Loading...
HomeMy WebLinkAboutPV Plans Stamped PHOTOVOLTAIC SYSTEM CODES: CONSTRUCTION NOTES: THIS PROJECT COMPLIES WITH THE FOLLOWING: 2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND Digitally 2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. Jose psigned by 2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENT Joseph J 2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING POSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY ARE h J Bravo Date: 2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS MOUNTED. 2022.01.31 2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION IN Bravo 10:12:51 2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING ACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PER -07'00' 2020 7TH EDITION FLORIDA BUILDING CODE:ACCESSIBILITY SECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD. 2020 7TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA) 2017 NATIONAL ELECTRIC CODE (NEC) DIG ALERT(811)TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANY AS ADOPTED BY ST. LUCIE COUNTY EXCAVATION TAKING PLACE PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A). SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH VICINITY MAP: REQUIREMENTS OF ART. 690 OF THE 2017 NEC THE MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFER UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM °°" °�B1rd hB1 SOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY)AND UL 1741 STANDARDS CLIENT: r a CHRISTOPHER ROOTE INSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK. EMT CONDUIT 8803 BROOKLINE AVENUE,FORT PIERCE, ATTACHED TO THE ROOF USING CONDUIT MOUNT. FL 34951 AHJ:ST.LUCIE COUNTY o k`"•ee•, UTILITY:FPL-FLORIDA POWER&LIGHT • Pe•eai"e a° eeiae PHONE:(772)240-8945 8803 Bronkine Ave, erawiine n"e on Pleroe,FL 34951 SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW _ SYSTEM SIZE(AC):15.200 kW @ 240V n MODULES:65 X HANWHA QCELL:Q.PEAK m oi•a "°sesoi"a r�°n°ni�ena DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM [Sill A1A1° o." INVERTER 2:SOLAREDGE SE380OH-USRGM x [Sill SITE LOCATION TABLE OF CONTENTS: PV-1 SITE LOCATION REVISIONS PV-2 SITE PLAN NO. REVISED BY DATE PV-2A ROOF PLAN WITH MODULES LAYOUT PV-2B STRUCTURAL CALCULATIONS PV-3 MOUNTING DETAILS freedom PV-4 THREE LINE DIAGRAM F O R E V E R PV-5 CONDUCTOR CALCULATIONS FREEDOM FOREVERLLC 2619 CONSULATE DR SUITE 800,ORLANDO, PV-6 EQUIPMENT&SERVICE LIST FL 32819 Tel:(800)385-1075 PV-7 LABELS GREG ALBRIGHT PV-7A SITE PLACARD 'r PV-8 OPTIMIZER CHART (�U� PV-9 SAFETY PLAN CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR PV-10 SAFETY PLAN EC13008056 APPENDIX MANUFACTURER SPECIFICATION SHEETS SITE LOCATION JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-1 LEGEND: BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10' THIS SYSTEM DESIGNED WITH: WIND SPEED: 156 OBSTRUCTION WIND EXPOSURE: C BROOKLINE AVENUE PIPE VENT a MODULES (N)65 HANWHA QCELL: Q.PEAK DUO PROPERTY LINE BLK-G6+/SC 340W CONDUIT 177'-4" ® SETBACK Ac FUSED AC DISCONNECT MsP MSP PB3 JUNCTION BOX o INV INVERTER Ln UM UTILITY DRIVEWAY METER ROOF AREA:2778 SO FT LC LOAD CLIENT: FL c CENTER CHRISTOPHER ROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, FL 34951 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT 34'-0" PHONE:(772)240-8945 76'-8" C? o M M LO LO PV SYSTEM YSTEM: 22.100 kW-DC SYSTEM SIZE(DC):65 X 340=22.100 kW ROOF LINE SYSTEM SIZE(AC):15.200 kW @ 240V 15.200 kW-AC MODULES:65 X HANWHA QCELL:Q.PEAK El OPTOIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM (E) DETACHED GARAGE [Sill INVERTER 2:SOLAREDGE SE3800H-USRGM [Sill 6) L REVISIONS NO. REVISED BY DATE 0 freedom (E) PATIO COVER FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, 186'-6" FL 32819 (E) MAIN SERVICE PANEL Tel:(800)385-1075 INSIDE HOUSE (N)SOLAREDGE SE1140OH-USRGM [S11] GREGALBRIGHT (E) UTILITY METER INVERTER WITH RAPID SHUTDOWN (N) SOLAREDGE SE380OH-USRGM [S11] "" 7 (N) UTILITY FUSED DISCONNECT EATON CONTRACTOR DG223NRB (OR EQUIVALENT) CERTIFIED ELLEC RICALICONTRACTOR (N) LOAD CENTER (E)SHED EC13008056 SITE PLAN 1 SCALE: 1"-251 SITE PLAN rFol B NO: DATE: DESIGNED BY: SHEET: 20561 1/27/2022 C.A. PV-2 LEGEND: BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10' CHIMNEY THIS SYSTEM DESIGNED WITH: PIPE VENT WIND SPEED: 156 WIND EXPOSURE: C ATTACHMENTS S. M. Mehdi igitallysignedbyS. Mehdi Zomorodian MODULES Zomorodian pate:1022.01.31 (N)65 HANWHA QCELL: Q.PEAK DUO 5:15:26-06'00' — RAFTERS BLK-G6+/SC 340W 2"X 4"TRUSSES @ 24"O.0 RAIL FIRE ACCESS ® SETBACK PATHWAYS AC FUSED AC DISCONNECT MS P MSP JEs JUNCTION BOX M ROOF AREA:2778 SO FT PM PRODUCTION CLIENT: METER CHRISTOPHER ROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, INV INVERTER FL 34951 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT unn UTILITY METER 3'FSB PHONE:(772)240-8945 3'FSB L_c LOAD CENTER LJ SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V MODULES:65 X HANWHA QCELL:Q.PEAK m m DUO BLK-G6+/SC 340W EL OPTIMIZERS:65 X SOLAREDGE P340 PV SYSTEM M INVERTER 1:SOLAREDGE SE1140OH-USRGM [Sill 22.100 kW-DC INVERTER 2:SOLAREDGE SE380OH-USRGM 15.200 kW-AC [Sill JB MSP UM AC LC INV INV REVISIONS NO. REVISED BY DATE FIRE ACCESS PATHWAYS (N)SOLAREDGE SE11400H-USRGM [S11] INVERTER .Q, freedom (N) SOLAREDGE SE380OH-USRGM [S11] F O R E V E R INVERTER FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG A�LhB�RIIG�HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 ROOF PLAN NOTES: 1. EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNTS SCALE: 1/8" = V-0" 2. ATTACHED CLAMPS AT 25% FROM THE EDGE AND 50% FROM THE CENTER OF THE MODULES ROOF PLAN WITH MODULES LAYOUT 3. JUNCTION BOX IS MOUNTED TO THE RAIL. JOB NO: DATE: DESIGNED BY: SHEET: F120561F /27/2022 C.A. PV-2A ROOF DETAILS: TOTAL ROOF AREA: 2778 SQ FT ARRAY COVERAGE: 45.21% SYSTEM DISTRIBUTED WEIGHT: 2.45 LBS S-5!: PROTEA POINT-LOAD: 19.63 LBS ROOF AREA STATEMENT CLIENT: CHRISTOPHER ROOTE ROOF MODULE QUANTITY ROOF PITCH ARRAY PITCH AZIMUTH ROOF AREA ARRAY AREA 8803 BROOKLINE AVENUE,FORT PIERCE, FL 34951 1 32 18° 18' 181° 1215 SQ FT 618.24 SQ FT AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT 2 33 180 180 10 1215 SQ FT 637.56 SQ FT PHONE:(772)240-8945 SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V MODULES:65 X HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM [Sill INVERTER 2:SOLAREDGE SE380OH-USRGM [Sill REVISIONS NO. REVISED BY DATE . . freedom C' FOR E V ER FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG A�LhB�RIIGI HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 ROOF DETAILS JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-2B (N)HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W UNIRAC SM LIGHT RAIL RACKING SYSTEM ROOF ATTACHMENT Mill IIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIII � � � � � � III III IIIIIII IIII III II = III I T I I T I I T I I T I T I IIIIIIIIIIIIIIII � � � � � III III IIIIIII � IIII III I � IIIII III II � IIIIIIIIIIIIIIII � � � IIIIIIIIIIIIIIIIIIII III � IIII IIIIIIIIIII � � � IIIIIIIIIIIIIIIIIIII (E)METAL SEAMS CLIENT: O.C. CHRISTOPHER ROOTE 12 C 8803 BROOKLINE AVENUE,FORT PIERCE, FL 34951 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT PARTIAL ROOF FRAMING PLAN PHONE:(772)240-8945 Scale: NTS SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V MODULES:65 X HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM