HomeMy WebLinkAboutLetter BMC Consulting- OA Duct DamperNational NAVY Seal Museum Entrance — OA Duct Damper
December 3, 2014
Richard Ahrens
President
AHRENS Companies
P: 1-561-863-9004
1461 Kinetic Road
Lake Park, FL 33403-1911
C:1-561-909-8543
F: 1-561-863-9007
E: rahrens@ahrenscompanies.com
For: National Navy Seal Museum — OA Duct Damper
Dear: Richard Ahrens,
This letter is being written to'address the operable damper in the outside air duct,
which is required per the Florida Energy Code 2010.
Section 503.2.4.4 of the Florida Energy Code indicates the following: Shutoff damper
controls. Both outdoor air supply and exhaust ducts shall be equipped with
dampers that will automatically shut when the systems or spaces served are not
in use.
In order to meet the intent of the code section indicated above, BMC Consulting, would
seek to meet the intent of the code (identified above) by incorporating a "Back Draft
Damper" (BDD) within the outside air intake duct in lieu of a motorized damper. The
BDD would close automatically via gravity when the HVAC system is shut down.
Any questions, please feel free to contact BMC Consulting, LLC at 1-561-644-
1329
Sincerely,
BRUCE M CIARLARIELLO, P.E., CMR, LEED AP, CXA
PRESIDENT
BMC CONSULTING, LLC
�14
0
pC>,c.'••...c OR10,,.•
BMC Consulting, LLC (CA-29409)
8297 Rosalie Ln, Wellington, FL 33414 — Phone:1-561-644-1329 — Fax: 1-561-296-5260
E-mail: bruce@bmcconsultinellc.com website: www.bmcconsultinglic.com
Air System Sizing Summary for AHU-1 I
Project Name: NATIONAL NAVY UDT-SEAL MUSEUM 10/15/2014
Prepared by: BMC Consulting, LLC 09:16PM
Air System Information
Air System Name
Equipment Class
Air System Type
_AHU-1
SPLT AHU
_ SZCAV
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM Sum of space airflow rates
Space CFM Individual peak space loads
Central Cooling Coil Sizing Data
Total coil load
0.8
Total coil load
10.1
Sensible coil load
9.6
Coil CFM at Jun 0900
447
Max block CFM
447
Sum of peak zone CFM
447
Sensible heat ratio
0.954
ftz/fon
169.7
BTU/(hr-ftz) _
70.7
Water flow @ 10.0 •F rise
N/A
Number of zones 1
Floor Area 143.0 ftz
Location West Palm Beach, Florida
Calculation Months Jan to Dec
Sizing Data Calculated
Tons
Load occurs at
Jun 0900
MBH
OA DB / WB
80.7 / 75.6
°F
MBH
Entering DB / WB
76.1 / 62.7
•F
CFM
Leaving DB / WB
56.2 / 54.9
•F
CFM
Coil ADP
53.9
•F
CFM
Bypass Factor
0.100
Resulting RH
46
%
Design supply temp.
55.0
°F
Zone T-stat Check
1 of 1
OK
Max zone temperature deviation
0.0
•F
Central Heating Coil Sizing Data
Max coil load 3.6 MBH
Coil CFM at Des Htg 447 CFM
Max coil CFM 447 CFM
Water flow @ 20.0 °F drop N/A
Supply Fan Sizing Data
Actual max CFM
Standard CFM
Actual max CFM/ftz
Outdoor Ventilation Air Data
Design airflow CFM
CFM/ftz
.447 CFM
.447 CFM
3.13 CFM/ftz
-11 CFM
0.08 CFM/ftz
Load occurs at
BTU/(hr-ftz) _
Ent. DB / Lvg DB
—Des Htg
24.3
68.6 / 75.8 •F
Fan motor BHP 0.03 BHP
Fan motor kW 0.02 kW
Fan static 0.25 in wg
CFM/person
0.00 CFM/person
J - O a
0
6 7
s : o
0;<% '••FcOR10•• : e�
0
0
/0NA 4 � `%
Hourly Analysis Program v4.60 Page 1 of 1
q -
y Florida Energy Efflciency-CodeFor Building Construction
EnergyGauge Summit® Fla/Com-2010, Effective Date: March 15,"2012.=- Form 606-2010
Total Building;Performance Method for Commercial Buildings
PROJECT SUMMARY
Short Desc:
Seal Museum
Description:
National Navy UDT Seal Mu
Owner:
Navy
Addressl:
3300 NORTH HIGHWAY AIA
City:
FORT PIERCE
Address2:
State:
FL
Zip:
34949
Type:
Museum
Class:
Addition to existing Building
Jurisdiction:
FORT PIERCE, ST LUCIE COUNTY, FL (661100)
Conditioned Area:
145 SF
Conditioned & UnConditioned Area:
145 SF
No of Stories:
1
Area entered from Plans
143 SF
Permit No:
0
Max Tonnage
0.8
If different, write in:
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014
Page 1 of 7
Compliance Summary
Component Design Criteria Result
Gross Energy Cost (in $) 39.0 105.0 PASSED
LIGHTING CONTROLS PASSES
EXTERNAL LIGHTING None Entered
HVAC SYSTEM PASSES
PLANT None Entered
WATER HEATING SYSTEMS None Entered
PIPING SYSTEMS None Entered
Met all required compliance from Check List? Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
� F m
O.
