Loading...
HomeMy WebLinkAboutLetter BMC Consulting- OA Duct DamperNational NAVY Seal Museum Entrance — OA Duct Damper December 3, 2014 Richard Ahrens President AHRENS Companies P: 1-561-863-9004 1461 Kinetic Road Lake Park, FL 33403-1911 C:1-561-909-8543 F: 1-561-863-9007 E: rahrens@ahrenscompanies.com For: National Navy Seal Museum — OA Duct Damper Dear: Richard Ahrens, This letter is being written to'address the operable damper in the outside air duct, which is required per the Florida Energy Code 2010. Section 503.2.4.4 of the Florida Energy Code indicates the following: Shutoff damper controls. Both outdoor air supply and exhaust ducts shall be equipped with dampers that will automatically shut when the systems or spaces served are not in use. In order to meet the intent of the code section indicated above, BMC Consulting, would seek to meet the intent of the code (identified above) by incorporating a "Back Draft Damper" (BDD) within the outside air intake duct in lieu of a motorized damper. The BDD would close automatically via gravity when the HVAC system is shut down. Any questions, please feel free to contact BMC Consulting, LLC at 1-561-644- 1329 Sincerely, BRUCE M CIARLARIELLO, P.E., CMR, LEED AP, CXA PRESIDENT BMC CONSULTING, LLC �14 0 pC>,c.'••...c OR10,,.• BMC Consulting, LLC (CA-29409) 8297 Rosalie Ln, Wellington, FL 33414 — Phone:1-561-644-1329 — Fax: 1-561-296-5260 E-mail: bruce@bmcconsultinellc.com website: www.bmcconsultinglic.com Air System Sizing Summary for AHU-1 I Project Name: NATIONAL NAVY UDT-SEAL MUSEUM 10/15/2014 Prepared by: BMC Consulting, LLC 09:16PM Air System Information Air System Name Equipment Class Air System Type _AHU-1 SPLT AHU _ SZCAV Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Central Cooling Coil Sizing Data Total coil load 0.8 Total coil load 10.1 Sensible coil load 9.6 Coil CFM at Jun 0900 447 Max block CFM 447 Sum of peak zone CFM 447 Sensible heat ratio 0.954 ftz/fon 169.7 BTU/(hr-ftz) _ 70.7 Water flow @ 10.0 •F rise N/A Number of zones 1 Floor Area 143.0 ftz Location West Palm Beach, Florida Calculation Months Jan to Dec Sizing Data Calculated Tons Load occurs at Jun 0900 MBH OA DB / WB 80.7 / 75.6 °F MBH Entering DB / WB 76.1 / 62.7 •F CFM Leaving DB / WB 56.2 / 54.9 •F CFM Coil ADP 53.9 •F CFM Bypass Factor 0.100 Resulting RH 46 % Design supply temp. 55.0 °F Zone T-stat Check 1 of 1 OK Max zone temperature deviation 0.0 •F Central Heating Coil Sizing Data Max coil load 3.6 MBH Coil CFM at Des Htg 447 CFM Max coil CFM 447 CFM Water flow @ 20.0 °F drop N/A Supply Fan Sizing Data Actual max CFM Standard CFM Actual max CFM/ftz Outdoor Ventilation Air Data Design airflow CFM CFM/ftz .447 CFM .447 CFM 3.13 CFM/ftz -11 CFM 0.08 CFM/ftz Load occurs at BTU/(hr-ftz) _ Ent. DB / Lvg DB —Des Htg 24.3 68.6 / 75.8 •F Fan motor BHP 0.03 BHP Fan motor kW 0.02 kW Fan static 0.25 in wg CFM/person 0.00 CFM/person J - O a 0 6 7 s : o 0;<% '••FcOR10•• : e� 0 0 /0NA 4 � `% Hourly Analysis Program v4.60 Page 1 of 1 q - y Florida Energy Efflciency-CodeFor Building Construction EnergyGauge Summit® Fla/Com-2010, Effective Date: March 15,"2012.=- Form 606-2010 Total Building;Performance Method for Commercial Buildings PROJECT SUMMARY Short Desc: Seal Museum Description: National Navy UDT Seal Mu Owner: Navy Addressl: 3300 NORTH HIGHWAY AIA City: FORT PIERCE Address2: State: FL Zip: 34949 Type: Museum Class: Addition to existing Building Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 145 SF Conditioned & UnConditioned Area: 145 SF No of Stories: 1 Area entered from Plans 143 SF Permit No: 0 Max Tonnage 0.8 If different, write in: EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 1 of 7 Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 39.0 105.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING None Entered HVAC SYSTEM PASSES PLANT None Entered WATER HEATING SYSTEMS None Entered PIPING SYSTEMS None Entered Met all required compliance from Check List? Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report � F m O. � � s 4U/��� o :�� ••'•. �ORIO •.• i�s�Ss/O►vo ` EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 2 of 7 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Cade Prepared By: , Gt/1 Building Official: Date: ` I'! Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (`) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: D 7 Mechanical Designer: BRUCE M CIARLARIELLO, P,E Reg No: Plumbing Designer: Reg No: (`) Signature is required where Florida Law requires design to be performed by registered design professionals. EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 3 of 7 Project: Seal Museum Title: National Navy UDT-Seal Museum Type: Museum (WEA File: FL ST LUCIE CO INTL.tm3) I Total Building End Uses 1) Proposed 2) Baseline 2.50 8.30 $39 $131 ELECTRICITY(MBtu/kWh/$) 2.50 732 $39 8.30 2427 . $131 AREA LIGHTS 0.50 2.00 147 577 $8 $31 MISC EQUIPMT 0.70 0.70 212 212 $11 $11 PUMPS & MISC 0.10 0.10 27 23 $1 $1 SPACE COOL 1.00 2.20 298 636 $16 $34 SPACE HEAT 0.00 0.60 0 174 $0 $9 VENT FANS Credits Applied: None Passing Criteria =105 Design (including any credits) = 39 Passing requires Proposed Building cost to be at most 80% of Baseline cost. This Proposed Building is at 29.8% 0.20 2.70 48 805 $3 $43 PASSES EnergyGauge Summit® Fla/Com-2010, Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 4 of 7 External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) None Project: Seal Museum Title: National Navy UDT-Seal Museum Type: Museum (WEA File: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ante ENTRY 12 Lobby (General) - Reception and 145 1 1 PASSES Waiting PASSES Project: Seal Museum Title: National Navy UDT-Seal Museum Type: Museum (WEA File: FL ST LUCIE CO INTL.tm3) System Report Compliance AHU-1 AHU-1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 13.50 12.23 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Air Handling Air Handler (Supply) - 0.11 0.82 PASSES System -Supply Constant Volume PASSES EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 5 of 7 Plant Compliance Description Installed Size Design Min Design Min No Eff Eff IPLV IPLV Category Comp liance None Water Heater Compliance Description Type Category Design Min Design Max Comp Eff Eff Loss Loss liance None Piping System Compliance Category Pipe Dia Is Operating Ins Cond [inches] Runout? Temp [Btu-in/hr [F] SF.F] Ins Req Ins Compliance Thick [in] Thick [in] None EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Page 6 of 7 Project: Seal Museum Title: National Nary UDT-Seal Museum Type: Museum (WEA File: FL_ST_LUCIE_C0_INTL.tm3) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Report 506.4.2 Input Report Print -Out from EnergyGauge F1aCom attached Operations Manual 303.3.1, Operations manual provided to owner 503.2.9.3, 505.7.4.2 Windows & Doors 502.3.2 Glazed swinging entrance & revolving doors: max. 1.0 cfm/ftl; all other products: 0.3 cfm/ftz Joints/Cracks 502.3.3 To be caulked, gasketed, weather-stripped or otherwise sealed Dropped Ceiling Cavity 502.3 Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Efficiency 503.2.3 Minimum efficiencies: Tables 503.2.3(1)-(8) HVAC Controls 503.2.4 Zone controls prevent reheat (exceptions); separate thermostatic control per zone; Ventilation 503.2.5 Outdoor air supply & exhaust ducts shall have dampers that automatically shut when systems or spaces served are not in use. Exhaust air energy recovery required for cooling systems (Exceptions). ADS 503.2.7.5 Duct sizing and Design have been performed HVAC Ducts 503.2.7 Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Table 503.2.7.2. Fan power limitations. Balancing 503.2.9.1 HVAC distribution system(s) tested & balanced. Report in construction documents. Piping Insulation 503.2.8 HAC and service hot water. In accordance with Table 503.2.8. Water Heaters 504 Performance requirements in accordance with Table 504.2. Heat trap required. Swimming Pools 504.7 Vapor -retardant or liquid cover or other means proven to reduce heat loss on heated pools; Time switch (exceptions); readily accessible on/off switch. Motors 505.7.5 Motor efficiency criteria have been met Lighting Controls 505.2, 502.3 Automatic control required for interior lighting in buildings >5,000 s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or 3 linear fluorescent lamps>30W EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012 10/15/2014 Check Page 7 of 7 Project Name: Seal Museum Project Title: National Navy UDT--Seal Museum Address: 3300 NORTH HIGHWAY AIA State: FL Zip: 34949 Owner: Navy EnergyGauge Summit® v4.10 