ISI1] INVERTER 2:SOLAREDGE SE380OH-USRGM (N) HANWHA QCELL: GROUNDING END/MID PROTEABRACKET [SI1] Q.PEAK DUO BLK-G6+/ CLAMP SC 340W UNIRAC SM LIGHT RAIL l 1 PROTEABRACKET ( ) C7 CCC777 REVISIONS NO. REVISED BY DATE (E)TRAPEZOIDAL METAL 1"SELF TAPPING SCREW (E)TRAPEZOIDAL METAL ROOF PROFILE ROOF PROFILE Qr freedom 2X4 TRUSS @ 24"O.C. FACTORY APPLIED F O R E V E R EPDM WITH STICKY ADHESIVE FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 SOLAR PV ARRAY SECTION VIEW ATTACHMENT DETAIL Scale: NTS Scale: NTS MOUNTING DETAILS rFO120561 B NO: DATE: DESIGNED BY: SHEET: 1/27/2022 C.A. PV-3 BACKFEED FUSE SIZING MAX. CONTINUOUS OUTPUT 63.50A @ 240V 63.50 X 1.25 = 79AMPS 80A FUSES -OK STRING-2 STRING-1 17 HANWHA QCELL:Q.PEAK DUO BLK-G6+ 17 HANWHA QCELL:Q.PEAK DUO BLK-G6+ /SC 340W /SC 340W SOLAREDGE P340 CLIENT: POWER OPTIMIZERS (E)200A RATED CHRISTOPHER ROOTE MAIN SERVICE PANEL 8803 BROOKLINE AVENUE,FORT PIERCE, 4-#10 AWG,THWN-2 1 PH,120/240V 60HZ FL 34951 r -- --- jDUO.LK-G6+ 1-#8 EGC,THWN-2 E 200A/2P MAININ 3/4'OR ( ) BREAKER METERITY AHJ:ST.LUCIE COUNTY LARGER EMT CONDUIT (END FED) UTILITY:FPL-FLORIDA POWER&LIGHT PHONE:(772)240-8945 2-#10 AWG,PV W IRE STRING-17 HANWHA QCELL:Q.PESOLAREDGE P340 /SC 340POWER OPTIMIZERS JUNCTION SYSTEM: BOX (N)SOLAREDGE SYSTEM SIZE(DC):65 X 340=22.100 kW SE1140OH-USRGM[SI1l SYSTEM SIZE(AC):15.200 kW @ 240V INVERTER • MODULES:65 X HANWHA QCELL:Q.PEAK E E E_____________ - I I WG,THWN-2 LISLINESIDETAPVIAULT I I j"3 (N)100A FUSEDLISTED CONNECTOR OPTOIMZERS+65 X SOLAREDGE P340 GC,THWN-2 AC DISCONNECTR LARGER EMT CONDUIT EATON DG223NRB(OR NVERTER 1:SOLAREDGE SE1140OH-USRGM AD DEDICATED EQUIVALENT) • INVERTER 2:SOLAREDGE SE380OH-USRGM OAD CENTER 2-80 AMP FUSESL---_---_ J I NI 2P TO UTILITY [SI1] • • UNDERGROUND 2-#10 AWG,PV L_ —_—_ ------ FEED 1-#6 AWG IN FREE AIR OR (N)20N2P IN #8 AWG MUST BE IN EMT CONDUIT RAPID 6-#10 AWG,THWN-2 SHUTDOWN I I SOLAREDGE P340 POWER 1-#8 EGC,THWN-2 SWITCH OPTIMIZERS IN3/4"OR 3-#4 AWG,THWN-2 3-#4 AWG,THWN-2 LARGER EMT CONDUIT 1-#8 EGC,THWN-2 IN 314"OR LARGER EMT CONDUIT STRING-4 IN 3/4"OR LARGER EMT CONDUIT 14 HANWHA QCELL:Q.PEAK DUO BLK-G6+ I /SC 340W I REVISIONS (N)SOLAREDGE I = NO. REVISED BY DATE SE380OH-USRGM[Sill - INVERTER I A TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDE AC I TAP IN THE MAIN SERVICE PANEL.THIS IS DEPENDENT UPON SITE CONDITIONS. °C freedom F O R E V E R —————— JUNCTION I FREEDOM FOREVER LLC L — BOX ------- 2619 CONSULATE DR SUITE 800,ORLANDO, SOLAREDGE P340 RAPID FL 32819 POWER OPTIMIZERS SHUTDOWN Tel:(800)385-1075 2-#10 AWG,PV WIRE 2-#10 AWG,THWN-2 SWITCH 3-#10 AWG,THWN-2 1-#6 AWG IN FREE AIR OR 1-#8 EGC,THWN-2 1-#8 EGC,THWN-2 GREG ALBRIGHT #8 AWG MUST BE IN EMT CONDUIT IN 3/4"OR IN 3/4"OR LARGER EMT LARGER EMT CONDUIT CONDUIT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 NOTE: CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT THREE LINE DIAGRAM TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-4 WIRE SCHEDULE CLIENT: CHRISTOPHER ROOTE STARTING ADJUSTMENT MAXIMUM 8803 BROOKLINE AVENUE,FORT PIERCE, STARTING TEMPERATURE ADJUSTED FL 34951 RACEWAY CONDUCTOR AWG ALLOWABLE CURRENT CORRECTION FACTOR FOR CONDUCTOR CURRENT AHJ:ST.LUCIE COUNTY # EQUIPMENT WIRE LOCATION QTY. WIRE AMPACITY @ 90°C FACTOR APPLIED TO MORE THAN 3 AMPACITY APPLIED TO UTILITY:FPL-FLORIDA POWER&LIGHT SIZE CONDUCTORS 310.15(B)(2)(a) CONDUCTORS CONDUCTORS PHONE:(772)240-8945 310.15(B)(16) IN RACEWAY 310.15(B)(3)(a) @ 90°C IN RACEWAY 1 DC MODULE TO OPTIMIZER ROOF/FREE-AIR 2 10 40 13.15 1 1 40.00 16.44 2 DC OPTIMIZER TO JUNCTION BOX ROOF/FREE-AIR 2 10 40 15.00 1 1 40.00 18.75 3 DC JUNCTION BOX TO INVERTER 1 EXTERIOR WALL 6 10 40 15.00 1 0.8 32.00 18.75 SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW 4 DC JUNCTION BOX TO INVERTER 2 EXTERIOR WALL 2 10 40 15.00 1 1 40.00 18.75 SYSTEM SIZE HA 1 HA C @ 240V MODULES:65 X NW OCELL:O.PEAK 5 AC INVERTER 1 TO DEDICATED LOAD CENTER EXTERIOR WALL 3 6 75 47.50 1 1 75.00 59.38 DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 6 AC INVERTER 2 TO DEDICATED LOAD CENTER EXTERIOR WALL 3 10 40 16.00 1 1 40.00 20.00 INVERTER 1:SOLAREDGE SE1140OH-USRGM [Sill 7 AC DEDICATED LOAD CENTER TO AC DISCONNECT EXTERIOR WALL 3 4 95 63.50 1 1 95.00 79.38 INVERTER 2:SOLAREDGE SE380OH-USRGM [Sill 8 AC AC DISCONNECT TO POI EXTERIOR WALL 3 4 95 63.50 1 1 95.00 79.38 REVISIONS NO. REVISED BY DATE .Q. freedom F O R E V E R FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG A�LhB�RIIGI HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 CONDUCTOR AMPACITY CALCULATIONS IN ACCORDANCE WITH NEC 690.8. CONDUCTOR CALCULATIONS JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-5 BREAKER SIZES: SERVICE LIST: 60A PV BREAKER NONE 20A PV BREAKER MATERIAL LIST: OTY. PART PART# DESCRIPTION 65 MODULES 111-340 HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W 65 OPTIMIZERS 130-340 SOLAREDGE P340 POWER OPTIMIZER-FRAME MOUNTED MODULE ADD-ON 1 JUNCTION BOX 480-276 60OVDC NEMA 3R UL LISTED JUNCTION BOX 2 CONNECTORS 240-300 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(FEMALE) 2 ICONNECTORS 240-301 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(MALE) 1 INVERTER 120-113 SOLAREDGE SE1140OH-USRGM[SI1]240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN 1 INVERTER 120-383 SOLAREDGE SE380OH-USRGM[Sill 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN CLIENT: 1 COMBINER PANEL 151-100 100A DEDICATED LOAD CENTER CHRISTOPHER ROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, 1 AC DISCONNECT 321-101 100A RATED 240VAC NEMA 3R UL LISTED FL 34951 2 FUSES 330-080 80A FUSE 1 PH 240VAC AHJ:ST.LUCIE COUNTY 1 FUSE REDUCER 330-510 10OA-60A FUSE REDUCER UTILITY:FPL-FLORIDA POWER&LIGHT PHONE:(772)240-8940-8945 157 ROOF ATTACHMENT 1 240-401 S-51:PROTEA 32 RAIL 1 211-100 UNIRAC SM LIGHT RAIL 168 INCH(TOTAL 440 FEET NEEDED) 65 RAIL HARDWARE 1 261-517 BND T-BOLT AND NUT SS 69 MODULE CLAMPS 1 221-101 SM MIDCLAMP PRO DIRK 69 MODULE CLAMPS 1 221-202 SM ENDCLAMP PRO W/END CLAMP SYSTEM: 23 SPLICE 1 261-600 BND SPLICE BAR PRO SERIES MILL SYSTEM SIZE(DC):65 X 340=22.100 kW 69 ML HA PE MOUNT 1 261-510 MICRO MNT BND TBOLT SS SYSTEM SIZE 1 C @ 240V MODULES:65 X NWHA QC ELL:Q.PEAK 18 ACCESSORIES 1 211-202 E-BOSS CONDUIT MOUNT COMP KIT DUO BLK-G6+/SC 340W 36 ACCESSORIES 1 211-200 E-BOSS RAIL TRAY OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM 12 ACCESSORIES 1 211-206 E-BOSS BRIDGE TRAY [SI1] 20 ACCESSORIES 1 211-207 E-BOSS BRIDGE CLIPS INVERTER 2:SOLAREDGE SE380OH-USRGM 64 GROUNDING LUG 1 260-300 BURNDY GROUND WEEB-LUG [SI1] 111 L-FOOT 1 241-100 UNIRAC L-FOOT SERRATED W(T-BOLT CLEAR(KIT) REVISIONS NO. REVISED BY DATE freedom F O R E V E R FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 EQUIPMENT&SERVICE LIST JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-6 WARNING: "WARNING" NOTES: POWER SOURCEOUTPUT DUAL POWER SOURCES 1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324 Y MARKINGS SHOWN HEREON. CONNECTION • 1 SOURCE IS PHOTOVOLTAIC2. ALL MARKING SHALL CONSIST OF THE FOLLOWING: 1 • NOT RELOCATERATED • 1 AMPS A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING. OVERCURRENT DEVICE. AC NORMALOPERATING VOLTAGE1 VOLTS B. RED BACKGROUND COLOR WHITE TEXT AND LINE 705.12(B)(2)(3)(b) WORK. C. ARIAL FONT. 690.54 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN SOLAR PV SYSTEM EQUIPPED THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN. WITH RAPID SHUTDOWN 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM RESPONDEREMERGENCY AND REDUCE SHOCK SOLARTHIS ■V SYSTEM ■ ■ ED HAZARD IN THE ARRAY WITH RAPID 690.56(C)(1)(A) is CLIENT: ELECTRICAL SHOCK HAZARD. CHRISTOPHER ROOTE TURN RAPID SHUTDOWN8803 BROOKLINE AVENUE,FORT PIERCE, SWITCH TO THE "OFF" TERMINALS • : • 1 • ` 1 1 FL34951 AHJ:ST.LUCIE COUNTY POSITION. o nPELECTaic 1 MAY - 1 OPEN POSITION. UTILITY:FPL-FLORIDA POWER&LIGHT J PVPANe s ' PHONE:(772)240-8945 "IIII■ a ONLY CONDUCTORS INSIDE BUILDING OR OFF THE 690.13 (B) ROOF WILL SHUT DOWN SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW NFPA 11.12.2.1.1.1.2 MAXIMUM VOLTAGE: °1 SYSTEM SIZE(AC):15.200 kW @ 240V MAXIMUM CIRCUIT CURRENT: f . MODULES:65 X HANWHA QCELL:Q.PEAK Q DUO BLK-G6+/SC 340W RATED • CURRENT • OPTIMIZERS:65 X SOLAREDGE P340 ■V SYSTEM / DISCONNECT OUTPUT ■ ■ I THE CONTROLLER OR1 f) I [S 1] RATED RTER 1:SOLAREDGE SE1140OH-USRGM ENT AC ■ 1 ` ■ INVERTER 2:SOLAREDGE SE380OH-USRGM 1 NORMAL ■ 1 OPERATING ■ ■ ' VOLTAGE ' 240 VOLTS [SI1] 690.53 690.15,690.54 ARRAY RAPID SHUTDOWN SWITCH FOR I I SOLAR� - � INVERTER � REvlsloNs V SYSTEM DC J/B NO. REVISED BY DATE 690.56(C)(3) if you have any questions about your system,please call our Customer Support Team at L EMERGENCYRESPONDER 888.557.6431 1 NEC 690.31(G)(3)&(4) '�� freedom THIS • 1 ■ ■ EQUIPPED ■ , or visit freedomforever.com/customer-service �.' F 0 R E V E R J FREEDOM FOREVER LLC WITH RAPID ■ , , • This solar PV system was Installed by "WARNING" 2619 CONSULATE DR SUITE 800,ORLANDO, L_ - - _J — — — FL32819 treedom° PHOTOVOLTAIC POWER SOURCE Tel:(800)385-1075 r oar V e s GREG ALBRIGHT •w..e.m ray...,i..noe..e o.,no m.u.,...u.p.....iR�,no,.mm,n,.m.TURN RAPID SHUTDOWN n.e. EVERY 10'ON CONDUIT AND ENCLOSURES SWITCH TO THE "OFF" SOLARELE PV PANELSLS CONTRACTOR LICENSE: POSITION TO SHUT DOWN CERTIFIED ELECTRICAL CONTRACTOR ENTIRE PV SYSTEM EC13008056 LABELS NFPA 11.12.2.1.1.1.1 JOB NO: DATE: I DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-7 CAUTION . POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH CLIENT: DISCONNECTS AS SHOWN CH HERROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, FL 34951 34951 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT PHONE:(772)240-8945 BROOKLINE AVENUE 65 PV MODULES SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V MODULES:65 X HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM Sill INVERTER 2:SOLAREDGE SE380OH-USRGM SI1l MAIN SERVICE PANEL INVERTER EQUIPPED WITH RAPID SHUTDOWN UTILITY METER INVERTER EQUIPPED AC DISCONNECT WITH RAPID SHUTDOWN REVISIONS COMBINER PANEL NO. REVISED BY DATE WARNING TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL Nfreedom F O R E V E R FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT NOTES: - 1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324 MARKINGS SHOWN HEREON. CONTRA, E: 2. ALL MARKING SHALL CONSIST OF THE FOLLOWING: LICENS CERTIFIED ELECTRICAL CONTRACTOR A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING. FC13008056 B. RED BACKGROUND COLOR WHITE TEXT AND LINE WORK. C. AERIAL FONT. 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN. SITE PLACARD 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS. JOB NO: DATE: I DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-7A 1 -10 11 -20 21 -30 31 -40 41 -50 51 -60 SOLAREDGE OPTIMIZER CHART 1 2 3 CLIENT: CHRISTOPHER ROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, FL 34951 4 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT PHONE:(772)240-8945 5 SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V MODULES:65 X HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 6 INVERTER 1:SOLAREDGE SE1140OH-USRGM [Sill INVERTER 2:SOLAREDGE SE380OH-USRGM FFFF [Sill 7 a REVISIONS NO. REVISED BY DATE 8 .Q. freedom 9 �' FOREVER FREEDOM FOREVERLLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT 10 — CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 OPTIMIZER CHART JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-8 SAFETY PLAN MARK UP KEY INSTRUCTIONS: 1. USE SYMBOLS IN KEY TO MARK UP THIS SHEET. OP PERMANENT ANCHOR 2. SAFETY PLAN MUST BE MARKED BEFORE JOB STARTS AS PART OF THE PRE-PLAN 3. DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE OT TEMPORARY ANCHOR & MAKE NOTES ON THE JHA SHEET IN CASE OF EMERGENCY IL INSTALLER LADDER NEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINIC FB] JUNCTION / COMBINER BOX NAME: IS] STUB-OUT ADDRESS: SKYLIGHT SAFETY COACH CONTACT INFORMATION z NAME: NO LADDER ACCESS (STEEP CLIENT: CHRISTOPHER ROOTE 8803 BROOKLINE AVENUE,FORT PIERCE, GRADE OR GROUND LEVEL FL 349514951 PHONE NUMBER: [] OBSTRUCTIONS) AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT PHONE:(772)240-8945 ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THE RESTRICTED ACCESS SAFETY PLAN AND SIGN INDICATING THAT THEY ARE AWARE OF THE HAZARDS ON-SITE AND THE PLAN FOR Fla WORKING SAFELY. CONDUIT SYSTEM: SYSTEM SIZE(DC):65 X 340=22.100 kW SYSTEM SIZE(AC):15.200 kW @ 240V NAME SIGNATURE MODULES:65 X HANWHA QCELL:Q.PEAK �As GAS SHUT OFF DUO BLK-G6+/SC 340W OPTIMIZERS:65 X SOLAREDGE P340 INVERTER 1:SOLAREDGE SE1140OH-USRGM Sill Hz0 WATER SHUT OFF INVERTER2:SOLAREDGE SE380OH-USRGM [SI1] O SERVICE DROP O POWER LINES REVISIONS NO. REVISED BY DATE �Qr freedom F O R E V E R FREEDOM FOREVER LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 DATE: TIME: GREG ALBRIGHT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR FC13008056 SAFETY PLAN JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-9 JOB HAZARD ANALYSIS Crew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site Capture Ladder Access • Crew leader responsible for communication with the client: Heat Related Illness Prevention NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE • Ladders must be inspected before each use. I I Employees shall have access to potable drinking water that is (add as many as necessary by using additional sheets) • Extension ladders must be set up on a firm and level surface at Client and public is excluded from work area by barricades (N/A, fresh, pure, and suitably cool. The water shall be located as a 4-to-1 rise to run angle(or 75 degrees)and the top must be Yes, No): close as practicable to the areas where employees are working. Define the Hazard: Method/steps to prevent incident: secured to the structure. Extension style ladders placed on Water shall be supplied in sufficient quantity at the beginning of uneven, loose or slippery surfaces must additionally have the Training and Pre-Job Safety Briefing the work shift to provide at least one quart per employee per base firmly anchored or lashed so the base will not slip out. • All employees onsite shall be made aware of the specific hazards hour for drinking for the entire shift. Employees may begin the • Extension ladders must be used with walk-through devices or of this project and review this HJA during a pre-job briefing, and shift with smaller quantities of water if they identify the location Define the Hazard: Method/steps to prevent incident: the ladder must extend 36"above the stepping off point. their signature indicates awareness of site conditions and the and have effective means for replenishment during the shift to • A-frame ladders must only be climbed with