Loading...
HomeMy WebLinkAboutContractMcGee (1) VERO BEACH PORT ST. LUCIE TOTAL HOME 772-646-4795 FORT PIERCE STUART NAME: DATE STREET: CC/C'0�5z 75� �1&zjl CITY/STATE/ZIP: / J HOME PHONE: ��+� �1• 3�L � IC/OC G CELL PHONE: EMAIL: " PESCRJ ($jAMOCI�V- ROOF Due Care taken to protect home exterior,shrubs and landscaping. Includes labor to remove existing roof and haul off. Includes Dumpster. Roll off dumpster for paver driveways. Includes inspecting deck for damage and renailing to code with 81)ring shank nails. Includes saving gutters,soffit,fascia on existing home(some damage may occur in construction). Includes replacing ridge vents. Includes replacing existing drip edge in choice of color. DRIP EDGE COLOR P�fl) initial Includes 1 1/4" roofing collated nails. + /� Includes installing new shingles in choice of color. SHINGLE COLOR Initial l Includes replacing all lead boots and goose vents(does not Include gas related vents). Includes new galvanized metal in all valleys. Includes Starter Shingle and Ridge Cap per Code. Includes obtaining and posting permit with local jurisdiction. Includes magnetically sweeping job site,cleaning out gutters and hauling away debris. n, MATERIAL ARCHITECTURAL ASPHALT LIFETIME SHINGL ? 131)MP V UNDERLAYMENT PEEL&:STICK MISCit h� �1'�1�� ll,y„�►J�� -TG7 Y �� L/, `� � 1 -` INCLUDES LABOR AND DUMPSTER TO REMOVE r LAYER(S)OF SHINGLES. ` ADDITIONAL LAYERS WILL COST$��PER-LAYER � initial Deteriorated existing decking replaced at$ f per sheet of plywood � Cl(/d Deteriorated existing decking replaced at$ _per linear ft. initial+ pl 'Does not Include painting to match "Does not Include any stucco repairs where deteriorated flashing had to be replaced. WARRANTIES Drlry-Fre Gald �,_� 7 yrnon-prorated WORKMANSHIP INCLUD ` 'Flat roofs carry a 7 year workmariship warranty "CUSTOMER WAIVES INTERIOR DAMAGE PRE-INSPECTION - Customer Initials ot rd��,,,,��yy�� (Any interior damage which occurs during construction will not be covered O'er" 1�h) NCLU,D£'S NEW WIND MITIGATION INSPECTION_ ` TOTA ` _ EASY FINANCING'OPTIONS %rMonthly Payment ` 9-90%:i4PR iZ_rnonths NOJNTEREST "Through Wells Fargo Bank with approved credit. •Financing musrbe complete priort"tart-ofproject.- y A—Z CUSTOMER SIGNATURE DATE TOTAL HOME RO NG DAfE 1 HAVE READ AND UNDERSTAND THIS PROPOSAL,THE ATTACHED TERMS AND CONDITIONS,AND ALL-DOCUMENTS REFERENCED THEREIN AND AGREE TO BE BOUND BY THEIR TERMS. ACCEPTANCE OF PROPOSAL:The above prices,their specifications and conditions are satisfactory and are hereby accepted. Contractor is authorized to do the work as specified. By signing this form,I specifically represent that I have the authority to authorize the Work 1)on my own behalf,ii)as an insured under any policy covering the Work,iii)or as a joint owner of the property described above("Property")with the express authority of any other joint owners. �T ALL PAYMENTS ARE DUE UPQN COMPLETION OF THE PROJECT. Any delay in payments may result In 1.5%interest per 30 days. Wind Mitigations are not considered part of the project but offered as a service to our customers through a third party certified licensed inspection company and shall not be used as reason for any delay of final payment. This agreement constitutes the entire contract by and between Contractor and Owner and parties are not bound by oral expressions or representations by any party or agent of either party.