Loading...
HomeMy WebLinkAboutLetter Response To CommentsA R C H I T E C T S Design Groupi��. August 11, 2016 St. Lucie County Planning & Development Services Building & Code Regulation Division County 2300 Virginia Avenue Fort Pierce, FL. 34982 Attn: Building Plan Examiner RE: Standard Pacific Homes Riverbend Lot 23 Permit No. # BLDG 1607-0482 Dear Sir/Madam, This letter serves as my response to comments: .- q y t" f J `By i-a AUv f 1 St. Lucia �:Li;s;`' L 1. U-Factor and SHGC on the energy calcs are high. Please correct the U-Factor and the SHGC showing compliance with Chapter 4 Section 402.1.1 of the 2014 Energy Code Fifth Edition. Response: See revised Energy Calcs attached. 2. Area weighted average for the overhang and the SHGC do not meet the requirements of R405.5.3.4 FBCEC. Please see the SHGC for the glazed openings. Response: See revised Energy Calcs attached. 3. Please submit the energy performance sheets or submit the NFRC Fenestration Manufacture Certificate for the U-factor and the SHGC for each glazed opening showing compliance with Chapter 4 Section 402.1.1 of the 2014 Energy code Fifth Edition. Response: See required documents attached. 4. Product information for N.O.A 11-1013.4 is an outdated approval number. Please submit correct approval number for the PGT 700 windows. See (5)(C) of 9B-72 State Product Approval of the Florida Administrative Code. Response: See updated Product Approval attached. 1441 N. Ronald Reagan Blvd. • Longwood, FL 32750 • Phone: (407) 774-6078 • Fax: (407) 774-4078 AA0003325 www.abdesigngroup.com A R C H I T E C T S ODesign oup Inc. 5. Product information for N.O.A 11-0922.01 is an outdated approval number. Please submit correct approval number for the PGT 700 windows. See (5)(C) of 9B-72 State Product Approval of the Florida Administrative Code. Response: See updated Product Approval attached. 6. Product Review Affidavit calls out metal roofing material, Energy Calc's call out barrel tile roof system. Please correct documents to reflect the actual conditions to be installed. See Section 107 of the 2014 Florida Building Code. Response: See revised Energy Calcs. attached. 7. Plans and Energy Calc's call out barrel tile roof, the product review affidavit calls out a metal :. roof. Please correct documents to reflect the actual conditions to be installed. See Section 107 of the 2014 Florida Building Code. Response: See revised Energy Calcs. attached and delta 1 on sheets D2 and D3. Roof covering revised to show metal roofing. If you have any questions please contact me at (407) 774-6078. Sincerely, James Cantwell Florida Architect #12079 K 1441 N. Ronald Reagan Blvd. • Longwood, FL 32750 • Phone: (407) 774-6078 • Fax: (407) 774-4078 AA0003325 www.abdesigngroup.com