HomeMy WebLinkAboutPV Plans Stamped PHOTOVOLTAIC SYSTEM
CODES: CONSTRUCTION NOTES:
THIS PROJECT COMPLIES WITH THE FOLLOWING:
2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND Digitally
2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. Jose psigned by
2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENT Joseph J
2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING POSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY ARE h J Bravo
Date:
2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS MOUNTED. 2022.01.31
2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION IN Bravo 10:12:51
2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING ACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PER -07'00'
2020 7TH EDITION FLORIDA BUILDING CODE:ACCESSIBILITY SECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD.
2020 7TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2017 NATIONAL ELECTRIC CODE (NEC) DIG ALERT(811)TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANY
AS ADOPTED BY ST. LUCIE COUNTY EXCAVATION TAKING PLACE
PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM
DC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A).
SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH
VICINITY MAP: REQUIREMENTS OF ART. 690 OF THE 2017 NEC
THE MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFER
UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM
°°" °�B1rd hB1 SOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY)AND UL 1741 STANDARDS CLIENT:
r a CHRISTOPHER ROOTE
INSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK. EMT CONDUIT 8803 BROOKLINE AVENUE,FORT PIERCE,
ATTACHED TO THE ROOF USING CONDUIT MOUNT. FL 34951
AHJ:ST.LUCIE COUNTY
o k`"•ee•, UTILITY:FPL-FLORIDA POWER&LIGHT
• Pe•eai"e a° eeiae PHONE:(772)240-8945
8803 Bronkine Ave, erawiine n"e
on Pleroe,FL 34951
SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
_ SYSTEM SIZE(AC):15.200 kW @ 240V
n MODULES:65 X HANWHA QCELL:Q.PEAK
m oi•a "°sesoi"a r�°n°ni�ena DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
[Sill
A1A1° o." INVERTER 2:SOLAREDGE SE380OH-USRGM
x [Sill
SITE LOCATION
TABLE OF CONTENTS:
PV-1 SITE LOCATION
REVISIONS
PV-2 SITE PLAN NO. REVISED BY DATE
PV-2A ROOF PLAN WITH MODULES LAYOUT
PV-2B STRUCTURAL CALCULATIONS
PV-3 MOUNTING DETAILS
freedom
PV-4 THREE LINE DIAGRAM F O R E V E R
PV-5 CONDUCTOR CALCULATIONS FREEDOM FOREVERLLC
2619 CONSULATE DR SUITE 800,ORLANDO,
PV-6 EQUIPMENT&SERVICE LIST FL 32819
Tel:(800)385-1075
PV-7 LABELS GREG ALBRIGHT
PV-7A SITE PLACARD 'r
PV-8 OPTIMIZER CHART (�U�
PV-9 SAFETY PLAN CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
PV-10 SAFETY PLAN EC13008056
APPENDIX MANUFACTURER SPECIFICATION SHEETS
SITE LOCATION
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-1
LEGEND: BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'
THIS SYSTEM DESIGNED WITH:
WIND SPEED: 156
OBSTRUCTION WIND EXPOSURE: C BROOKLINE AVENUE
PIPE VENT
a MODULES (N)65 HANWHA QCELL: Q.PEAK DUO PROPERTY LINE
BLK-G6+/SC 340W
CONDUIT 177'-4"
® SETBACK
Ac FUSED AC
DISCONNECT
MsP MSP
PB3 JUNCTION
BOX o
INV INVERTER
Ln
UM UTILITY DRIVEWAY
METER ROOF AREA:2778 SO FT
LC LOAD CLIENT:
FL c
CENTER CHRISTOPHER ROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
FL 34951
AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
34'-0" PHONE:(772)240-8945
76'-8"
C? o
M M
LO LO
PV SYSTEM YSTEM:
22.100 kW-DC SYSTEM SIZE(DC):65 X 340=22.100 kW
ROOF LINE SYSTEM SIZE(AC):15.200 kW @ 240V
15.200 kW-AC MODULES:65 X HANWHA QCELL:Q.PEAK
El
OPTOIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
(E) DETACHED GARAGE [Sill
INVERTER 2:SOLAREDGE SE3800H-USRGM
[Sill
6)
L
REVISIONS
NO. REVISED BY DATE
0
freedom
(E) PATIO COVER FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
186'-6" FL 32819
(E) MAIN SERVICE PANEL Tel:(800)385-1075
INSIDE HOUSE (N)SOLAREDGE SE1140OH-USRGM [S11] GREGALBRIGHT
(E) UTILITY METER INVERTER WITH RAPID SHUTDOWN
(N) SOLAREDGE SE380OH-USRGM [S11] "" 7
(N) UTILITY FUSED DISCONNECT EATON
CONTRACTOR
DG223NRB (OR EQUIVALENT) CERTIFIED ELLEC RICALICONTRACTOR
(N) LOAD CENTER
(E)SHED EC13008056
SITE PLAN 1
SCALE: 1"-251 SITE PLAN
rFol
B NO: DATE: DESIGNED BY: SHEET:
20561 1/27/2022 C.A. PV-2
LEGEND: BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'
CHIMNEY THIS SYSTEM DESIGNED WITH:
PIPE VENT WIND SPEED: 156
WIND EXPOSURE: C
ATTACHMENTS S. M. Mehdi igitallysignedbyS.
