OLD BUILDING
OBSERVATION PLAN
ruse at the Reserve
St. Lucie, FL
SUMMARY ecial Inspector registered in the State; of
the Owner will employ a Sp
A In compliance with Florida Statues, al components of the PGA Clubhouse at the Reserve-
A.
Florida to observe construction of the S actor'
project consists of single story clubhouse addition*
SPECIAL INSPECTOR
2. RESPONSIBILITIES OF THEort his observation results
inspector will be responsible to the enforcement agency and willrep
A. The Special governing FlJ rida statutes.
in accordance with current g system complies
that the construction of the structural ermined plans,
B. The Special Inspector is responsible for observingare ntsl Observation Plan.
official Contract Documents. Officialamendments thee to, and this Structural defined
as e P
with the Off
addenda, and the specifications with all e Special Inspector utilizing
Inspect may representative to Perform the wor
entat. by education or
eCid �p use a rep resentative is qualified
C. The Sp insure the Authorized actor. The use of a representative shall be in
Authorized Representatives shall i ed the Special Insp p e of the work of the
licensure to perform the duties assign ecial Inspector shall be in res onsibllehc Special Inspector must
compliance with Florida Statutes. The JSviewing reports and spot checks. action program•
P including construction which he deems key to the inspection
Authorized Re resentative, in aired by the
personallyvisit the site at points during constru visit the project site as require
resentative will of the work. Further, it
Special Inspector or his Authorized Represelements during the progressconstruction of
D The to observe the �iarious structuralperiodic basis during
construction activity on a regular p
Special Inspector visit the project resentative shall be on site prior to each
is required that the Seca Special Inspector or his Authorized Racement•and periodically check method of
structural elements.
P c y of reinforcement p
concrete pour in order to confirm
placement on handling of concrete.
workmanship or other features of construction
ecial Insp of the official contract documents. Gmdehnes for observations covering
g .The Sp actor will report observations of materials,
deviating from the requirements
herein.
specific areas of construction are listed
required by the project
laboratory are req lament his
b an independent testing special inspector to supP
F. Qu�ty control inspections and. testing Y concrete testing and steel
aural elements and will be available to ; Soil te5�g,
specifications for somestru reports may include, but are not limited to;
own observations. ` h
connection testing. Special Inspector in no way relieves the Contractor of
al component by the documents.
G, The acceptance of any strucvvith the requirements of the contract
responsibility for complying , Suite 101
4337 Pablo Oaks
Jacksonville, Florida 32224
Ph: 904.992.0377
Mail0owestructures•com
H•
PGA Louse at the Reservc
page 2 of 6 .
decisions or. direct
ake any design roved contract
e resentative shall m the aPP undue
s Authorized R P An deviation u as to avert any er
ecial Inspector nor roved contract documents. a tamely m sector, no forth
er the Spfrom the approved Contractor in of the Special In P r they shall
Keithdeviateof the to the satisfactl ecial Inspect° '
on
the Contractor to t to theey deviation a satisfaction of Sp encY
documents shall be ected to th d the enforcing
cases. If the Contractor tort a not Corr eer of Record anre uiriiig
exp accessary* If the deviations ar al Engin limited to, q
c but not lim sing that the
aeon is n e attention of the Stru to include, a oxt and in
be brought to the se of a Site V !Sit R P lan-
titute quality assurance procedures by this p
shall n of relevant check lisro eet whenever so requiredand will
I The Special inspectoractivities
visits, iitlli r Isentative is at the p J observation Arcbitect of
unscheduled the Anthonzed ReP threshold building .
Inspector or maintain a written record Of official with copies to the Owner' or all of the
will s romptlY to the Building Individual
reportsmay include any
J. Spec' inspector ontrac
The SP signed and sealed report ecord and!
C
render sign al Engineer of R
Record, Stxuctur ogre
ort on cons ction PtO�
following.tru
l General rep ons. the site visit.
2. weather conditions.
Other persoimelpresent during ecific areas• oted. lemental data.
3. off reports on sp ieviously n er supp
4. Detailed check- sketches or oth with any specific
Reports of the corrections of e�fication, 31
reports shall comply having local
5' test reports, welders section other authority
6 Special eats noted City/Coanty� or any
e report content req�� ble, of the
In addition to where app the Sp sector
K• requirements , ecial Inspector
submissiondeficiencies, to Section 553.19
r the correction of all in aural Engineer
jurisdiction. al wgrk and of Building Official conforming S�
of all structural to the Architect of R
At the completion ed and sealed statement a Owner,
L' shall submit a sign ies willbe sent to the ector to only
a Florida Statues• 'Cop
on () it the Special InsP
Subsectl and Contractor' It does not lim covered.
of Record, en� � concern• Sped
and specific item must prevail on items not sp
Ian allows for general ,i .udgm
M This Pled. The Special Inspector J e
items CTOR dole of construction. shall
S1BII�xT�S OF T COIN current, a oche ,fie Contractor
Inspector, and keep ecial IasP
3, RESPOIv a Special Itisp s riot to the need for a anon by the Sp ector.