� � s 4U/��� o
:�� ••'•. �ORIO •.•
i�s�Ss/O►vo `
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014 Page 2 of 7
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Cade
Prepared By: , Gt/1 Building Official:
Date: ` I'! Date:
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (`) that the system design is in compliance with the Florida Energy
Efficiency Code
Architect: Reg No:
Electrical Designer: Reg No:
Lighting Designer: Reg No: D 7
Mechanical Designer: BRUCE M CIARLARIELLO, P,E Reg No:
Plumbing Designer: Reg No:
(`) Signature is required where Florida Law requires design to be performed by registered design
professionals.
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014
Page 3 of 7
Project: Seal Museum
Title: National Navy UDT-Seal Museum
Type: Museum
(WEA File: FL ST LUCIE CO INTL.tm3)
I Total
Building End Uses
1) Proposed 2) Baseline
2.50 8.30
$39 $131
ELECTRICITY(MBtu/kWh/$) 2.50
732
$39
8.30
2427 .
$131
AREA LIGHTS 0.50
2.00
147
577
$8
$31
MISC EQUIPMT 0.70
0.70
212
212
$11
$11
PUMPS & MISC 0.10
0.10
27
23
$1
$1
SPACE COOL 1.00
2.20
298
636
$16
$34
SPACE HEAT 0.00 0.60
0 174
$0 $9
VENT FANS
Credits Applied: None
Passing Criteria =105
Design (including any credits) = 39
Passing requires Proposed Building cost to be at most 80% of
Baseline cost. This Proposed Building is at 29.8%
0.20 2.70
48 805
$3 $43
PASSES
EnergyGauge Summit® Fla/Com-2010, Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014 Page 4 of 7
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
None
Project: Seal Museum
Title: National Navy UDT-Seal Museum
Type: Museum
(WEA File: FL ST LUCIE CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae Description Area Design Min Compli-
ID (sq.ft) CP CP ante
ENTRY 12 Lobby (General) - Reception and 145 1 1 PASSES
Waiting
PASSES
Project: Seal Museum
Title: National Navy UDT-Seal Museum
Type: Museum
(WEA File: FL ST LUCIE CO INTL.tm3)
System Report Compliance
AHU-1 AHU-1 Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr I
Component Category Capacity Design Eff Design IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System Air Conditioners Air Cooled 13.50 12.23 8.00 PASSES
Split System < 65000 Btu/h
Cooling Capacity
Air Handling Air Handler (Supply) - 0.11 0.82 PASSES
System -Supply Constant Volume
PASSES
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014
Page 5 of 7
Plant Compliance
Description Installed Size Design Min Design Min
No Eff Eff IPLV IPLV
Category
Comp
liance
None
Water Heater Compliance
Description Type Category Design Min Design Max Comp
Eff Eff Loss Loss liance
None
Piping System Compliance
Category Pipe Dia Is Operating Ins Cond
[inches] Runout? Temp [Btu-in/hr
[F] SF.F]
Ins Req Ins Compliance
Thick [in] Thick [in]
None
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014 Page 6 of 7
Project: Seal Museum
Title: National Nary UDT-Seal Museum
Type: Museum
(WEA File: FL_ST_LUCIE_C0_INTL.tm3)
Other Required Compliance
Category
Section
Requirement (write N/A in box if not applicable)
Report
506.4.2
Input Report Print -Out from EnergyGauge F1aCom attached
Operations Manual
303.3.1,
Operations manual provided to owner
503.2.9.3,
505.7.4.2
Windows & Doors
502.3.2
Glazed swinging entrance & revolving doors: max. 1.0 cfm/ftl; all
other products: 0.3 cfm/ftz
Joints/Cracks
502.3.3
To be caulked, gasketed, weather-stripped or otherwise sealed
Dropped Ceiling Cavity
502.3
Vented: seal & insulated ceiling. Unvented seal & insulate roof &
side walls
HVAC Efficiency
503.2.3
Minimum efficiencies: Tables 503.2.3(1)-(8)
HVAC Controls
503.2.4
Zone controls prevent reheat (exceptions); separate thermostatic
control per zone;
Ventilation
503.2.5
Outdoor air supply & exhaust ducts shall have dampers that
automatically shut when systems or spaces served are not in use.
