Loading...
HomeMy WebLinkAboutA2 4LOW SLOPE ROOF TOWARDS FRONT 1/4" PER FT. revisions no. date 12 27.5X 63" R.O. DP - 54.Oq + 441.51 NOTE TO G.G. NOTE TO BUILDER: G.G. SHALL A55UME RE5PON51BILTY FOR ALL VERIFY BASE ELEVATION OR FLOOD MA50NRY/R000H OPENING SIZES AND SHALL VERIFY PLAIN MAX HEIGHT WITH WITH PRODUCT 5PEG.'s BEFORE CONSTRUCTION. PROFE55IONAL LAND SURVEYOR BEFORE CONSTRUCTION. REAR ELEVATION SCALE : 1/4" = 1'-0" SEE TRU55 DRAWINGS FOR CLIPPED ROOF TRU55E5 -:El 24 64 X 22 R.O. 17 DP - bb.77 + 41.67 z 37 X51.5 R.O. (i� 20 DP - 54.Oq C'IT- + 4q.67 = "X 63" R.O. 20"X 63" R.O. - - - - - - - 0 + 4q.67 + 4q.67 37"X 3q" R.O. �° 7"X 3q" R.O. - bb.-r op - 54.Oq + 4q.67 + 41.67 36 X q6 R.O. 37 X51.5 R.O. DP - 7.62 OF - 54.Oq LEFT ELEVATION SCALE: 1/4" = 1'-0" 22'-O" FIN FLR MAX BLDG HT. 17'-6" T.O.B.B. 6'-O" GLG 9=6" T.OP ..F.E. I6"DP FLR TRU55 5.67' N.A.V.O. O'-O" F.F.E. MIN PER SURVEY 22'-0" PIN PLR MAX BLDG HT. 17'-6" T.O.B.B. 8'-O" GL6 "9=6" T.O.P.P.E. IS DP FLR TRU55 - 8'-0" GLG 5.67' N.A.V.O. O'-O" F.P.E. MIN PER SURVEY 4 75 X b3l, R.O. 75 "X 63" R.O. DP - 5q.65 Ll L LIE1=1D OO TO G.G.qb"X qb"R.O. q6"X 5q"R.O.[_____NOTE G.G. SHALL VERIFY ALL FIN15HED DP - 55.15 DP - 4q.bO FLOOR HEIGHT5 (N.A.V.D) $ STAIR + 44.06 + 45.37 R15ER5 8 TREADS W/FINAL GRADE BEFORE CONSTRUCTION O - - - 37 X 52 R.O. DP - 54.Oq - - - - + 441.67- - - - -El 0 1011111111111 II (i) 54"X 76"R.O. DP - 51.12 + 46AO 10 37"X 63" R.O. DP - 52.76 + 46.55 O O O 27.5X 63" R.O. 27.5X 63" R.O. 27.5X 63" R.O. DP - 54.0q DP - 54.Oq DP - q.67 + 441.67 + 4q.67 + 4q.67 NOTE :TRU55 COMPANY TO VERIFY THAT OVERALL HEIGHT OF OF ROOF DOES NOT EXCEED 22'-0" ABOVE FLOOD RIGHT ELEVATION SGAI F • 114" = P-n" SHOWN a ANrI_F LOW SLOPE ROOF TOWARDS FRONT 1/4" PER FT. (BUILT UP ROOFING W/RUBBER MEMBRANE) DIVERT WATER TO GUTTER 12 .5703 NOTE TO G.G. G.G. SHALL VERIFY ALL MASONRY AND ROUGH OPENINGS BEFORE CONSTRUCTION FRONT ELEVATION SCALE: 1/4" = 1'-0" 22'-O" PIN PLR at MAX BLOC, HT. S.M. SEAM GALV. ROOFING 17'-6" T.O.B.B. 8'-O" GL6 CUTBACK OVERHAND TO ALLOW FOR GUTTER SYSTEM _9=6" T.O.F.F.E. I6' DP FLR TRU55 - 8'-O" GLG 5.67' N.A.V.O. 01-01, V.O. MIN PER SURVEY 22'-O" FIN FLR MAX BLDG HT. S.M. SEAM GALV. ROOFING 17'-6" T.O.B.B. 6'-0" GLG CUTBACK OVERHAND TO ALLOW FOR GUTTER SYSTEM "9=6" T.O.F.F.E. /v DP FLR TRU55 - 6'-O" GL6 5.67�' /N�.A. V.D. 0'-V" F.F.E. MIN PER SURVEY FBC 2020 UPDATE 6-7-21 SQUARE OFF GARAGE WALL REV #2 6-6-21 CHANGE TO MONO FTG REV #3 1/1/22 BLDG GMT5 - PERMIT # 2110-0652 REV #4 1/25/22 BLDG GMT5 - PERMIT # 2110-0652 designed PAR drawn PAR checked 55/PAR date 12/31120 s ca l e 114" = 1'-O" (U.N.OJ Job n o . 20-0033 . DUH QUA QUANTUM ENGINEERING ASSOCIATES INC. • Structural Engineering & Cost Segregation 6415 LAKE WORTH ROAD SUITE 105 GREENACRES, FLORIDA 33463 W W W.QEASSOCIATES.COM Shawn M. Stambaugh, PE FL. LIC. 61850 - C.A. 26210 W W Q Q ry W o J �/ w L` a o� z z JO U)U Q' cn w �wU J D Gw�- I --I J Z U) project J z U. - J W to U_ z > O L U Ld U v z z L9 LL _ LL L Q w o V � -c<v - LLLI M U, drawing ELEVATIONS sheet A-2