Ctor shall furnish th I ector 24 hour prior , to observation
A The Contra, tyre Special Insp eeding observation Pnoation.
11 notify work n d safe for obsery but are
Contractor shall or cover any available anThese reports include,
not place concrete make all areas ector.
t test reports
to the SpecialInsP
The ContraCtO1 shall
e Contractor shall Punish all relevan
B. The limited to:
not limi related to
l Soil tooting• roved submlttal
2•. Concrete testing- testing• a copy of each aPP struct►on Such subr itmis
3 Steel connection
e S ecial Inspector ing Proper con
Contractor shall Provide to
omP° eats for use in verify
C The COystems, materials to,e following
structuralbut are not limited
shall include,
including all revisions.
l Contract documents and test reSiilts ��wings
2. Concrete mix des . steel fabrication
3. Concrete reinforcing 1
Threshold Plan for
PGA Clubhouse at the Reserve
Page 3 of 6
4. Structural steel fabrication drawings.
5. Steel reinforcing for concrete masonry.
6. Concrete formwork, shoring and reshoring plans and calculations.
7. Light gauge metal framing fabrication drawings.
D. All submittals provided to the Special Inspector shall bear the stamp and initials of the Contractor and the
Architect or Engineer of Record. '
G
SPECIAL INSPECTOR'S OBSERVATIONS
The contract requirements for this project are contained in the Official Contract Documents. The following
guidelines should be used in conjunction with a careful study of the Official Contract Documents.
A. GENERAL
1. Review the Official Contract Documents to be sure that they are approved and available before the
start of any phase of the structural. work.
2. Review with the Contractor the construction procedure before the start of any phase of the structural
work to make sure that it accommodates the design.
3. Review with the Contractor the requirements as to the type of inspection and testing that is necessary
before the start of any phase of structural work. Confirm that the testing agency is using qualified,
personnel and completing all tests and inspections in a timely and professional manner.
4. After delivery to the job, observe structural members for compliance with the Official Contract
Documents, damage and flaws. Confirm that the structural members are being protected and stored
properly.
5. Verify that all tests, sampling or reports have been completed before finished work is covered and no
longer capable of being inspected or tested.
6. Confirm the repair and treatment of areas containing defective work.
B. FOUNDATIONS
1. Check to see that excavation, backfill and subsurface soil preparation is performed in accordance to the
Official Contract Documents. •
2. Verify that a qualified testing laboratory is performing density tests of soil beneath footings required
by the Official Contract Documents.
3. Prior to the placing of reinforcing in footings, confirm that the required density tests have been made.
4. Check the placement and size of anchor bolts and/or dowels.
Check size, spacing, number and clearance of reinforcing.
C. STRUCTURAL CONCRETE
General
1. • Verify that the location of all joints'such as expansion and contraction joints are as detailed on Official
Contract Documents or as otherwise approved.
2. Verify the location of all openings. Reinforcing should be as specified on Official Contract
Documents. Additional openings which are required should be approved by the designer.
3. Check that all structural embedded items are in place as shown on Official Contract Documents.
4. Before placement of concrete slab on grade, verify proper subsurface conditions, vapor barriers,
reinforcing and size and location and formwork for construction joints, including joint locations.
✓Forms
1. Before the placement of concrete, verify the location and dimension of forms.
2. Check that the rule of placement is within safe limits, such that the form will not be over stressed.
3. Ensure that concrete strength has adequately developed before removal of forms.
4. If oil is used as bond breaker, insure that oil is applied prior to reinforcing placement.
Y
Threshold Plan for
/ PGA Clubhouse at the Reserve
Page 4 of 6
Reinforcing
1. Verify that reinforcing is placed in accordance with approved shop drawings and latest Official
Contract Documents.
2. Record any deviation from drawings, such as additional steel.
3. Check that reinforcing is clean of loose, flaky rust and scale, grease or other foreign materials.
✓Concrete
1. The Special Inspector should be given at least 24 hours notice prior to the placement of any concrete.
2. Verify that all concrete delivered is of an approved mix design and adequate records are being
maintained by testing lab.
3. Verify that the method of placement of concrete will not cause segregation, is rapid enough to avoid
formation of cold joints, and includes proper vibration.
4. All concrete test results shall be carefully reviewed.
5. Verify that all reinforcing and formwork has been observed and all necessary corrections made before
placement of concrete.
6. Record amount of water added at job site. Check compliance with specifications.
7. Check cured concrete for honeycombing, verify repair in accordance with specifications.
D. " SHORING
1. Check conformance of shoring and I eshoring plan for, location, spacing, size, quality, and adequacy,
to support horizontal and vertical milembers.
2. Examine schedule and placement sequence of form, shoring and reshoring placement, and removal.
E. /MASONRY
General
1. Check that the type of masonry bloc
in good condition.