Exhaust air energy recovery required for cooling systems
(Exceptions).
ADS
503.2.7.5
Duct sizing and Design have been performed
HVAC Ducts
503.2.7
Air ducts, fittings, mechanical equipment & plenum chambers shall
be mechanically attached, sealed, insulated & installed per Table
503.2.7.2. Fan power limitations.
Balancing
503.2.9.1
HVAC distribution system(s) tested & balanced. Report in
construction documents.
Piping Insulation
503.2.8
HAC and service hot water. In accordance with Table 503.2.8.
Water Heaters
504
Performance requirements in accordance with Table 504.2. Heat
trap required.
Swimming Pools
504.7
Vapor -retardant or liquid cover or other means proven to reduce
heat loss on heated pools; Time switch (exceptions); readily
accessible on/off switch.
Motors
505.7.5
Motor efficiency criteria have been met
Lighting Controls
505.2, 502.3
Automatic control required for interior lighting in buildings >5,000
s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or
3 linear fluorescent lamps>30W
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
10/15/2014
Check
Page 7 of 7
Project Name: Seal Museum
Project Title: National Navy UDT--Seal Museum
Address: 3300 NORTH HIGHWAY AIA
State: FL
Zip: 34949
Owner: Navy
EnergyGauge Summit® v4.10
INPUT DATA REPORT
Project Information
Orientation: North
Building Type: Museum
Building Classification: Addition to existing Building
No.of Stories: I
GrossArea: 145 SF
Zones
No Acronym Description Type
Area
[stj
Multiplier
Total Area
f st]
I ENTRY ENTRY CONDITIONED
145.0
1
145.0
Spaces
No Acronym Description Type Depth
[ft]
Width Height Multi
fft] [ft] plier
Total Area
1st]
Total Volume
1ct]
10/1512014 EnergyGauge Sumnrit® v4.10 1
[n Zone: ENTRY
1 ENTRY. ENTRY Lobby (General) -.Reception 10.00 14.50 12.00 1 145.0 1740.0 :❑
and Waiting
Lighting
No
Type Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[W]
Ctrl pts
In Zone: ENTRY
In Space: ENTRY
1
Compact Fluorescent General Lighting
3
16
48
Manual On/Off
1 ❑
2
Compact Fluorescent Exit Sign
1
5 5
Manual On/Off
1
Walls
No Description
Type Width
H (Effec) Multi
Area
Direction Conductance Heat
Dens. R-Value
[ft]
[ft] plier
[sf]
[Btu/hr. sf. F] Capacity
[lb/cf] [h.sf.F/Btu]
[Btu/sf.F]
In Zone: ENTRY
1 WALL
0.75 in. stucco, 14.50
12.00 1
174.0
NorthEast
0.0838 11.224
50.24 11.9 ❑
2"styro,8"CMU,lx2
x24"oc,airspace,0.5" .
gyp
Windows
No
Description Type Shaded U SHGC Vis.Tra
W
H (Effec) Multi
Total Area
[Btu/hr sf F]
IN
IN plier
[sf]
In Zone:
In Wall:
El
10/15/2014
EnergyGauge Summit@ v4.10
2
Doors
No Description
Type
Shaded?
Width H (Effec)
Multi
Area
Cond.
Dens. Heat Cap. R-Value
[ft] [ft]
plier
[sf]
[Btulhr. sf. F]
[lb/cf] [Btu/sf. F] [h.sf.FBtu]
In Zone: ENTRY
In Wall: WALL
1 DOOR
Solid core flush
No
7.00 3.00
2
21.0
0.3504
0.00
0.00 2.85
❑
(2.25)
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond.
Heat Cap
Dens. R-Value
[ft]
[ft] plier
[sf]
[deg]
[Btu/hr. Sf. F]
[Btu/sf. F]
[lb/cf] [h.sf.F/Btu]
In Zone: ENTRY
1 ROOF
Mtl Bldg Roof/R-19
14.50
10.00 1
145.0
0.00
0.0492
1.34
9.49 20.3
❑
Batt
Skylights
No Description Type
U SHGC Vis.Trans
W
H (Effec) Multiplier
Area Total Area
[Btu/hr sf F]
[ft]
[ft]
[Sf] [Sf]
In Zone:
In Roof:
Floors
No Description
Type
Width
H (Effec) Multi
Area
Cond. Heat Cap. Dens.