the ladder spreader plan to eliminate any hazards identified prior to and during the allow employees to drink on quart or more per hour. The bars locked in the open position;A-frame ladders shall not be project. frequent drinking of water shall be encouraged. climbed while in the closed position (ex, closed and used while • Shade shall be present when temperature exceeds 80 degrees leaned against a structure). • Crew leader(name/title): Fahrenheit. When the outdoor temperature in the work exceeds Define the Hazard: Method/steps to prevent incident: • Additional notes: 1 80 degrees Fahrenheit, employees shall have and maintain one • Crew member(name/title): or more areas with shade at all times. Mobile Equipment • New employees must be acclimatized. New employees will be • Only Qualified operators will operate equipment; operators must Crew member(name/title): monitored by their Crew Leader(site supervisor)for the first two maintain a certification on their person for the equipment being (2)weeks of employment or longer when necessary. Define the Hazard: Method/steps to prevent incident: operated. • Crew member(name/title): • Employees will be allowed and encouraged to implement • Type(s)of mobile equipment(Type/Make/Model): I scheduled breaks during each shift. Employees must take • Crew member(name/title): cool-down breaks in the shade any time they feel the need to do • Qualified operator(s): so to protect them from overheating. Supervisors are • Crew member(name/title): REQUIRED to allow employees any break period they need Material Handling and Storage during high heat conditions. CLIENT: CHRISTOPHER ROOTE • Materials will be staged/stored in a way that does not present a Airborne Contaminants: • Cool Vests are encouraged for all employees at all times during 8803 BROOKLINE AVENUE,FORT PIERCE, hazard to client, personnel or public. Materials stored on the • Asbestos-containing (Transite) piping (ACP)-Do not disturb periods of high heat. FL 34951 AHJroof will be physically protect from failing or sliding off. move, drill, cut fracture, etc. • Identify the location of the closet Occupational/industrial ational/Industrial Clinic UTILITY: ST:LUCIE COUNTY p Y Y p g g ( ) Y p UTILITY:FPL-FLORIDA POWER&LIGHT • Asbestos-containing thermal insulation (ACI)and or Hospital in case a crew member becomes ill. PHONE:(772)240-8945 Fall Protection Asbestos-containing duct wrapping (ACW)-do not disturb, no • A site-specific plan for fall prevention and protection is required attic or crawlspace access is allowed if work to be performed What is the specific plan to provide and replenish sufficient water for prior to starting work and must remain onsite at all times until could cause exposure to personnel, client or public. all employees on site? work is complete; a fall rescue plan must be outlined and • If offsite replenish is necessary,where will you go to replenish discussed among the crew prior to work start. • If yes, list specific tasks and protection in place: water(location/address): SYSTEM: • First-person-Up (FPU) must install their anchor and connect SYSTEM SIZE(DC):65 X 340=22.100 kWSYSTEM SIZE(AC):15.200 kW @ 240V before any other task, including installing other anchors. The • Who will replenish the drinking water(name): MODULES:65 x HANWHA oCELL:O.PEAK ( muse e on person on a roof DUO BIKERS+/SC Last-Person-Down LPD) t b the only p OPTIMIZERS:65 X SOLAREDGE P340 uninstalling fall protection. INVERTER 1:SOLAREDGE SE1140OH-USRGM • FPCP name and title): Restroom facilities [Sill ( ) INVERTER 2:SOLAREDGE SE3800H-USRGM • Employees shall have access to restroom facilities with [Sill • FPU and LPD (name and title): hand-washing stations. Use of onsite restroom is at the client's discretion (location is annotated below). If client does not give Electrical Safety permission, location of suitable restroom facilities with • The Electrical Qualified Person (EQP)is required onsite to hand-washing stations offsite will be provided.The onsite perform electrical work. supervisor will identify location and make arrangements to • All electrical work will be performed with equipment in an ensure all employees have access at any point. electrically safe condition (de-energized)unless approval has • Restroom facilities will be(circle one): Onsite-Offsite REVISIONS NO. REVISED BY DATE been granted prior to work. Weather and Environment • If Offsite, add location name and address: • Service drops and overhead electrical hazards will be indentified • The site supervisor shall forecast the weather conditions at the and protected from contact, as neccessary. job site, prior to crew arrival, in order to mitigate any hazards Incident Reporting Procedure • EQP(name and tile): associated with inclement weather(heat, cold,wind, rain, etc.) Contact your Site Supervisor ((�� • The site supervisor will utilized a portable wind meter Name: Q* freedom Public Protection (anemometer)to verify actual onsite wind conditions, by checking F O R E V E R • The safety of the Client and Public must be maintained at all at the ground and on any elevated work surface(ex, rooftop) Phone: FREEDOM FOREVER LLC times. prior to work start, at midday and prior to solar panel staging on a 2619 CONSULATE DR SUITE 800,ORLANDO, 819 • The Client and the Public shall be prevented from entering the roof. . 80 )385- p g Contact our Manager Tel:(800)385-1075 work zone through the use of barriers and/or signage, as Elevated work involving the moving or maneuvering of solar Name: GREG ALBRIGHT required. panels shall cease at 25mph (sustained wind)until wind • Company, Client and Public property shall be protected from subsides. Phone: falling objects. Forecasted weather maximum temp(degrees f): • Pets(including dogs)shall be secured by their owners prior to Contact your Site Supervisor CONTRACTOR LICENSE: work start. Name: CERTIFIED ELECTRICAL CONTRACTOR • The Client should not leave pets,family members, or others in EC13008056 charge or care of Employees, Contractors, or Temporary Phone: Workers. With:Your full name, phone number, office location, brief description SAFETY PLAN Of what happen and when. JOB NO: DATE: DESIGNED BY: SHEET: F120561 1/27/2022 C.A. PV-10 powered by MECHANICAL SPECIFICATION il LIM ILIVI ka D U a Format 68.5 x 40.6 x 1.26 in(including frame) (1740 x 1030 x 32mm) 58.5°(17406. mm 38.68"(980 mm) 15.0°(380 mm� Weight 43.9 1 bs(19.9kg) Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass =45.3-(l 0mm) _ with anti-reflection technology 1 1 4 x Grounding points a 0.12'i"(4.5 mm) Freme Back Cover Composite film 38.82"(981mm) Frame Black anodized aluminum ® aos•ilo3o mm) - Cell 6 x 20 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98 x 1.26-2.36 x 0.59-0.71in(53-101 x 32-60 x 15-18mm),Protection class IP67,with bypass diodes i45.3"(ll5omm) Cable 4 Ml Solar cable;(+)s:45.3 in(1150 ml(-)>:45.3 in(1150 mm) 1 8-Drem4g<hpl« Connector Staubli MC4,Hanwha Q CELLS HQC4,Amphenol UTX, 4'M...tl,94 (DETAiLA) Renhe 05-6,Tongling TL-CableOlS,JMTHY JM601;IP68 or z5°(32 mmi DETAiLA 0.630•'(15mm) Friends PV2e,IP67 0.955"(24.6 mm)T T0.335'(8.5 mm) . • = • ELECTRICAL CHARACTERISTICS POWER CLASS 330 335 340 345 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power atMPPI PMPP [W] 330 335 340 345 . OCELLS E Short Circuit Current' Isc [A] 10.41 10.47 10.52 10.58 • . Open Circuit Voltage' VGc IV] 40.15 40.41 40.66 40.92 TOP BRAND IV E Current at MPP impp [A] 9.91 9.97 10.02 10.07 - � 4uaiity restea Voltage at MPP vmpp IV] 33.29 33.62 33.94 34.25 �naeM Efficiency' q [%] >_18.4 >_18.7 >_19.0 >_19.3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 ww.VDEinfp.7 ID.400s25s7 Power at MPP PMPP [W] 247.0 250.7 254.5 258.2 E Short Circuit Current Isc [A] 8.39 8.43 8.48 8.52 E Open Circuit Voltage VGc IV] 37.86 38.10 38.34 38.59 c Q.ANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY Current at MPP impp [A] 7.80 7.84 7.89 7.93 Higher yield per surface area,lower BOS costs,higher Voltage at MPP vmpp IV] 31.66 31.97 32.27 32.57 power classes,and an efficiency rate of up to 19.5%. 