HomeMy WebLinkAboutBuilding Pad 258421-1 DT- digi 01.19.22 (1)UES Project No:
Workorder No:
Report Date:
3310.2200033.0000
258421-1
01/24/2022
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In-Place Density Test Report
Client:Platinum Enterprise Masonry UES Technician:Mark Rogers
4131 S US Highway 1, Bldg 2 Ste 2
fort Pierce, FL 34982
Date Tested:01/19/2022
Project:CMT United Pentecostal Fire Ministries
202 East Midway Road, Fort Pierce, St Lucie County, FL 34982
Type of Test:
Area Tested:Building Pad - Permit: 1905-0020 Field:ASTM D-6938 Nuclear Gauge Method
Material:Backfill Laboratory:ASTM D1557 Modified Proctor
Reference Datum:0 = Top of Fill
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1 Northeast corner of pad 0-1 ft 109.4 11.2 107.8 10.8 99 Pass
2 Southwest corner of pad 0-1 ft 109.4 11.2 108.4 10.7 99 Pass
3 Center of pad 0-1 ft 109.4 11.2 109.3 10.5 100 Pass
Reviewed By
GFA International, Inc
FBPE Registry No.4930
Alex Albandoz, P.E.
STATE OF FLORIDA
Professional Engineer No. 92555
This item has been digitally signed and sealed by Alex Albandoz,
P.E. on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1