Mehdi Zomorodian
MODULES Zomorodian pate:1022.01.31
(N)65 HANWHA QCELL: Q.PEAK DUO 5:15:26-06'00'
— RAFTERS BLK-G6+/SC 340W 2"X 4"TRUSSES @ 24"O.0
RAIL
FIRE ACCESS
® SETBACK PATHWAYS
AC FUSED AC
DISCONNECT
MS P MSP
JEs JUNCTION
BOX M ROOF AREA:2778 SO FT
PM PRODUCTION CLIENT:
METER CHRISTOPHER ROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
INV INVERTER FL 34951
AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
unn UTILITY METER
3'FSB PHONE:(772)240-8945
3'FSB
L_c LOAD CENTER LJ SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
MODULES:65 X HANWHA QCELL:Q.PEAK
m
m DUO BLK-G6+/SC 340W
EL OPTIMIZERS:65 X SOLAREDGE P340
PV SYSTEM M INVERTER 1:SOLAREDGE SE1140OH-USRGM
[Sill
22.100 kW-DC INVERTER 2:SOLAREDGE SE380OH-USRGM
15.200 kW-AC [Sill
JB
MSP
UM AC LC INV INV
REVISIONS
NO. REVISED BY DATE
FIRE ACCESS
PATHWAYS
(N)SOLAREDGE SE11400H-USRGM [S11]
INVERTER
.Q, freedom
(N) SOLAREDGE SE380OH-USRGM [S11] F O R E V E R
INVERTER FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG A�LhB�RIIG�HT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
ROOF PLAN NOTES:
1. EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNTS
SCALE: 1/8" = V-0" 2. ATTACHED CLAMPS AT 25% FROM THE EDGE AND 50% FROM THE CENTER OF THE MODULES ROOF PLAN WITH MODULES LAYOUT
3. JUNCTION BOX IS MOUNTED TO THE RAIL. JOB NO: DATE: DESIGNED BY: SHEET:
F120561F
/27/2022 C.A. PV-2A
ROOF DETAILS:
TOTAL ROOF AREA: 2778 SQ FT
ARRAY COVERAGE: 45.21%
SYSTEM DISTRIBUTED WEIGHT: 2.45 LBS
S-5!: PROTEA POINT-LOAD: 19.63 LBS
ROOF AREA STATEMENT CLIENT:
CHRISTOPHER ROOTE
ROOF MODULE QUANTITY ROOF PITCH ARRAY PITCH AZIMUTH ROOF AREA ARRAY AREA 8803 BROOKLINE AVENUE,FORT PIERCE,
FL 34951
1 32 18° 18' 181° 1215 SQ FT 618.24 SQ FT AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
2 33 180 180 10 1215 SQ FT 637.56 SQ FT PHONE:(772)240-8945
SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
MODULES:65 X HANWHA QCELL:Q.PEAK
DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
[Sill
INVERTER 2:SOLAREDGE SE380OH-USRGM
[Sill
REVISIONS
NO. REVISED BY DATE
. . freedom
C' FOR E V ER
FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG A�LhB�RIIGI HT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
ROOF DETAILS
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-2B
(N)HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W
UNIRAC SM LIGHT RAIL RACKING SYSTEM
ROOF ATTACHMENT
Mill IIIIIIIIIIIIIIIIIIIIIIIIII
II
IIIIIIIIIIII � � � � � � III III IIIIIII
IIII III
II = III
I T I I T I I T I I T I T I
IIIIIIIIIIIIIIII � � � � � III III IIIIIII
� IIII III
I � IIIII III
II � IIIIIIIIIIIIIIII � � � IIIIIIIIIIIIIIIIIIII
III � IIII IIIIIIIIIII � � � IIIIIIIIIIIIIIIIIIII
(E)METAL SEAMS CLIENT:
O.C. CHRISTOPHER ROOTE
12
C 8803 BROOKLINE AVENUE,FORT PIERCE,
FL 34951
AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
PARTIAL ROOF FRAMING PLAN PHONE:(772)240-8945
Scale: NTS
SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
MODULES:65 X HANWHA QCELL:Q.PEAK
DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
ISI1]
INVERTER 2:SOLAREDGE SE380OH-USRGM
(N) HANWHA QCELL: GROUNDING END/MID PROTEABRACKET [SI1]
Q.PEAK DUO BLK-G6+/ CLAMP
SC 340W UNIRAC SM LIGHT RAIL
l 1 PROTEABRACKET ( )
C7 CCC777 REVISIONS
NO. REVISED BY DATE
(E)TRAPEZOIDAL METAL 1"SELF TAPPING SCREW (E)TRAPEZOIDAL METAL
ROOF PROFILE ROOF PROFILE Qr freedom
2X4 TRUSS @ 24"O.C. FACTORY APPLIED F O R E V E R
EPDM WITH STICKY ADHESIVE FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG ALBRIGHT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
SOLAR PV ARRAY SECTION VIEW ATTACHMENT DETAIL
Scale: NTS Scale: NTS MOUNTING DETAILS
rFO120561
B NO: DATE: DESIGNED BY: SHEET:
1/27/2022 C.A. PV-3
BACKFEED FUSE SIZING
MAX. CONTINUOUS OUTPUT 63.50A @ 240V
63.50 X 1.25 = 79AMPS 80A FUSES -OK
STRING-2 STRING-1
17 HANWHA QCELL:Q.PEAK DUO BLK-G6+ 17 HANWHA QCELL:Q.PEAK DUO BLK-G6+