'Measurement tolerances PMpp±3%;13c;VGc±5%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE INNOVATIVE ALL-WEATHER TECHNOLOGY - At least 98%of nominal power during �>s I � � i Optimal yields,whatever the weather with w - o f P Y u °. 5wryra�eb�f ,wa�M, first year.Thereafter max.0.54% w excellent low-light and temperature behavior. wg ° degradation per year.At least93.1% of nominal power up to 10 years.At z ° least 85%of nominal power up to v, ENDURING HIGH PERFORMANCE `� ° 25years. a 90 -L 1 J -+ �- z. u Long-term yield security with Anti LID and Anti PID Technologyl, o All data within measurement toleranc- v 3° z Hot-Spot Protect and Traceable Quality Tra.QT"^ as.Full warranties in accordance with a °° °°° ^°° °°° °°° woo the warranty terms of the Q CELLS IRRADIANCE[W/m-] o ,e sales organization of your respective o � (/I EXTREME WEATHER RATING wn n9n,49,od�a 3 Poma :° :° country. 11 YEARS Typical module performance under low irradiance conditions in o pa=m-°m14 ce=��3=wem5„2o�4�High-tech aluminum alloy frame,certified for high snow comparison to STC conditions(25°C,1000 W/m2) 7/ (5400 Pa)and Wind loads(4000 Pa). TEMPERATURE COEFFICIENTS 6 Temperature Coefficient of I_ a [%/K] +0.04 Temperature Coefficient of VGc [i [%/K] -0.27 A RELIABLE INVESTMENT Temperature Coefficient of PMpp y [%/K] -0.36 Normal Module Operating Temperature NMOT [°F] 109±5.4(43±3°C) Y Inclusive 25-year product warranty and 25-year o linear performance warranty2. PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage V5.3 IV] 1000(IEC)/1000(UL) Safety Class II o STATE OF THE ART MODULE TECHNOLOGY Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 1703 C(IEC)/TYPE 2(UL) 11 r Q.ANTUM DUO combines cutting edge cell separation Max.Design Load,Push/PUII3 [Ibs/ft2] 75(360OPa)/55(2667Pa) Permitted Module Temperature -40°F up to+185°F D and innovative wiring with Q.ANTUM Technology. on Continuous Duty (-40°C up to+85°C) Max.Test Load,Push/Pull3 [Ibs/ft2] 113(540OPa)/84(4000Pa) 3 See Installation Manual I APT test conditions according to IEC/TS 62804-1:2015,method B(-1500 V,168 h) 2 See data sheet on rear for further information -_ QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 1703,VIDE Quality Tested,CE-compliant,IEC 61215:2016,IEC 61730:2016, Number of Modules per Pallet 32 ° Application Class II,U.S.Patent No.9,893,215(solar cells) Number of Pallets per 53'Trailer 28 ® Number of Pallets per 40'HC-Container 24 0 THE IDEAL SOLUTION FOR: pVE E Ss c�nus Pallet Dimensions(LxWxH) 71.5 x 45.3 x 48.0 in(1815 x 1150 x 1220mm) N Rooftop arrays on °' Pallet Weight 1505lbs(683kg) ® residential buildings Ljl� Note:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. CELLS Hanwha CELLS ,Inc. Engineered in Germany 400 Spectrum Centerer Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiryQus.q-cells.com I WEB www.q-cells.us Power Optimizer MV For North America Power Optimizer P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 O P340 P370 For North America Optimizer model 32 (for high- (for higher- P400 P405 P485 P505 power (typical module (for 6 -cle power 60 and 72- P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 •• •' voltagell voltage modules) mINPUT Rated Input DC Powerni 320 1 350 370 400 40S 485 505 W Absolute Maximum Input Voltage 48 60 80 60 125i2i 830 Vdc (Voc at lowest temperature) MPPT Operating Range 8-48 8-60 8-80 8-60 12.5-105 12.5-83 Vdc O Maximum Short Circuit Current 11 11.02 (Isc) 11 10.1 11.75 11 14 Adc Maximum DC Input Current 13.75 12.5 14.65 12.5 17.5 Adc 25 Maximum Efficiency 99.5 Weighted Efficiency 98.8 98.6 % YEAR Overvoltage Category II WARRANTY OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc V7ARRAN OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power 1±0.1 Vdc Optimizer STANDARD COMPLIANCE N EMC FCC Part15 Class 3,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 Material UL94 V-0,UV Resistant ROHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System 1000 Vdc Voltage Compatible inverters All SolarEdge Single Phase and Three Phase inverters 129x153x33.5 129x153x29.5 129x162x59 TrimDimensions(WxLxH) 129x153x27.5/5.1x6x1.1 /5.1x6x1.3 /S.1x6x1.16 129x159x49.5/5.1x6.3x1.9 /5.1x6.4x2.3 /in Weight(including cables) 630/1.4 750/1.7 655/1.5 845/1.9 1064/2.3 gr/lb Input Connector MC4s) Single or dual MC4i3i MC4t3n"i Input Wire Length 0.16/0.52 0.16 or 0.9 0.16/0.52 m/ft /0.52 or 2.95 Output Wire Type/Connector Double Insulated/MC4 Output Wire Length 0.9/2.95 1.2/3.9 m/ft PV power optimization at the module-level Operating TemperatureRangeib 40to+85/-40to+185 -C/°F Protection Rating IP68/Type 6P Relative Humidity 0-100 % / Specifically designed to work with SolarEdge 1 Fast installation with a single bolt (1)Rated power of the module at STC will not exceed the optimizer"Rated Input DC Power".Modules with up to+5%power tolerance are allowed (2)NEC 2017 requires max input voltage be not more than 80V inverters (3)For other connector types please contact SolarEdge (4)For dual version for parallel connection of two modules use P485-4NMDMRM.In the case of an odd number of PV modules in one string,installing one P485 dual version power optimizer connected to / Next generation maintenance with module- one PV module.When connecting a single module seal the unused input connectors with the supplied pair of seals <) to 25°/D more energy level monitoring (5)Longer inputs wire length are available for use.For 0.9m input wire length order P401-xxxLxxx p gY (6)For ambient temperature above+85°C/+1857 power de-rating is applied.Refer to Power Optimizers Temperature De-Rating Technical Note for more details / Superior efficiency (99.5%) / Meets NEC requirements for arc fault DesignPV System • _ . Three Phase for protection (AFCI) and Photovoltaic Rapid SolarEdge / Mitigates all types of module mismatch losses, Shutdown System PVRSS P320,P340,P370, Y ( ) Minimum String Length 8 10 18 from manufacturing tolerance to partial (PowerOptimizers> P400,P401 P405,P485,P505 6 8 14 shading / Module-level voltage shutdown for installer Maximum String Length(Power Optimizers) 25 25 50t9i and firefighter safety 5700 T(000 wit' / Flexible system design for maximum space Maximum Power per String SE7600-US-SE11400- 5250 600000) 12750(") W us> utilization Parallel Strings of Different Lengths or Orientations Yes (7) For detailed string sizing information refer to:http://www.solaredge.com/sites/default/files/string_sizing-na.pdf (8)It is not allowed to mix P405/P485/P505 with P320/P340/P370/P400/P401 in one string (9)A string with more than 30 optimizers does not meet NEC rapid shutdown requirements;safety voltage