Loading...
HomeMy WebLinkAboutPROJECT DESCRIPTION & SPECIFICATIONSDc cuSign Envelope ID: D950F3A6-BDF1-466A-9FF1-F90C9EC3293A DocuSigned by: � 869962AB01 A941 C... MASTER BEDROOM LIVING ROOM Remove & Replace DrywRemove Drywall �MEP oWo k ll as Needed for (�) for MEP Work; Wall to be Restored Per Fire Wall Rating Ceilings to be 00 Removed and Replaced as A Ceilings to be 00 O needed for MEP Removed and Replaced as needed for MEP ,7T I___fKITCHENin 0 L� Remove & Replace Drywall as Needed for Remove Drywall MEP Work (Typ) for MEP Work; Wall to be Restored Per Fire Wall Rating A / A BEDROOM E — DocuSigned by: 0 ° 'o 00E 11tt11111181" OPG E 02q�4,. nrn n L n No 73135 J m W W In # STATE OF W �o C/7 E .:��� N 60 S00NA� ��.•`` Uj Q Marco W «n I NN0 Q p�O N o r) i". 0 N PATIO **It has been verified that existing slabs above and below unit are not post —tensioned J W ° 0 0 ° w L)W� z w 0 OLU a 0 W Z Y AGE w N NG 21-039 �ecr S-1 Dc cuSign Envelope ID: D950F3A6-BDF1-466A-9FF1-F90C9EC3293A Typical Drop —Down Ceiling Framing 25 Ga. Stud Runner Attached to Clip Angle w/ (2) #7 Tek Screws 0 25 Ga. 1j" Vertical Framing Stud @ 16" o.c. Attached to Steel Stud Runner w/ (3) #7 Tek Screws 25 Ga. 18" Horizontal. Framing Stud 16" o.c. Attached to Steel Stud Runner w/ (3) #7 Tek Screws 18 Ga. L2"x2"x4" Clip Angle 0 16"o.c. w/ 0.145"x0.5" Shot Pins @ 12"o.c. d 4 —'--Existing Concrete Slab Over Precast Form Panels; (No Post —Tension) J" Drywall w/ #7-1" Drywall Screws E 0 GENERAL STRUCTURAL NOTES o Applicable Codes (0E „® A. Construction shall be inLL J accordance with the 7th Edition of the 2020 Florida Building Code .v (fi WW and ASCE 7-16. The above shall N ° govern except where other N applicable codes or the wQ� construction drawings are more 1­-a&o restrictive. iz a d NNE Q p�O Metal Framing 11 W A. Studs shall be 25 gauge metal ra., or)r, and meet the Steel Stud Section A —A Fire Wall Manufacturers Association Standards. B. End studs shall be seated firmly in the top and bottom runner Existing Reinforced tracks. Concrete Slab; (No Post -Tension) C. All lateral bracing must be G fastened at the time wall is erected. D. Use a minimum of 3 Studs at I= 25 Ga. 1j"x1j" wall corners and intersections. o Drop Down E. All screw connections are based Ceiling Framing on CCFSS Technical Bulletin Vol. 2 e $ w/ J" Type No. 1 which outlines the AISI o m Y Drywall; Specifications for screw As Needed connections. A J" clearance must be maintained from all edges of steel members. Type 'x' Drywall or F. Power driven fastener system, a Cement Board over 1" PT expansion anchors, masonry U) Furring Strips @ 16" o.c. screws, and adhesive anhor LU 10" Reinforced system connections are based on ° Concrete ° literature published by Hilti Shear wall Fastening System, Inc. Alternate Q fasteners in accordance to Hilti w specifications are acceptable. ° A Neighboring Remodel Unit Typical Ceiling Framing Unit Bathroom 25 Ga. Stud Runner Attached to Clip Angle w/ (2) #7 Tek Screws 0 25 Ga. 1 j" Framing Stud 0 16" o.c. Attached to Steel Stud Runner w/ (3) #7 Tek Screws (-18 Ga. L2"x2"x4" Clip Angle @ 16"o.c. w/ 0.145"x0.5" Shot Pins ® 12"o.c. Existing Reinforced Concrete Slab; a a (No Post —Tension) 4-Hour Fire Resistance Rating 10" Carbonate Aggregate Existing Concrete Slab Concrete w/ Type Y Drywall Over Precast Form Panels; Over 1" PT Furring Strip (No Post —Tension) �- DocuSigned by: (ACI 216.1 M-7) J" Drywall w/ #7-1" Drywall Screws DocuSigned by: 869962A601 A941 C... Verification of Construction Conditions A. Dimensions and elevations of construction are for bidding only. B. Contractor shall inspect existing conditions and verify dimensions, elevations, etc.. which affect the scope on the construction drawings. C. The Engineer of Record shall be notified of any variations or discrepancies on the construction drawings. Any variations of the J constructions drawings without the w Engineer of Record consent are 0 the responsibility of the contractor and owner. 0 C) w D. The construction drawings depict o I a finished product and all (0 O temporary bracing and means and Y 0 methods of construction are the LU Y z O responsibility of the Contractor. N E. All framing, drywall, and insulation 21'39 products shall be furnished and installed in accordance to all applicable governing codes and S-2 manufacturer specifications.