/SC 340W /SC 340W
SOLAREDGE P340 CLIENT:
POWER OPTIMIZERS (E)200A RATED CHRISTOPHER ROOTE
MAIN SERVICE PANEL 8803 BROOKLINE AVENUE,FORT PIERCE,
4-#10 AWG,THWN-2 1 PH,120/240V 60HZ FL 34951
r -- --- jDUO.LK-G6+
1-#8 EGC,THWN-2 E 200A/2P MAININ 3/4'OR ( ) BREAKER METERITY AHJ:ST.LUCIE COUNTY
LARGER EMT CONDUIT (END FED) UTILITY:FPL-FLORIDA POWER&LIGHT
PHONE:(772)240-8945
2-#10 AWG,PV W IRE STRING-17 HANWHA QCELL:Q.PESOLAREDGE P340 /SC 340POWER OPTIMIZERS
JUNCTION SYSTEM:
BOX (N)SOLAREDGE SYSTEM SIZE(DC):65 X 340=22.100 kW
SE1140OH-USRGM[SI1l SYSTEM SIZE(AC):15.200 kW @ 240V
INVERTER • MODULES:65 X HANWHA QCELL:Q.PEAK
E E E_____________ - I I WG,THWN-2 LISLINESIDETAPVIAULT I I j"3
(N)100A FUSEDLISTED CONNECTOR OPTOIMZERS+65 X SOLAREDGE P340
GC,THWN-2 AC DISCONNECTR LARGER EMT CONDUIT EATON DG223NRB(OR NVERTER 1:SOLAREDGE SE1140OH-USRGM
AD DEDICATED EQUIVALENT) • INVERTER 2:SOLAREDGE SE380OH-USRGM
OAD CENTER 2-80 AMP FUSESL---_---_ J I NI 2P TO UTILITY [SI1]
• • UNDERGROUND
2-#10 AWG,PV L_ —_—_ ------ FEED
1-#6 AWG IN FREE AIR OR (N)20N2P
IN
#8 AWG MUST BE IN EMT CONDUIT RAPID
6-#10 AWG,THWN-2 SHUTDOWN I I
SOLAREDGE P340 POWER 1-#8 EGC,THWN-2 SWITCH
OPTIMIZERS IN3/4"OR 3-#4 AWG,THWN-2 3-#4 AWG,THWN-2
LARGER EMT CONDUIT 1-#8 EGC,THWN-2 IN 314"OR LARGER EMT CONDUIT
STRING-4 IN 3/4"OR LARGER EMT CONDUIT
14 HANWHA QCELL:Q.PEAK DUO BLK-G6+ I
/SC 340W I REVISIONS
(N)SOLAREDGE I = NO. REVISED BY DATE
SE380OH-USRGM[Sill -
INVERTER I A TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDE
AC I TAP IN THE MAIN SERVICE PANEL.THIS IS DEPENDENT UPON SITE
CONDITIONS.
°C freedom
F O R E V E R
—————— JUNCTION I FREEDOM FOREVER LLC
L — BOX ------- 2619 CONSULATE DR SUITE 800,ORLANDO,
SOLAREDGE P340 RAPID FL 32819
POWER OPTIMIZERS SHUTDOWN Tel:(800)385-1075
2-#10 AWG,PV WIRE 2-#10 AWG,THWN-2 SWITCH 3-#10 AWG,THWN-2
1-#6 AWG IN FREE AIR OR 1-#8 EGC,THWN-2 1-#8 EGC,THWN-2 GREG ALBRIGHT
#8 AWG MUST BE IN EMT CONDUIT IN 3/4"OR IN 3/4"OR LARGER EMT
LARGER EMT CONDUIT CONDUIT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
NOTE:
CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED
ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT THREE LINE DIAGRAM
TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-4
WIRE SCHEDULE CLIENT:
CHRISTOPHER ROOTE
STARTING ADJUSTMENT MAXIMUM 8803 BROOKLINE AVENUE,FORT PIERCE,
STARTING TEMPERATURE ADJUSTED FL 34951
RACEWAY CONDUCTOR
AWG ALLOWABLE CURRENT CORRECTION FACTOR FOR CONDUCTOR CURRENT AHJ:ST.LUCIE COUNTY
#
EQUIPMENT WIRE LOCATION QTY. WIRE AMPACITY @ 90°C FACTOR APPLIED TO MORE THAN 3 AMPACITY APPLIED TO UTILITY:FPL-FLORIDA POWER&LIGHT SIZE CONDUCTORS 310.15(B)(2)(a) CONDUCTORS CONDUCTORS PHONE:(772)240-8945
310.15(B)(16) IN RACEWAY 310.15(B)(3)(a) @ 90°C IN RACEWAY
1 DC MODULE TO OPTIMIZER ROOF/FREE-AIR 2 10 40 13.15 1 1 40.00 16.44
2 DC OPTIMIZER TO JUNCTION BOX ROOF/FREE-AIR 2 10 40 15.00 1 1 40.00 18.75
3 DC JUNCTION BOX TO INVERTER 1 EXTERIOR WALL 6 10 40 15.00 1 0.8 32.00 18.75 SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
4 DC JUNCTION BOX TO INVERTER 2 EXTERIOR WALL 2 10 40 15.00 1 1 40.00 18.75 SYSTEM SIZE HA 1 HA C @ 240V
MODULES:65 X NW OCELL:O.PEAK
5 AC INVERTER 1 TO DEDICATED LOAD CENTER EXTERIOR WALL 3 6 75 47.50 1 1 75.00 59.38 DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
6 AC INVERTER 2 TO DEDICATED LOAD CENTER EXTERIOR WALL 3 10 40 16.00 1 1 40.00 20.00 INVERTER 1:SOLAREDGE SE1140OH-USRGM
[Sill
7 AC DEDICATED LOAD CENTER TO AC DISCONNECT EXTERIOR WALL 3 4 95 63.50 1 1 95.00 79.38 INVERTER 2:SOLAREDGE SE380OH-USRGM
[Sill
8 AC AC DISCONNECT TO POI EXTERIOR WALL 3 4 95 63.50 1 1 95.00 79.38
REVISIONS
NO. REVISED BY DATE
.Q. freedom
F O R E V E R
FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG A�LhB�RIIGI HT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
CONDUCTOR AMPACITY CALCULATIONS IN ACCORDANCE WITH NEC 690.8.
