HomeMy WebLinkAboutblower doorY.. Planning & Development Services
Building & Code Regulation Division
,�' 2300 Virginia Ave, Rm 201
Fort Pierce, FL 34.982
Phone: 772-462-2165 Fax: 772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Date: i '7.orti Permit#: l ®„' : �4)v►
Contractor, c e Z a
job Address: ;
Construction: New Construction'— Complete ( ) Existing —After Addition
House Infiltration Vest Results SLC Climate Zone Z r
CFM (50) = s Test Date:
volume = 1 46 3 .a
ACH (50) = CFM (50) x 60 / Volume = � Mechanical Ventilation required less than 3 ACH !
Passing results must be & ACH (50) or Bess (Pass ( ) Fail
FBC, Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Elorido Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Testing Company
Company Name: Pro -Duct Services
Address: 1915 Rio Vista Drive, Ft. Pierce, FL 34949
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements in accordance with Section R402.4.1.2 Climate Zone 2.
Signature:
Printed Marne: Martin Klein
License/Certification #: 5061633
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: �—�i a 1 Permit #: 0y Loi
Contractor. Address: S 3 ( Ci "J� it P..
Construction: /�Oost Construction Test ❑ Rough4n Test
Test Conditions: _
Date: U9� Z a �'t Floor Area (ft2): 35
Time: C,= 3a Primary Location of Supply Ductwork
Indoor Temperature (F): Primary Location of Return Ductwork
Outdoor Temperature (F): _ b
Total Leakage Test (Outside)
Duct Leakage: ❑ Default Prop. Leak Free ❑ Proposed On = • 03
Test Pressure: 2 f (Pa)
Baseline Duct Pressure (optional) _ 04 ( (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results:'i,Pass n Fail
Installed (Pa)
G t t T Total Leakage (ctm): ` 1
Total Leakage per 100 sgft: Z- i 43 v^
CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sgft,
Testing Company
Company Name: Pro -Duct Services Address: ., i {_�� s �" _Af
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 51N Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
�z
Signature:
Printed Name: Martin Klein LicensefCertificate#: 5061633