INPUT DATA REPORT Project Information Orientation: North Building Type: Museum Building Classification: Addition to existing Building No.of Stories: I GrossArea: 145 SF Zones No Acronym Description Type Area [stj Multiplier Total Area f st] I ENTRY ENTRY CONDITIONED 145.0 1 145.0 Spaces No Acronym Description Type Depth [ft] Width Height Multi fft] [ft] plier Total Area 1st] Total Volume 1ct] 10/1512014 EnergyGauge Sumnrit® v4.10 1 [n Zone: ENTRY 1 ENTRY. ENTRY Lobby (General) -.Reception 10.00 14.50 12.00 1 145.0 1740.0 :❑ and Waiting Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pts In Zone: ENTRY In Space: ENTRY 1 Compact Fluorescent General Lighting 3 16 48 Manual On/Off 1 ❑ 2 Compact Fluorescent Exit Sign 1 5 5 Manual On/Off 1 Walls No Description Type Width H (Effec) Multi Area Direction Conductance Heat Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] Capacity [lb/cf] [h.sf.F/Btu] [Btu/sf.F] In Zone: ENTRY 1 WALL 0.75 in. stucco, 14.50 12.00 1 174.0 NorthEast 0.0838 11.224 50.24 11.9 ❑ 2"styro,8"CMU,lx2 x24"oc,airspace,0.5" . gyp Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] IN IN plier [sf] In Zone: In Wall: El 10/15/2014 EnergyGauge Summit@ v4.10 2 Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value [ft] [ft] plier [sf] [Btulhr. sf. F] [lb/cf] [Btu/sf. F] [h.sf.FBtu] In Zone: ENTRY In Wall: WALL 1 DOOR Solid core flush No 7.00 3.00 2 21.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [ft] [ft] plier [sf] [deg] [Btu/hr. Sf. F] [Btu/sf. F] [lb/cf] [h.sf.F/Btu] In Zone: ENTRY 1 ROOF Mtl Bldg Roof/R-19 14.50 10.00 1 145.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area [Btu/hr sf F] [ft] [ft] [Sf] [Sf] In Zone: In Roof: Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] [Btu/sf. F] [lb/cf] [h.sf.F/Btu] In Zone: ENTRY 1 FLOOR 1 ft. soil, concrete 14.50 10.00 1 145.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad 10/15/2014 EnergyGauge Summit® v4.10 3 Systems AE11J-1 AI1U-1 Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 1 Component Category Capacity Efficiency IPLV 1 Cooling System 2 Air Handling System -Supply 10100.00 13.50 5.00 450.00 0.11 ❑ ❑ Plant Equipment Category Size Inst.No Eff. IPLV Water Heaters W-Heater Description Capacity Cap.Unit UP Rt. Efficiency Loss Ext-Lighting Description Category No. of Watts per Luminaires Luminaire Area/Len/No. of units [sf/fVNo] Control Type Wattage [W] Piping No Type Operating Insulation Temperature Conductivity [F] ( Btu-in/h.sf.F] Nomonal pipe Diameter [in] Insulation Is Runout? Thickness [in] . 10/1k014 EnergyGauge Summit® v4.10 4 Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance Panes [Btu/h.sf.F] Materials Used Only R-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used [h.sf.FBtu] [ft] [Btu/h.ft.F] [ib/ct] ]Btu/ib.F] 187 Matl187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 . Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 267 Mat1267 0.75" stucco No 0.1563 0.0625 0.4000 16.00 0.2000 ❑ 215 Mat1215 POLYSTYRENE, EXP., 2IN, No 8.3350 0.1667 0.0200 1.80 0.2900 ❑ 105 Mat1105 CONC BLK HW, 8IN, No 1.1002 0.6667 0.6060 69.00 0.2000 ❑ HOLLOW 256 Mat1256 WOOD, SOFT, 1-1/21N No 1.8939 0.1250 0.0660 32.00 0.3300 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 94 Matl94 BUILT-UP ROOFING, 3/8IN No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1010 0.75 in. stucco, No No 0.08 11.22 50.24 11.9 ❑ 2"styro,8"CMU, lx2x24"oc,airspace,0.5"gyp 10/15/2014 EnergyGauge Summit® v4.10 5 Layer Material Material Thickness Framing No. [ft] Factor 1 267 0.75" stucco 0.0625 0.000 ❑ 2 187 GYP OR PLAS BOARD,1/2IN 0.0417 0.000 ❑ 3 215 POLYSTYRENE, EXP., 2IN, 0.1667 0.000 ❑ 4 105 CONC BLK HW, 8IN, HOLLOW 0.6667 0.000 ❑ 5 256 WOOD, SOFT, 1-1/21N 0.1250 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/ct] [h.sf.F/Btu] 1047 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/8IN 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [Ib/ct] [h.sf.FBtu] 1057 1 ft. soil, concrete floor, carpet and rubber pad No No 0.27 34.00 113.33 3.7 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ 10/15/2014 EnergyGauge Summit® v4.10 6 Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.FBtu] 1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 279 Solid core flush (2.25") 0.000 ❑ 10/15/2014 EnergyGauge Summit® v4.10 7 '