CONDUCTOR CALCULATIONS
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-5
BREAKER SIZES: SERVICE LIST:
60A PV BREAKER NONE
20A PV BREAKER
MATERIAL LIST:
OTY. PART PART# DESCRIPTION
65 MODULES 111-340 HANWHA QCELL:Q.PEAK DUO BLK-G6+/SC 340W
65 OPTIMIZERS 130-340 SOLAREDGE P340 POWER OPTIMIZER-FRAME MOUNTED MODULE ADD-ON
1 JUNCTION BOX 480-276 60OVDC NEMA 3R UL LISTED JUNCTION BOX
2 CONNECTORS 240-300 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(FEMALE)
2 ICONNECTORS 240-301 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(MALE)
1 INVERTER 120-113 SOLAREDGE SE1140OH-USRGM[SI1]240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN
1 INVERTER 120-383 SOLAREDGE SE380OH-USRGM[Sill 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN CLIENT:
1 COMBINER PANEL 151-100 100A DEDICATED LOAD CENTER CHRISTOPHER ROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
1 AC DISCONNECT 321-101 100A RATED 240VAC NEMA 3R UL LISTED FL 34951
2 FUSES 330-080 80A FUSE 1 PH 240VAC AHJ:ST.LUCIE COUNTY
1 FUSE REDUCER 330-510 10OA-60A FUSE REDUCER UTILITY:FPL-FLORIDA POWER&LIGHT
PHONE:(772)240-8940-8945
157 ROOF ATTACHMENT 1 240-401 S-51:PROTEA
32 RAIL 1 211-100 UNIRAC SM LIGHT RAIL 168 INCH(TOTAL 440 FEET NEEDED)
65 RAIL HARDWARE 1 261-517 BND T-BOLT AND NUT SS
69 MODULE CLAMPS 1 221-101 SM MIDCLAMP PRO DIRK
69 MODULE CLAMPS 1 221-202 SM ENDCLAMP PRO W/END CLAMP SYSTEM:
23 SPLICE 1 261-600 BND SPLICE BAR PRO SERIES MILL SYSTEM SIZE(DC):65 X 340=22.100 kW
69 ML HA
PE MOUNT 1 261-510 MICRO MNT BND TBOLT SS SYSTEM SIZE 1 C @ 240V
MODULES:65 X NWHA QC ELL:Q.PEAK
18 ACCESSORIES 1 211-202 E-BOSS CONDUIT MOUNT COMP KIT DUO BLK-G6+/SC 340W
36 ACCESSORIES 1 211-200 E-BOSS RAIL TRAY OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
12 ACCESSORIES 1 211-206 E-BOSS BRIDGE TRAY [SI1]
20 ACCESSORIES 1 211-207 E-BOSS BRIDGE CLIPS INVERTER 2:SOLAREDGE SE380OH-USRGM
64 GROUNDING LUG 1 260-300 BURNDY GROUND WEEB-LUG [SI1]
111 L-FOOT 1 241-100 UNIRAC L-FOOT SERRATED W(T-BOLT CLEAR(KIT)
REVISIONS
NO. REVISED BY DATE
freedom
F O R E V E R
FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG ALBRIGHT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
EQUIPMENT&SERVICE LIST
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-6
WARNING: "WARNING" NOTES:
POWER SOURCEOUTPUT DUAL POWER SOURCES
1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324
Y MARKINGS SHOWN HEREON.
CONNECTION • 1 SOURCE IS PHOTOVOLTAIC2. ALL MARKING SHALL CONSIST OF THE FOLLOWING:
1 • NOT RELOCATERATED • 1 AMPS
A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR
MACHINE PRINTED LETTERS OR ELECTRO-PLATING.
OVERCURRENT DEVICE. AC NORMALOPERATING VOLTAGE1 VOLTS B. RED BACKGROUND COLOR WHITE TEXT AND LINE
705.12(B)(2)(3)(b) WORK.
C. ARIAL FONT.
690.54 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN
SOLAR PV SYSTEM EQUIPPED THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE
HAND-WRITTEN.
