Loading...
HomeMy WebLinkAboutpower release`r ..�.-.� � �_. . .� i i�tanr�ing �� �evetopxt�en� Se>r�rice� �uiiding 8� Co�e:�.eguta��on ®ivi�ior� 2�Og !lirginia Ave �o>r� Pi®rce, Nr�, 34��2 iReque�� for �o��ay� �'ernnporal�y �ornre�- �etease Dale; 02/03/2022 Pertinit Nutnbei : 2107-0003 Project Address: 5218 Armina Place, Fort Pierce THE UND�RSZGNED HER�13Y REQUEST RELEASE OF ELECTRICAL POVI/ER TO l'HE ABOVE p�SCRIBED PROPERTY, FOR A PERIQD NOT TO EXCEED THIRTY (34) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION fOR A FZNAI. INSPECTION, zN CONSIDERATION OF APPRC)VAL OF THE �tEQUEST WE HEREBY ACI<NOWLEDGE AND AGREI; AS.I=QLLaWS; 1: This temporary power release is requested for tt�e above stated purpose only, and fihere will be no occupancy. of airy type,�other than that permitted by construction during fihis,time period, 2. As .wlthess by tour signatures, we hereby agree fiv abide by all letrns a�td conclltions of t��is agreement, including Building .Division Pallcy, �wliich is f ncorporated herein by -reference. 3. AIf conditions and requlremenrs listed in the attached document entitled "aequlremenls for 30 Day Power i:or Tesfiing"have been fulfilled and�fihe premise is ready for• coinpliance�inspecfilon• h. All requests for• an extension beyond 34 days must be made (n writing:to. the Building Official stating_ the reason foi• the request,- Power may be removed from the site and/or a Stop INot=k order�lssued if the Final Inspectl9n has nafi been approved within �o days. A .fee of $iQO.QQ will be required to lift the.stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST, L11CIE.000NTY, AND THEIR EMPLOYEES FROM ALL LTABILTTIES AND CLAIMS OF ANY TYPE OF NATURE UVHZCH MAY ARISE. NO1N OR zN THE:FUTURE OUT OF THIS TRAi�SACTION, INCLUDING ANY DAMAGE 11VI-IYCH MAY BE YNCURRED DUE TO�THE. DISCOIVNECTiON OF ELECTRICAL.I?�OWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT, ,..._ �.,__, / � f' ���VIn j3QI•lcc��l�a���► 10/14/2021 OWNER I N .�tE t~""� DATE �osopii spalt 10/14/2021 GENERA _. i C�ACTOtt SIGNATURE QATE 10/14/2021 ELECT. ICAL CONTRACTOR;STGNATURE PATE