will be above the 30V requirement (10)For 208V grid:it is allowed to install up to 6,500W per string when the maximum power difference between each string is 1,000W (11)For 277/480V grid:it is allowed to install up to 15,000W per string when the maximum power difference between each string is 2,000W solaredge.com solar=@@ S t;rtra Technologies Ltd.All rights reserved.rk,SOLAREDGE,the SolarEdge logo,OPTIMIZED BY 0000 SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc. (60u. Ro u All other trademarks mentioned herein are trademarks of their respective owners.Date:12/2021 DS-000044-1.3-NA.Subject to change without notice. C n Intertek Single Phase Inverter P=4 with HD-Wave Technology for North America SE3000H-US / SE380OH-US / SE5000H-US / S E6000H-US/S• n le Phase Inverter Z SE760OH-US / SE10000H-US SE1140OH-US l< OUTPUT with HD-Wave Technology m Rated AC Power Output 3000 3800 @ 208V 5000 5000 @ 208V 7600 0000 10000 @ 208V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V for North America Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / AC Output Voltage Min. Nom. Max. Vac (211-240-264) AC Output Voltage Min.-Nom.-Max. Vac SE760OH-US / SE10000H-US / SE1140OH-US L.'..' (183-208-229) r12-215 AC Frequency(Nominal) 59.3-60-6051i Hz Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A YEAR-..= L"1 Current @240V solar �-���-wOVe Maximum Continuous Output Current @208V 16 24 48.5 A UnGFDI Threshold 1 A solar : U Utility Monitoring,Islanding Protection, Yes Country Configurable Thresholds INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V - 5100 - 7750 - - 15500 W Transformer-less,Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc ~ Maximum Input Current @240VI21 8.5 10.5 13.5 16.5 20 27 30.5 Adc n Maximum Input Current @208VI�1 - 9 13.5 - 27 Adc Max.Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes a Ground-Fault Isolation Detection 600kn Sensitivity 7 � Maximum Inverter Efficiency 99 99.2 °k CEC Weighted Efficiency 99 99 @ 240V % 98.5 @ 208V a Nighttime Power Consumption <2.5 W 1 1W ! ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional) Revenue Grade Data,ANSI C12.20 Optional"' Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect Optimized installation with HD-Wave technology 2017690.12 p 9Y STANDARD COMPLIANCE Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-07 Specifically designed to work with Extremely small Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI) power optimizers Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS / Record-breaking efficiency Built-in module-level monitoring AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG / Fixed voltage inverter for longer strings / Outdoor and indoor installation AWG Range Dimensions with Safety Switch 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/ (HxWxD) mm / Integrated arc fault protection and rapid shutdown for Optional: Revenue grade data,ANSI C12.20 Weight with Safety Switch 22/10 25.1/11.4 26.2/11.9 38.8/17.6 Ib/kg NEC 2014 and 2017, per article 690.11 and 690.12 Class 0.5 (0.5%accuracy) Noise <25 1 <50 dBA Cooling Natural Convection UL1741 SA certified, for CPUC Rule 21 grid Operating Temperature Range -13 to+140/-25 to+6&4)(-40°F/-40°C option)"' compliance Protection Rating NEMA 4X(Inverter with Safety Switch) 0)For other regional settings please contact SolarEdge support ¢)A higher current source may be used;the inverter will limit its input current to the values stated s o 1 a r ai Revenue grade inverter P/N ion refer to:h 0NNC2 1^1 For power de-rating information refer to:https://wwwsolaredge.com/sites/default/files/se-temperature-Berating-note-na.pdf so a red g e.co m W ts)-40 version P/N:SExxxxH-US000NNU4 O SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S other trademarks mentioned herein are trademarks of their respective owners.Date:03/2019N01/ENG NAM.Subject to change without notice. Single Phase Inverter P=4 with HD-Wave Technology for North America SE3000H-US / SE380OH-US / SE5000H-US / S E6000H-US/S• n le Phase Inverter Z SE760OH-US / SE10000H-US SE1140OH-US l< OUTPUT with HD-Wave Technology m Rated AC Power Output 3000 3800 @ 208V 5000 5000 @ 208V 7600 0000 10000 @ 208V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V for North America Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / AC Output Voltage Min. Nom. Max. Vac (211-240-264) AC Output Voltage Min.-Nom.-Max. Vac SE760OH-US / SE10000H-US / SE1140OH-US L.'..' (183-208-229) r12-215 AC Frequency(Nominal) 59.3-60-6051i Hz Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A YEAR-..= L"1 Current @240V solar �-���-wOVe Maximum Continuous Output Current @208V 16 24 48.5 A UnGFDI Threshold 1 A solar : U Utility Monitoring,Islanding Protection, Yes Country Configurable Thresholds INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V - 5100 - 7750 - - 15500 W Transformer-less,Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc ~ Maximum Input Current @240VI21 8.5 10.5 13.5 16.5 20 27 30.5 Adc n Maximum Input Current @208VI�1 - 9 13.5 - 27 Adc Max.Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes a Ground-Fault Isolation Detection 600kn Sensitivity 7 � Maximum Inverter Efficiency 99 99.2 °k CEC Weighted Efficiency 99 99 @ 240V % 98.5 @ 208V a Nighttime Power Consumption <2.5 W 1 1W ! ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional) Revenue Grade Data,ANSI C12.20 Optional"' Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect Optimized installation with HD-Wave technology 2017690.12 p 9Y STANDARD COMPLIANCE Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-07 Specifically designed to work with Extremely small Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI) power optimizers Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS / Record-breaking efficiency Built-in module-level monitoring AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG / Fixed voltage inverter for longer strings / Outdoor and indoor installation AWG Range Dimensions with Safety Switch 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/ (HxWxD) mm / Integrated arc fault protection and rapid shutdown for Optional: Revenue grade data,ANSI C12.20 Weight with Safety Switch 22/10 25.1/11.4 26.2/11.9 38.8/17.6 Ib/kg NEC 2014 and 2017, per article 690.11 and 690.12 Class 0.5 (0.5%accuracy) Noise <25 1 <50 dBA Cooling Natural Convection UL1741 SA certified, for CPUC Rule 21 grid Operating Temperature Range -13 to+140/-25 to+6&4)(-40°F/-40°C option)"' compliance Protection Rating NEMA 4X(Inverter with Safety Switch) 0)For other regional settings please contact SolarEdge support ¢)A higher current source may be used;the inverter will limit its input current to the values stated s o 1 a r ai Revenue grade inverter P/N ion refer to:h 0NNC2 1^1 For power de-rating information refer to:https://wwwsolaredge.com/sites/default/files/se-temperature-Berating-note-na.pdf so a red g e.co m W ts)-40 version P/N:SExxxxH-US000NNU4 O SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S other trademarks mentioned herein are trademarks of their respective owners.Date:03/2019N01/ENG NAM.Subject to change without notice. ©2016 Eaton. All rights reserved. pe.eaton.com Eaton general duty cartridge fuse safety switch DG223NRB UPC:782113144252 Dimensions: • Height: 19.25 IN • Length: 7.38 IN • Width: 9.13 IN Weight:14 LB Notes:Maximum hp ratings apply only when dual element fuses are used. 3-Phase hp rating shown is a grounded B phase rating, UL listed. Warranties: • Eaton Selling Policy 25-000, one (1) year from the date of installation of the Product or eighteen (18) months from the date of shipment of the Product, whichever occurs first. Specifications: • Type: General duty, cartridge fused • Amperage Rating: 100A • Enclosure: NEMA 3R • Enclosure Material: Painted galvanized steel • Fuse Class Provision: Class H fuses • Fuse Configuration: Fusible with neutral • Number Of Poles: Two-pole • Number Of Wires: Three-wire • Product Category: General duty safety switch • Voltage Rating: 240V Supporting documents: • Eatons Volume 2-Commercial Distribution • Eaton Specification Sheet- DG223NRB Certifications: • UL Listed Product compliance: No Data ProteaBracketTM is the perfect solar attachment solution for most trapezoidal S=59t rib, exposed-fastened metal roof profiles! The Right Way!