WITH RAPID SHUTDOWN 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT
WITH POP-RIVETS OR SCREWS
TURN RAPID
SHUTDOWN SWITCH TO
THE "OFF" POSITION TO
SHUT DOWN PV SYSTEM RESPONDEREMERGENCY
AND REDUCE SHOCK SOLARTHIS ■V SYSTEM ■ ■
ED
HAZARD IN THE ARRAY WITH RAPID
690.56(C)(1)(A) is CLIENT:
ELECTRICAL SHOCK HAZARD. CHRISTOPHER ROOTE
TURN RAPID SHUTDOWN8803 BROOKLINE AVENUE,FORT PIERCE,
SWITCH TO THE "OFF" TERMINALS • : • 1 • ` 1 1 FL34951
AHJ:ST.LUCIE COUNTY
POSITION. o nPELECTaic 1 MAY - 1 OPEN POSITION. UTILITY:FPL-FLORIDA POWER&LIGHT
J PVPANe s ' PHONE:(772)240-8945
"IIII■ a ONLY CONDUCTORS INSIDE
BUILDING OR OFF THE 690.13 (B)
ROOF WILL SHUT DOWN SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
NFPA 11.12.2.1.1.1.2 MAXIMUM VOLTAGE: °1 SYSTEM SIZE(AC):15.200 kW @ 240V
MAXIMUM CIRCUIT CURRENT: f . MODULES:65 X HANWHA QCELL:Q.PEAK
Q DUO BLK-G6+/SC 340W
RATED • CURRENT • OPTIMIZERS:65 X SOLAREDGE P340
■V SYSTEM / DISCONNECT
OUTPUT ■ ■ I THE CONTROLLER OR1 f) I [S 1]
RATED RTER 1:SOLAREDGE SE1140OH-USRGM
ENT
AC ■ 1 ` ■ INVERTER 2:SOLAREDGE SE380OH-USRGM
1 NORMAL
■ 1 OPERATING
■ ■ ' VOLTAGE
' 240
VOLTS [SI1]
690.53
690.15,690.54 ARRAY
RAPID SHUTDOWN SWITCH FOR I I
SOLAR� - � INVERTER � REvlsloNs
V SYSTEM DC J/B NO. REVISED BY DATE
690.56(C)(3) if you have any questions about your system,please call
our Customer Support Team at L
EMERGENCYRESPONDER
888.557.6431 1 NEC 690.31(G)(3)&(4) '�� freedom
THIS • 1 ■ ■ EQUIPPED
■ , or visit freedomforever.com/customer-service �.' F 0 R E V E R
J FREEDOM FOREVER LLC
WITH RAPID
■ , , • This solar PV system was Installed by "WARNING" 2619 CONSULATE DR SUITE 800,ORLANDO,
L_ - - _J — — — FL32819
treedom° PHOTOVOLTAIC POWER SOURCE Tel:(800)385-1075
r oar V e s GREG ALBRIGHT
•w..e.m ray...,i..noe..e o.,no m.u.,...u.p.....iR�,no,.mm,n,.m.TURN RAPID SHUTDOWN n.e. EVERY 10'ON CONDUIT AND ENCLOSURES
SWITCH TO THE "OFF" SOLARELE
PV PANELSLS
CONTRACTOR LICENSE:
POSITION TO SHUT DOWN CERTIFIED ELECTRICAL CONTRACTOR
ENTIRE PV SYSTEM EC13008056
LABELS
NFPA 11.12.2.1.1.1.1
JOB NO: DATE: I DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-7
CAUTION .
POWER TO THIS BUILDING IS
ALSO SUPPLIED FROM THE
FOLLOWING SOURCES WITH CLIENT:
DISCONNECTS AS SHOWN CH HERROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
FL 34951 34951
AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
PHONE:(772)240-8945
BROOKLINE AVENUE
65 PV
MODULES
SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
MODULES:65 X HANWHA QCELL:Q.PEAK
DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
Sill
INVERTER 2:SOLAREDGE SE380OH-USRGM
SI1l
MAIN SERVICE PANEL INVERTER EQUIPPED
WITH RAPID SHUTDOWN
UTILITY METER INVERTER EQUIPPED
AC DISCONNECT WITH RAPID SHUTDOWN
REVISIONS
COMBINER PANEL NO. REVISED BY DATE
WARNING
TURN OFF PHOTOVOLTAIC AC DISCONNECT
PRIOR TO WORKING INSIDE PANEL Nfreedom
F O R E V E R
FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG ALBRIGHT
NOTES:
-
1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324 MARKINGS SHOWN HEREON.
CONTRA, E:
2. ALL MARKING SHALL CONSIST OF THE FOLLOWING: LICENS
CERTIFIED ELECTRICAL CONTRACTOR
A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING. FC13008056
B. RED BACKGROUND COLOR WHITE TEXT AND LINE WORK.
C. AERIAL FONT.
3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN. SITE PLACARD
4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS.