2. Check tie beams and tie columns fo
adjacent masonry as specified.
3. Insure that all reinforced masonry
horizontal reinforcing, grouted cell
documents.
4. Verify requirements for appropriate
5. Verify alignment of cells, cleanouts
6. Verify that samples are taken by tes
7. Verify conformance of grout slump
Check for cracked or weakened ma:
and mortar mix are as specified. Verify that all blocks used are
location and reinforcing. Insure that concrete is connected to the
constructed in accordance to contract documents. Verify that
dowels and embedded items, are in accordance to construction
nethod of construction.
grout mix and proper grouting procedures for grout filled cells.
ng company in compliance with specifications.,
uid mix designation with specifications and approved mix designs.
/Reinforcement
1. Verify dowel d vertical reinforcing is in the same cell, and their locations within cells.
2. Verify reinforcing grade, size and lap length.
3. Verify cells are clean and free of excess mortar and debris prior to grouting of cells.
F. STRUCTURAL STEEL
Pre -Construction
1. Review the Official Contract Documents and make sure all the drawings, specifications, shop
drawings, addenda, sketches are available and approved by design engineers.
2. Verify previous observations such as excavations and foundations for corrections indicated on the
correction check list.
3. Check anchor bolts for size, length, plutnbness, embedment and protrusion of threaded end nut
engagement.
E c 0
>uts* t9
Threshold Plan for
PGA Clubhouse at the Reserve
Page 5 of 6
General
1. Check a steel,on the job with the plans and specifications.
2. Check mill certifications and test reports.
3. Check grade on steel members, pipe, tubing and bolts for conformance with specifications.
4. Observe steel members for distortion, excessive rust, flaws; and burned holes.
5 Call for laboratory test reports when in doubt.
6. Check for camber in beams.
7. Check steel members for size, thick I ess and weight.
8. Check for dimensional tolerances.
9. Observe for surface finish galvanized or shop paint coat.
10. Check the columns for bearing surfaces, alignment, size,
✓bearing and embedment in masonry for concrete.
Welding
G.
adequate base plates, splice plates and
1. Verify testing lab inspection for size, spacing, type and location as per approved plans.
2. Insure all welders are certified.
3. Insure the base metal conforms to the specifications.
4. Verify welding rods for conformance to specifications.
5. Observe assembled materials before welding for rust, scabs, seams, scale, plate lamination, root
openings and proper edge preparation.
6. Verify testing of welds as specified by a testing lab.
7. Review the reports by testing lab and insure the repair of inadequate welds. Testing lab shall perform
the following:
I -
a. Insure that welds are clean and free from slag.
b. Check for rust protection of welds as per specifications.
c. Check for dimensional defects for sizes, shapes, warpage and joint preparation as per approved
drawings and specifications.
d. Inspect for voids resulting from improper chemical reaction.
e. Check for cavities and incomplete penetration.
f. Check for imperfect fusion and (undercutting.
g.- Inspect for any non-metallic solids trapped in the weld.
h. Inspect for weld cracks and craters.
i. Inspect for surface holes and other surface irregularities.
j. Insure that defective welds are clearly marked and have been repaired.
PRE-ENGINEERED WOOD OR LIGHT GAGE METAL TRUSSES
General A
1. Check that the spacing of trusses conforms to the structural and approved shop drawings.
2. Check that the permanent bracing conforms to the approved engineered shop drawings.
3. Check that the truss tie -down types are as specified, the attachments are complete and conform to the
contract documents and approved engineered shop drawings.
4. Verify truss -to -truss connections conform with the approved engineered shop drawings.
5. Verify that the roof decking thickness and attachments conform, to the construction documents and
approved engineered shop drawings.
H. WOOD
General
1. Verify member sizes, grades, spacing, etc are as detailed on official contract documents or as otherwise
approved.
2. Verify nailing, strapping and other connections area as detailed on the contract documents or as
otherwise approved.
3. Verify pressure treatment, fire retardant, etc. has been provided for members as detailed on the official
contract documents or as otherwise approved
Threshold Plan for
PGA Clubhouse at the Reserve
Page 6 of 6
I. LIGHT GAGE METAL FRAMING
1
Genera
1. Check that installation of light gage metal, load bearing walls, wall studs, miscellaneous load bearing
metal stud structural elements, and all connections of these elements conform to the contract
documents and the specialty engineers' approved shop drawings.
2. Check that the spacing of framing in conforms to the structural and approved shop drawings.
3. Check that the permanent bracing conforms to the approved engineered shop drawings.
4 Check that the member tie down types are as specified, the attachments are complete and conform to
the approved engineered shop drawing
J. WINDOW/CURTAIN WALLS AND EXT
General
1. Verify window/curtain wall system
2. Verify that the installation of wall s
the approved shop drawings.
LIGHT GAGE FRAMING
all connections conform to the approved shop drawings.
including member size, spacing and connections conform to
FIF-10LE