HomeMy WebLinkAbout1st & 2nd Floor Planrevisions
no. date
0
_i
Q
0
9
15'-10"
2ND FLOOR PLAN
SCALE: 114' = I'-O"
10'-0"
48'-q I/2 ti
TRUSS CONNECTOR SCHEDULE
FASTENERS PER
ALLOWABLE UPLIFT
PARALLEL LOAD (F2)
PERPEND. LOAD (FI)
PRODUCT
MARK
U5P
CONNECTOR
TRU55
CONC./TIE-BEAM
51NOLE
STRAP
DOUBLE
STRAP
51NOLE
5?RAP
DOUBLE
STRAP
51N6LE
STRAP
DOUBLE
STRAP
APPROVAL
7C-1
HTA 12112R
(q) IOd x 1-112"
-
1870 #
2450 #
710 #
1310 #
270 #
1215 #
FL 176W
TC-2
HTA 20/20
(q) IOd x 1-112'
-
070 #
2450 #
710 #
1310 #
270 #
1215 #
FL 17660
TC-3
RT16M
(q) IOd x 1-112"
(4) 114" x 1-3/4" TAP.
13g5 #
27gO #
4W #
q6O #
630 #
1260 #
FL 1O73q
TG-4
H&AMIOKT
(4) 1/4"x1-1/2" W5
(4) 1/4" x 1-3/4" TAP.
q15 #
1630 #
740 #
14W #
1075 #
2150 #
FL 1761Iq
U ALLOWABLE LOADS ARE BASED ON USP CATAL06 59TH Ed. 2) BLDR MAY USE LON6ER STRAPS OF SAME TYPE SPECIFIED. 5) USE 6ALVANIZED NAILS AS SPECIFIED BY
MANUFACTURER. 4) TAPCONS SHOULD BE LOCATED AT THE FARTHEST POINT FROM THE TOP OF THE BEAM. 5) PROVIDE APPROVED MOISTURE BARRIER PLATE OR BUILDING PAPER
BETHMN MA50NRY WALL AND EACH TRU5 .
1 ST FLOOR PLAN
SCALE: 114" = I'-0"
(AT OR ABOVE FLOOD HT - 5EE SURVEY FOR MIN FLOOD HT)
CALCULATIONS
1ST FLOOR A/C #V STAIR)
1127.0 S.F.
2ND FLR A/C (W/O STAIR)
1,448.0 S.F.
TOTAL S.F.
2,575 S.F.
6ARA6E
282.0 S.F.
COVERED FRONT PORCH
811.0 S.F.
TOTAL S.F.
2,g46.O S.F.
FBC 2020 UPDATE 6-1-21
SQUARE OFF GARAGE WALL
designed
PAR
drawn
PAR
checked
55/PAR
date
1213112O
scale
114" = 1'-O" (U.N.oJ
Job n o . 20-0033 . DUH
QUA
QUANTUM ENGINEERING ASSOCIATES INC.
•
Structural Engineering & Cost Segregation
6415 LAKE WORTH ROAD
SUITE 105
GREENACRES, FLORIDA 33463
W W W.QEASSOCIATES.COM
�aM„STgMe Digitally signed
P�; ��OENgF.;9GC
%.' Na 61190 '•Z
'• by Shawn
13
s E OF
- Stambaugh
Date:
This item has been electronically
i9nedand,ea'ed -ha —ffa 2021.0630
Baugh, PE on the date shown using a
digital Signature.
Panted deedu([hisdoc—.are 13:15:34-04'00'
nsidered signed and sealed and
the signature must be verified on any
electronic copies
Shawn M. Stambaugh, PE
FL. LIC. 61850 — C.A. 26210
W
W
Q
Q
W
o
J
�/
w
IL`
a
o�
z
z
�O
�U
Q'
cn
w
��wU
j
(.0 J
�
Owe
-J z U)
project
U
k---6 v
-J z
U. rn �
w
U_ Ln
O
L U
Ld
U v
z z
L9 LL
LL
L Q
w o
V � —
z
M
�
W
0
drawing
1ST &2ND
FLOOR PLAN
sheet
US