R-Value
[ft]
[ft] plier
[sf]
[Btu/hr. sf. F] [Btu/sf. F] [lb/cf]
[h.sf.F/Btu]
In Zone: ENTRY
1 FLOOR
1 ft. soil, concrete
14.50
10.00 1
145.0 0.2681 34.00
113.33
3.73
❑
floor, carpet and
rubber pad
10/15/2014 EnergyGauge Summit® v4.10 3
Systems
AE11J-1 AI1U-1
Constant Volume Air Cooled Split
System < 65000 Btu/hr
No. Of Units 1
Component Category
Capacity Efficiency IPLV
1 Cooling System
2 Air Handling System -Supply
10100.00 13.50 5.00
450.00 0.11
❑
❑
Plant
Equipment
Category Size Inst.No Eff.
IPLV
Water Heaters
W-Heater Description
Capacity Cap.Unit UP Rt. Efficiency
Loss
Ext-Lighting
Description Category No. of Watts per
Luminaires Luminaire
Area/Len/No. of units
[sf/fVNo]
Control Type Wattage
[W]
Piping
No Type Operating Insulation
Temperature Conductivity
[F] ( Btu-in/h.sf.F]
Nomonal pipe
Diameter
[in]
Insulation Is Runout?
Thickness
[in]
. 10/1k014 EnergyGauge Summit® v4.10
4
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Conductance
Panes [Btu/h.sf.F]
Materials Used
Only R-Value
RValue
Thickness
Conductivity
Density
SpecificHeat
Mat No
Acronym
Description
Used
[h.sf.FBtu]
[ft]
[Btu/h.ft.F]
[ib/ct]
]Btu/ib.F]
187
Matl187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
BOARD,1/2IN
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265 .
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Mat148
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
267
Mat1267
0.75" stucco
No
0.1563
0.0625
0.4000
16.00
0.2000
❑
215
Mat1215
POLYSTYRENE, EXP., 2IN,
No
8.3350
0.1667
0.0200
1.80
0.2900
❑
105
Mat1105
CONC BLK HW, 8IN,
No
1.1002
0.6667
0.6060
69.00
0.2000
❑
HOLLOW
256
Mat1256
WOOD, SOFT, 1-1/21N
No
1.8939
0.1250
0.0660
32.00
0.3300
❑
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
94
Matl94
BUILT-UP ROOFING, 3/8IN
No
0.3366
0.0313
0.0930
70.00
0.3500
❑
Constructs Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/h.sf.F]
[Btu/sf.F]
[lb/cf]
[h.sf.F/Btu]
1010
0.75 in. stucco,
No
No
0.08
11.22
50.24
11.9
❑
2"styro,8"CMU, lx2x24"oc,airspace,0.5"gyp
10/15/2014
EnergyGauge Summit® v4.10
5
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
267
0.75" stucco
0.0625
0.000
❑
2
187
GYP OR PLAS BOARD,1/2IN
0.0417
0.000
❑
3
215
POLYSTYRENE, EXP., 2IN,
0.1667
0.000
❑
4
105
CONC BLK HW, 8IN, HOLLOW
0.6667
0.000
❑
5
256
WOOD, SOFT, 1-1/21N
0.1250
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No Name
Construct
Construct
[Btu/h.sf.F]
[Btu/sf.F]
[lb/ct]
[h.sf.F/Btu]
1047 Mtl Bldg Roof/R-19 Batt
No
No
0.05
1.34
9.49
20.3
❑
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
94
BUILT-UP ROOFING, 3/8IN
0.0313
0.000
❑
2
23
6 in. Insulation
0.5000
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No Name
Construct
Construct
[Btu/h.sf.F]
[Btu/sf.F]
[Ib/ct]
[h.sf.FBtu]
1057 1 ft. soil, concrete floor, carpet and rubber pad No
No
0.27
34.00
113.33
3.7
❑
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
265
Soil, 1 ft
1.0000
0.000
❑
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
178
CARPET W/RUBBER PAD
0.000
❑
10/15/2014 EnergyGauge Summit® v4.10 6
Simple Massless Conductance Heat Capacity Density RValue
No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.FBtu]
1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑
Layer Material Material Thickness Framing
No. [ft] Factor
1 279 Solid core flush (2.25") 0.000 ❑
10/15/2014 EnergyGauge Summit® v4.10 7 '