ( Building Component Safety Information ) WTCA JTPI Cr d guidelines shall be followed when handling; installing, and bracing trusses. Temporaryand Jor a permanent bracing and blocking is not included in the buss package. Trusses shall be braced to Q prevent rotation and provide lateral stability in accordance with the requirements specified in the Z construction documents for the buildmg and an the individual truss design drawings. The overa ll w J stability of the truss system is the responsibility of the building designer. v E.) Reid Framing. 1) Tray ceilings and other ceiling transitions may require field fram I ng by others. 2J Ceiling drops and valleys rot shown are to be Reid framed by others. 3.) Overhangs maybe over length - cut to fit in fx & Overhangs are 2x4 or 2x6 -no blocking is applied. Comer jacks will be square cut and hip jacks will be double beveled. F.) Repairs: Truss related problems are to be reported to the truss manufacturer ASAP, preferably in writi nA;. DO NOT CUT ANY TItL155E5 before contacting the truss manufacturer with specifics of the problem. Any field modifications made without an engineered repair drawing will be the responsibility of the client. No back charges or crane charges of any kindwill be aocpeted, unless specifically approved in writmn l by the truss manufactwer's management. G.) This Truss Placement diagram was not created by an engineer, rather byTibbetts Lumber Co. LLC staff, and is purely to be used as an Installation guide and does not require a seal. Truss dessgn analysis are on the Truss Design Drawings which maybe sealed by the Truss Design Engineer. Floor Load; Roof Load; 55# psf; 40 TCLL, 10 TCDL, 0 BCLL, 5 BCDL; our.: 1.00 37# psf; 20 TCLL, 7 TCDL, 0 BCLL, 10 BCDL; Dur.: 1.: Design checked for 10 psf non -concurrent ILL on BC. Design checked for 10 psf non -concurrent LL on BC. Mitek Engineering Exposure : C Building Code : FBC 2020 Mean Hgt. :.:... ASCE 7-16 Bldg. Cat. : II TPI 1-2014 Importance Factor : 1. Truss Design C & C Enclosure td w H Uplift Calc. MWFRS Entry xposed to Wind Wind Speed 160 mph US Lanai Exposed to Wind U Z 0 ROOF CRITERIA FLOOR CRITERIA In w T.C. Pitch 4 / 12 B.C. Pitch 2 112 Depth v T.C. Size VARIES Spacing n- Heel Hgt. 3-15116 Bearing 8" Cantilever 0 Vapor barrier between floor & concrete by others. Floor trusses held back 3Watexterior walls, Overhang g 12" block &Q 111 by others. Blocking for vertical load transfer by space floor trusses around plumbing as noted Spacing 24" o.c. _. TYP. ROOF HANGER: THD26 /1 1 I'i THD26 Qty \(D THD26-2 Qty cn o O THDH26-2 Qty U Z C) THDH26-3 Qty z O �....�� 0 THD28 Qty n F SKH26 L/R TYP. FLR. HANGER: THD46 THD46 Qty NO THD48 Qty THDH48 Qty THDH410 City Install hangers per manufacturer's guidelines. All connectors and tie downs other than truss to girder truss are to be specifie supplied by others. Approved by: 0 CL c N Desired delivery date Approval Date: 0 Y H U Reaction Uplift Reaction Uplift Reaction Up 0 xx xx 7 xx xx 13 xx 2 xx xx 8 xx xx 14 xx X Q 3 xx xx 9 xx xx 15 xx 4 xx xx 10 xx xx 16 — xx I- O xx xx 11 xx xx 17 xx w _I 6 xx xx 12 xx xx 18 — xx a Only points listed above have reaction > 5000 or Uplift > 1000 Values shown on sealed design drawings supersede the above. x x x x w x O O x z O x x re x Client ; P & V Properties Management z w Project : Model 1306 GARAGE LEFT J U Address: 1030 41st Ave. Vero Beach, FL Date, Intials, Description w _ Date : 12/12/2021 Designer : IM ---- -- —-- ---- Project # 511103