— NOW AVAILABLE The Right Way!TM IN ALUMINUM � - ' ' � ' �" -' '' '� �' ••� ProteaBracketTM A versatile bracket for N mounting solar PV to a f � trapezoidal roof profiles O QProteaBracketTl is now made in aluminum. O Still the most versatile trapezoidal metal r roof attachment solution on the market, the S-5! ProteaBracket just got better! ------ � � The bracket features an adjustable attachment base and module attachment ' 0 •O options to accommodate different roof Nprofile dimensions and mounting options. • Our pre-applied EPDM gasket with peel ` i and stick adhesive makes installation O a snap,ensuring accurate and secure Features and Benefits ''II • •• �• placement the first time. d With no messy sealants,faster installation, 34% lighter- saves on shipping L. and a weather-proof fit, ProteaBracket Stronger L-FootTM O M offers you the most versatile solar Load-tested for engineered V ,� attachment solution available. N application LO • Corrosion-resistant materials (n v Adjustable - Fits rib profiles M up to 3" ' M ProteaBracket*can be used for Peel-and-Stick prevents accidental O rail mounting or "direct-attach" shifting during installation _ \ }' with 5-5! PVKITT" Fully pre-assembled N i 25-year warranty* M ProteaBracket"and the 5-5!PVKIT'"2.0 3 M mounted on a trapezoidal roof profile Lh •i 00 4) *When ProteaBracket is used in conjunction with the S-51 PVKIT, *See www.S-5.com for details. WM an additional nut is required during installation. 00 r w1Y iin i mom h4m SOLARMOUNT .. ' ' • ' ' ' ' ' ' ' ' ' ' ' ' ' ' " ' ' ' ' ' UNIRAC BETTER DESIGNS TRUST THE INDUSTRY'S BEST DESIGN TOOL CONCEALED UNIVERSAL o Start the design process for every project in our U-Builder on-line design tool. ENDCLAMPS It's a great way to save time and money. BETTER SYSTEMS ONE SYSTEM-MANY APPLICATIONS Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety of modules in Portrait or Landscape.Tilt the system up on flat or low slow roofs. END CAPS INCLUDED Components available in mill,clear,and darkfinishesto optimize your design financials WITH EVERY ENDCLAMP and aesthetics. BETTER RESULTS MAXIMIZE PROFITABILITY ON EVERY JOB CONCEALED --- Trust Unirac to help you minimize both system and labor costs from the time the job is UNIVERSAL quoted to the time you rteams get off the roof.Faster installs.Less Waste.More Profits. CLAMPS UNIVERSAL SELF UNIRAC BETTER SUPPORT STANDING MIOCLAMPS 25 WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM Professional support for professional installers and designers.You have access to our technical support and training groups.Whatever your support needs,we've got OPTIONAL YEAH you covered.Visit Unirac.com/solarmount for more information. ■ FRONTTRIM WABRATI � U-BUILDER ONLINE DESIGN • I ��� TOOL SAVES TIME& MONEY BONDING&GROUNDING ��� Visit design.unirac.com w MECHANICAL LOADING UL2703 Mai SYSTEM FIRE CLASSIFICATION UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT I 1 I ' UNMATCHED CERTIFIED ENGINEERING BANKABLE DESIGN PERMIT EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION TECHNICAL SUPPORT CERTIFIED QUALITY PROVIDER BANKABLE WARRANTY Unirac's technical support team is dedicated to answering Unirac is the only PV mounting vendor with ISO Don't leave your project to chance,Unirac has the questions&addressing issues in real time.An online certifications for 9001:2008,14001:2004 and OHSAS financial strength to back our productsand reduceyour risk. THE PROFESSIONALS' CHOICE FOR RESIDENTIAL RACKING library Df documents including engineering reports, 18001:2001,which means wetleliverthe highest standards Have peace ofmintlknowingyou are providing products of stamped letters and technical data sheets greatly forfit,form,and function.These certifications demonstrate exceptional quality.SOLARMOUNTis covered bya 25 year simplifiesyour permittingand project planning process. our excellence and commitment to first class business practices. limited product warranty and a 5 year limitedfinish warranty. BEST INSTALLATION EXPERIENCE•CURB APPEAL•COMPLETE SOLUTION•UNIRAC SUPPORT ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN FOR QUESTIONS 0R CUSTOMER SERVICE VISIT UNIRAC.00M 0R CALL (505) 248-2702 PUB2018AUG31-PRINTED UPDATE FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 CSA CSA GROUP'm (EP GROUP` Certificate:70131735 Master Contract: 266909 Certificate of Compliance Project: 80082031 Date Issued: 2021-06-02 Certificate: 70131735 Master Contract: 266909 The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules. Project: 80082031 Date Issued• 2021-06-02 The system is secured to the roof with the L-Foot components through the roofing material to building structure. Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end Issued To: Unirac clamps. The modules are bonded to the racking system with the stainless-steel bonding mid clamps with piercing 1411 Broadway NE points. The system is grounded with 10 AWG copper wire to bonding/grounding lugs.Fire ratings of Class A Albuquerque,New Mexico,87102 with Type 1,2, 3, 10, 19,22 or 25 for steep slope. Tested at 5"interstitial gap which allows installation at any United States stand-off height. Attention: Klaus Ncolaedis The grounding of the system is intended to comply with the latest edition of the National Electrical Code,to include NEC 250&690. Local codes compliance is required, in addition to national codes.All The products listed below are eligible to bear the CSA Mark shown with grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used p g during the certification testing for the current edition of the project report. adjacent indicators 'C' and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicatorfor Canada only. The system may employ optimizers/micro-inverters and used for grounding when installed per installation instructions. UL 2703 Mechanical Load ratings: Issued by: �4 c�EO Downward Design Load(lb/ft2) 113.5 Michael Hoffnagle Upward Design Load (Ib/ft2) 50.7 O Down-Slope Load(1b/ft2) 16.13 CD Test Loads: C US Downward Load (Ib/ft2) 170.20 Upward Load (lb/ft2) 76.07 Down-Slope Load(Ib/ft2) 24.2 PRODUCTS CLASS -C531302-POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems Unirac Large Array CLASS -C531382-POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems - Certified to US Standards ULA is a ground mount system using the SolarMount(SM)platform for the bonding and grounding of PV modules.ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the Models: SM - SOLARMOUNT Flush-to-Roof is an extruded aluminum rail PV horizontal Pipe to the vertical Pipe. The Front cap is also used to secure the Cross brace.A Slider is attached to racking system that is installed parallel to the roof in landscape or the vertical Pipe to secure the Cross brace. The SM rails,caps, slider,rail brac kets, and cross braces materials are portrait orientations. 6105-T5 aluminum extrusion.Fasteners materials are 304 stainless steel. Horizontal and vertical pipe materials ULA - Unirac Large Array is a ground mount system using the meet the minimum requirements of ASTM A53 for galvanized steel pipe in 2"and 3"diameter. SolarMount (SM) platform for the bonding and grounding of The mechanical load ratings from the SM test data will be applied to the ULA model. PV modules. Solarmount Fire Testing is not applicable due to being a ground mount system. DOD 507 Rev.2019-04-30 ©2018 CSA Group. All rights reserved. Pa e 1 DOD 507 Rev.2019-04-30 ©2018 CSA Group. All fights reserved. Pa e 2 CM ' L+f CM '—— a CC ft'f'Cate TUV Rheinland PTL 1 y i �+ 1 Certificate no. r S 47 t 6001 c n t VL.7 VLIVVVIJ V1 1 Q CQ i Z `a ' W0 ; = License Holder: Manufacturing Plant: Cc Z Unirac Inc. Unirac Inc. ■■i Z 1411 Broadway NE 1411 Broadway NE 0 Albuquerque NM 87102 Albuquerque NM 87102 USA USA J O � Ln � N Ln �0 � O 1 O CDN CDCO N N -1 Ln Ln Nn 1.i O O O O 1 i i Test report no.: USA-314 4 0029 005 Client Reference:Tom Young 1 Tested to: UL 2 7 0 3:2 015 1 � 1 r. o rV N a` 1 1 1 M 1 1 1 � 0 Certified Product: Module Rack Mounting System License Fee-Units 1 1 00 Ln I1n Nl r_ Ln Ln OT N N .o r1 �O It .O .O Model Designation: SolarMount (SM) 7 O Ln 1- 10 1,1 .-I � O Ib N l/) N 0 0 0 0 0 O O O Max System Voltage of PV Module: 1000 VDC Max Size of PV Module: 20.8 sq.ft. surface area Max Overcurrent Protection Rating of PV Module: 30 A when using the qualified grounding lugs; 20 A when using the Enphase micro inverter EGC. Fire Rating: Class A when installed with Type 1, Type 2, Type3, or Type 10 fire rated modules. 1 }, 1 21 (continued) F- 1 7 O Appendix: 1,1-5 1 2: 1 Q rn .o � 't J O O� CD Ln �O rn N �O Ln O rl O r1 O Ln r4 1 V) -i O O O O O O O O 1 , Licensed Test mark: Date of Issue (day/mo/yr) 1 VI V 27/07/2016 1 G x x x x 1 COO* a a x } x a x > Q a z z LU t- a J J w w � TOVRheinDUS = LJJ O O LL LL l7 l7 tL 0 v Z Z O O LL LL •1 w Lu F- F- O O L _ O V) O O w w V) n ' V) ' O Q a 0 0 0 o TUV Rheinland PTL,LLC,1107 W.Fairmont Drive,Building A,Tempe,Arizona 85282,Tel(480)966-1700,Fax(775)314-6458 PZ8 PZ8 structural structural ENGINEERS ENGINEERS January 20,2021 Unirac Components and Cladding Roof Zones: 1411 Broadway Blvd.NE The Components and Cladding Roof Zones shall be determined based on ASCE 7-16 Component and Cladding design. Albuquerque,NM 87102 Notes: 1)U-builder Online tool analysis is only for Unirac SM SOLARMOUNT Rail Flush systems only and do not Attn.:Unirac-Engineering Department include roof capacity check. 2)Risk Category II per ASCE 7-16. Re:Engineering Certification for the Unirac U-Builder 2.0 SOLARMOUNT Flush Rail 3)Topographic factor,kzt is 1.0. 4)Array Edge Factor YE=1.5 PZSE,Inc.-Structural Engineers has reviewed the Unirac SOLARMOUNT rails,proprietary mounting system constructed 5)Average parapet height is 0.0 ft. from modular parts which is intended for rooftop installation of solar photovoltaic(PV)panels;and has reviewed the U- 6)Wind speeds are LRFD values. builder Online tool.This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail,SOLARMOUNT 7)Attachment spacing(s)apply to a seismic design category E or less. STANDARD rail,and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information,data and analysis contained within are based on,and comply with the following codes and typical specifications: Design Responsibility: 1. 2020 Florida Building Code,by Florida Building Commission The U-Builder design software is intended to be used under the responsible charge of a registered design professional 2. Minimum Design Loads for Buildings and other Structures,ASCE/SEI 7-16 where required by the authority having jurisdiction.In all cases,this U-builder software should be used under the 3. 2018 International Building Code,by International Code Council,Inc.w/Provisions from SEAOC PV-2 2017. direction of a design professional with sufficient structural engineering knowledge and experience to be able to: 4. 2018 International Residential Code,by International Code Council,Inc.w/Provisions from SEAOC PV-2 2017. . Evaluate whether the U-Builder Software is applicable to the project,and 5. AC428,Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic(PV)Panels,November Understand and determine the appropriate values for all input parameters of the U-Builder software. 1,2012 by ICC-ES. 6. 2015 Aluminum Design Manual,by The Aluminum Association,2015 This letter certifies that the Unirac SM SOLARMOUNT Rails Flush,when installed according to the U-Builder engineering Following are typical specifications to meet the above code requirements: report and the manufacture specifications,is in compliance with the above codes and loading criteria. Design Criteria: Ground Snow Load=0-100(psf) This certification excludes evaluation of the following components: Basic Wind Speed=85-190(mph) 1) The structure to support the loads imposed on the building by the array;including,but not limited to:strength Roof Mean Height=0-60(ft) and deflection of structural framing members,fastening and/or strength of roofing materials,and/or the effects Roof Pitch=0-45(degrees) of snow accumulation on the structure. Exposure Category=B,C&D 2) The attachment of the SM SOLARMOUNT Rails to the existing structure. Attachment Spacing: Per U-builder Engineering report. 3) The capacity of the solar module frame to resist the loads. Cantilever: Maximum cantilever length is L/3,where"L"is the span noted in the U-Builder online This requires additional knowledge of the building and is outside the scope of the certification of this racking system. tool. DIGITAL SIGNATURE Clearance: 2"to 10"clear from top of roof to top of PV panel. If you have any questions on the above,do not hesitate to call. ��t\II111111/�� Tolerance(s): 1.0"tolerance for any specified dimension in this report is allowed for installation. Prepared by: ``� J��"KE N NSS~ti,FFi'�i Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. PZSE,Inc.—Structural Engineers S Landscape-PV Panel long dimension is parallel to ridge/eave line of roof and the PV No.73522 Roseville,CA _ _ panel is mounted on the long side. THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PAUL Portrait-PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel K.ZACHER,PE ON 01/20/2021 USING A SHA-1 AUTHENTICATION CODE. EXP.02/28/2023 is mounted on the short side. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED ''� �'+'o4OR10P:�' AND SEALED AND THE SHA-1 CATION CODE MUST BE VERIFIED ON ANY ELECTRONIC COPIES �� SS�ONA Ltt"`�G``` 01/20/2021 1478 Stone Point Drive,Suite 190, Roseville,CA 95661 1478 Stone Point Drive,Suite 190, Roseville,CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com T 916.961.3960 F 916.961.3965 W www.pzse.com Experience I Integrity I Empowerment Experience I Integrity I Empowerment