JOB NO: DATE: I DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-7A
1 -10 11 -20 21 -30 31 -40 41 -50 51 -60 SOLAREDGE OPTIMIZER CHART
1
2
3
CLIENT:
CHRISTOPHER ROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
FL 34951
4 AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
PHONE:(772)240-8945
5 SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
MODULES:65 X HANWHA QCELL:Q.PEAK
DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
6 INVERTER 1:SOLAREDGE SE1140OH-USRGM
[Sill
INVERTER 2:SOLAREDGE SE380OH-USRGM
FFFF [Sill
7 a
REVISIONS
NO. REVISED BY DATE
8
.Q. freedom
9 �' FOREVER
FREEDOM FOREVERLLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
GREG ALBRIGHT
10 —
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
EC13008056
OPTIMIZER CHART
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-8
SAFETY PLAN MARK UP KEY
INSTRUCTIONS:
1. USE SYMBOLS IN KEY TO MARK UP THIS SHEET. OP PERMANENT ANCHOR
2. SAFETY PLAN MUST BE MARKED BEFORE JOB
STARTS AS PART OF THE PRE-PLAN
3. DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE OT TEMPORARY ANCHOR
& MAKE NOTES ON THE JHA SHEET
IN CASE OF EMERGENCY IL INSTALLER LADDER
NEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINIC FB] JUNCTION / COMBINER BOX
NAME: IS] STUB-OUT
ADDRESS:
SKYLIGHT
SAFETY COACH CONTACT INFORMATION z
NAME: NO LADDER ACCESS (STEEP CLIENT:
CHRISTOPHER ROOTE
8803 BROOKLINE AVENUE,FORT PIERCE,
GRADE OR GROUND LEVEL
FL 349514951
PHONE NUMBER: [] OBSTRUCTIONS) AHJ:ST.LUCIE COUNTY
UTILITY:FPL-FLORIDA POWER&LIGHT
PHONE:(772)240-8945
ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THE RESTRICTED ACCESS
SAFETY PLAN AND SIGN INDICATING THAT THEY ARE
AWARE OF THE HAZARDS ON-SITE AND THE PLAN FOR Fla
WORKING SAFELY. CONDUIT SYSTEM:
SYSTEM SIZE(DC):65 X 340=22.100 kW
SYSTEM SIZE(AC):15.200 kW @ 240V
NAME SIGNATURE MODULES:65 X HANWHA QCELL:Q.PEAK
�As GAS SHUT OFF DUO BLK-G6+/SC 340W
OPTIMIZERS:65 X SOLAREDGE P340
INVERTER 1:SOLAREDGE SE1140OH-USRGM
Sill
Hz0 WATER SHUT OFF INVERTER2:SOLAREDGE SE380OH-USRGM
[SI1]
O SERVICE DROP
O POWER LINES
REVISIONS
NO. REVISED BY DATE
�Qr freedom
F O R E V E R
FREEDOM FOREVER LLC
2619 CONSULATE DR SUITE 800,ORLANDO,
FL 32819
Tel:(800)385-1075
DATE: TIME: GREG ALBRIGHT
CONTRACTOR LICENSE:
CERTIFIED ELECTRICAL CONTRACTOR
FC13008056
SAFETY PLAN
JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-9
JOB HAZARD ANALYSIS
Crew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site Capture
Ladder Access • Crew leader responsible for communication with the client: Heat Related Illness Prevention NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE
• Ladders must be inspected before each use. I I Employees shall have access to potable drinking water that is (add as many as necessary by using additional sheets)
• Extension ladders must be set up on a firm and level surface at Client and public is excluded from work area by barricades (N/A, fresh, pure, and suitably cool. The water shall be located as
a 4-to-1 rise to run angle(or 75 degrees)and the top must be Yes, No): close as practicable to the areas where employees are working. Define the Hazard: Method/steps to prevent incident:
secured to the structure. Extension style ladders placed on Water shall be supplied in sufficient quantity at the beginning of
uneven, loose or slippery surfaces must additionally have the Training and Pre-Job Safety Briefing the work shift to provide at least one quart per employee per
base firmly anchored or lashed so the base will not slip out. • All employees onsite shall be made aware of the specific hazards hour for drinking for the entire shift. Employees may begin the
• Extension ladders must be used with walk-through devices or of this project and review this HJA during a pre-job briefing, and shift with smaller quantities of water if they identify the location Define the Hazard: Method/steps to prevent incident:
the ladder must extend 36"above the stepping off point. their signature indicates awareness of site conditions and the and have effective means for replenishment during the shift to
• A-frame ladders must only be climbed with the ladder spreader plan to eliminate any hazards identified prior to and during the allow employees to drink on quart or more per hour. The
bars locked in the open position;A-frame ladders shall not be project. frequent drinking of water shall be encouraged.
climbed while in the closed position (ex, closed and used while • Shade shall be present when temperature exceeds 80 degrees
leaned against a structure). • Crew leader(name/title): Fahrenheit. When the outdoor temperature in the work exceeds Define the Hazard: Method/steps to prevent incident:
• Additional notes: 1 80 degrees Fahrenheit, employees shall have and maintain one
• Crew member(name/title): or more areas with shade at all times.
