Loading...
HomeMy WebLinkAboutEngineering & Testing 7-23-13From: 0712_'"'F3 1'2:47 #856 P.001/001 'N I�u5, 0J Z( Phone 954-784.2941 L4eder"a 800.848-1919 Fax 954.784-7875 & TESTING INC. www.fed-eng.com 260 SW IMAve Pompano Beach, FL33M Client: Mel-Ry Constuction Date: July 22, 2013 Address: 10967 S. Ocean Drive, Jensen Beach: FL 34957 Order #: �13-2003/468 Project: Proposed Residence Lot 921 Permit #: Address: 10701 S. Ocean Drive, Jensen Beach, FL Tech: SJ Area Tested: Building pad Compaction Req.: 950/0 Material Type: Pale Brown Sand w/Shell Frags Proctor Method: ASTIVI D-1557 Test # TEST'LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NW Comer of Pad .12" FG 8.1 108,1 107.9 12.6 100.2% Yes 2 SW Comer of Pad 12" FG 7.3 106.6 107.9 12.6 98.8% Yes 3 SE Corner of Pad 12" FG 7.9 107.2 107.9 12.6 99.4% Yes i 7 8 9''� 10. 11 12 13 14 15 Remarks: See Reverse For Disclaimer Test Performed Not A Verification Of Soil Bearin 'Ca ad Legend for Elevation: ����o °-�CBNSFaI PR = Proofroll 1,2,3 =1 st, 2nd, 3rd Lift o SL = Springline FL = Final Lift TH LEBLANC . SG = Subgrade BG = Below Grade P� ; essional Engineer#59394 7� BC = Basecourse BOF =Bottom of Footingr'aTEOF �o rt. of Authorization #5471 TOP = Top of Pipe FG = Finished' Grade �� `°��OAIDN ,•• �4 �,^S/ ®.,,• eo fate of Florida 1 0 � Asa mutual protection to clients, the public and curselfs, all reports are submitted as th@44A �f orients, and authorization for publication of statertfentts, conclusions or extracts from or regarding our reports is reserved pending our written aproval. A't hest determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 9n days or after heavy rain/storms, retesting must be performed on this work.