Mobile Equipment • New employees must be acclimatized. New employees will be
• Only Qualified operators will operate equipment; operators must Crew member(name/title): monitored by their Crew Leader(site supervisor)for the first two
maintain a certification on their person for the equipment being (2)weeks of employment or longer when necessary. Define the Hazard: Method/steps to prevent incident:
operated. • Crew member(name/title): • Employees will be allowed and encouraged to implement
• Type(s)of mobile equipment(Type/Make/Model): I scheduled breaks during each shift. Employees must take
• Crew member(name/title): cool-down breaks in the shade any time they feel the need to do
• Qualified operator(s): so to protect them from overheating. Supervisors are
• Crew member(name/title): REQUIRED to allow employees any break period they need
Material Handling and Storage during high heat conditions. CLIENT:
CHRISTOPHER ROOTE
• Materials will be staged/stored in a way that does not present a Airborne Contaminants: • Cool Vests are encouraged for all employees at all times during 8803 BROOKLINE AVENUE,FORT PIERCE,
hazard to client, personnel or public. Materials stored on the • Asbestos-containing (Transite) piping (ACP)-Do not disturb periods of high heat. FL 34951
AHJroof will be physically protect from failing or sliding off. move, drill, cut fracture, etc. • Identify the location of the closet Occupational/industrial ational/Industrial Clinic UTILITY:
ST:LUCIE COUNTY
p Y Y p g g ( ) Y p UTILITY:FPL-FLORIDA POWER&LIGHT
• Asbestos-containing thermal insulation (ACI)and or Hospital in case a crew member becomes ill. PHONE:(772)240-8945
Fall Protection Asbestos-containing duct wrapping (ACW)-do not disturb, no
• A site-specific plan for fall prevention and protection is required attic or crawlspace access is allowed if work to be performed What is the specific plan to provide and replenish sufficient water for
prior to starting work and must remain onsite at all times until could cause exposure to personnel, client or public. all employees on site?
work is complete; a fall rescue plan must be outlined and • If offsite replenish is necessary,where will you go to replenish
discussed among the crew prior to work start. • If yes, list specific tasks and protection in place: water(location/address): SYSTEM:
• First-person-Up (FPU) must install their anchor and connect SYSTEM SIZE(DC):65 X 340=22.100 kWSYSTEM SIZE(AC):15.200 kW @ 240V
before any other task, including installing other anchors. The • Who will replenish the drinking water(name): MODULES:65 x HANWHA oCELL:O.PEAK
( muse e on person on a roof DUO BIKERS+/SC
Last-Person-Down LPD) t b the only p OPTIMIZERS:65 X SOLAREDGE P340
uninstalling fall protection. INVERTER 1:SOLAREDGE SE1140OH-USRGM
• FPCP name and title): Restroom facilities
[Sill
( ) INVERTER 2:SOLAREDGE SE3800H-USRGM
• Employees shall have access to restroom facilities with [Sill
• FPU and LPD (name and title): hand-washing stations. Use of onsite restroom is at the client's
discretion (location is annotated below). If client does not give
Electrical Safety permission, location of suitable restroom facilities with
• The Electrical Qualified Person (EQP)is required onsite to hand-washing stations offsite will be provided.The onsite
perform electrical work. supervisor will identify location and make arrangements to
• All electrical work will be performed with equipment in an ensure all employees have access at any point.
electrically safe condition (de-energized)unless approval has • Restroom facilities will be(circle one): Onsite-Offsite REVISIONS
NO. REVISED BY DATE
been granted prior to work. Weather and Environment • If Offsite, add location name and address:
• Service drops and overhead electrical hazards will be indentified • The site supervisor shall forecast the weather conditions at the
and protected from contact, as neccessary. job site, prior to crew arrival, in order to mitigate any hazards Incident Reporting Procedure
• EQP(name and tile): associated with inclement weather(heat, cold,wind, rain, etc.) Contact your Site Supervisor ((��
• The site supervisor will utilized a portable wind meter Name: Q* freedom
Public Protection (anemometer)to verify actual onsite wind conditions, by checking F O R E V E R
• The safety of the Client and Public must be maintained at all at the ground and on any elevated work surface(ex, rooftop) Phone: FREEDOM FOREVER LLC
times. prior to work start, at midday and prior to solar panel staging on a 2619 CONSULATE DR SUITE 800,ORLANDO,
819
• The Client and the Public shall be prevented from entering the roof. . 80 )385-
p g Contact our Manager Tel:(800)385-1075
work zone through the use of barriers and/or signage, as Elevated work involving the moving or maneuvering of solar Name: GREG ALBRIGHT
required. panels shall cease at 25mph (sustained wind)until wind
• Company, Client and Public property shall be protected from subsides. Phone:
falling objects. Forecasted weather maximum temp(degrees f):
• Pets(including dogs)shall be secured by their owners prior to Contact your Site Supervisor CONTRACTOR LICENSE:
work start. Name: CERTIFIED ELECTRICAL CONTRACTOR
• The Client should not leave pets,family members, or others in EC13008056
charge or care of Employees, Contractors, or Temporary Phone:
Workers.
With:Your full name, phone number, office location, brief description SAFETY PLAN
Of what happen and when. JOB NO: DATE: DESIGNED BY: SHEET:
F120561 1/27/2022 C.A. PV-10
powered by MECHANICAL SPECIFICATION
il LIM ILIVI ka D U a Format 68.5 x 40.6 x 1.26 in(including frame)
(1740 x 1030 x 32mm) 58.5°(17406. mm
38.68"(980 mm) 15.0°(380 mm�
Weight 43.9 1 bs(19.9kg)
Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass =45.3-(l 0mm) _
with anti-reflection technology 1 1
4 x Grounding points a 0.12'i"(4.5 mm) Freme
Back Cover Composite film 38.82"(981mm)
Frame Black anodized aluminum
® aos•ilo3o mm)
- Cell 6 x 20 monocrystalline Q.ANTUM solar half cells
Junction Box 2.09-3.98 x 1.26-2.36 x 0.59-0.71in(53-101 x 32-60 x
15-18mm),Protection class IP67,with bypass diodes i45.3"(ll5omm)
Cable 4 Ml Solar cable;(+)s:45.3 in(1150 ml(-)>:45.3 in(1150 mm) 1 8-Drem4g<hpl«
Connector Staubli MC4,Hanwha Q CELLS HQC4,Amphenol UTX, 4'M...tl,94 (DETAiLA)
Renhe 05-6,Tongling TL-CableOlS,JMTHY JM601;IP68 or z5°(32 mmi DETAiLA 0.630•'(15mm)
Friends PV2e,IP67 0.955"(24.6 mm)T T0.335'(8.5 mm)
. • = • ELECTRICAL CHARACTERISTICS
POWER CLASS 330 335 340 345
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW)
Power atMPPI PMPP [W] 330 335 340 345
. OCELLS E Short Circuit Current' Isc [A] 10.41 10.47 10.52 10.58
• . Open Circuit Voltage' VGc IV] 40.15 40.41 40.66 40.92
TOP BRAND IV
E Current at MPP impp [A] 9.91 9.97 10.02 10.07
- �
4uaiity restea Voltage at MPP vmpp IV] 33.29 33.62 33.94 34.25
�naeM
Efficiency' q [%] >_18.4 >_18.7 >_19.0 >_19.3
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2
ww.VDEinfp.7
ID.400s25s7 Power at MPP PMPP [W] 247.0 250.7 254.5 258.2
E Short Circuit Current Isc [A] 8.39 8.43 8.48 8.52
E Open Circuit Voltage VGc IV] 37.86 38.10 38.34 38.59
c
Q.ANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY Current at MPP impp [A] 7.80 7.84 7.89 7.93
Higher yield per surface area,lower BOS costs,higher Voltage at MPP vmpp IV] 31.66 31.97 32.27 32.57
power classes,and an efficiency rate of up to 19.5%. 'Measurement tolerances PMpp±3%;13c;VGc±5%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5
Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE
INNOVATIVE ALL-WEATHER TECHNOLOGY
- At least 98%of nominal power during �>s I � � i
Optimal yields,whatever the weather with w - o
f
P Y u °. 5wryra�eb�f ,wa�M,
first year.Thereafter max.0.54% w
excellent low-light and temperature behavior. wg ° degradation per year.At least93.1%
of nominal power up to 10 years.At
z ° least 85%of nominal power up to v,
ENDURING HIGH PERFORMANCE `� ° 25years. a 90 -L 1 J -+
�- z. u
Long-term yield security with Anti LID and Anti PID Technologyl, o All data within measurement toleranc- v 3° z
Hot-Spot Protect and Traceable Quality Tra.QT"^ as.Full warranties in accordance with a °° °°° ^°° °°° °°° woo
the warranty terms of the Q CELLS IRRADIANCE[W/m-]
o ,e sales organization of your respective o
�
(/I EXTREME WEATHER RATING wn n9n,49,od�a 3 Poma :° :° country.
11
YEARS Typical module performance under low irradiance conditions in o
pa=m-°m14 ce=��3=wem5„2o�4�High-tech aluminum alloy frame,certified for high snow comparison to STC conditions(25°C,1000 W/m2)
7/ (5400 Pa)and Wind loads(4000 Pa). TEMPERATURE COEFFICIENTS 6
Temperature Coefficient of I_ a [%/K] +0.04 Temperature Coefficient of VGc [i [%/K] -0.27
A RELIABLE INVESTMENT Temperature Coefficient of PMpp y [%/K] -0.36 Normal Module Operating Temperature NMOT [°F] 109±5.4(43±3°C) Y
Inclusive 25-year product warranty and 25-year o
linear performance warranty2. PROPERTIES FOR SYSTEM DESIGN
Maximum System Voltage V5.3 IV] 1000(IEC)/1000(UL) Safety Class II o
STATE OF THE ART MODULE TECHNOLOGY Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 1703 C(IEC)/TYPE 2(UL) 11
r Q.ANTUM DUO combines cutting edge cell separation Max.Design Load,Push/PUII3 [Ibs/ft2] 75(360OPa)/55(2667Pa) Permitted Module Temperature -40°F up to+185°F D
and innovative wiring with Q.ANTUM Technology. on Continuous Duty (-40°C up to+85°C)
Max.Test Load,Push/Pull3 [Ibs/ft2] 113(540OPa)/84(4000Pa)
3 See Installation Manual
I APT test conditions according to IEC/TS 62804-1:2015,method B(-1500 V,168 h)
2 See data sheet on rear for further information -_
QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION
UL 1703,VIDE Quality Tested,CE-compliant,IEC 61215:2016,IEC 61730:2016, Number of Modules per Pallet 32 °
Application Class II,U.S.Patent No.9,893,215(solar cells) Number of Pallets per 53'Trailer 28
® Number of Pallets per 40'HC-Container 24 0
THE IDEAL SOLUTION FOR: pVE E Ss
c�nus Pallet Dimensions(LxWxH) 71.5 x 45.3 x 48.0 in(1815 x 1150 x 1220mm) N
Rooftop arrays on °' Pallet Weight 1505lbs(683kg)
® residential buildings
Ljl� Note:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use
of this product.
CELLS Hanwha CELLS ,Inc.
Engineered in Germany 400 Spectrum Centerer Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiryQus.q-cells.com I WEB www.q-cells.us
Power Optimizer
MV For North America
Power Optimizer P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505
O P340 P370
For North America Optimizer model 32 (for high- (for higher- P400 P405 P485 P505
power
(typical module (for 6 -cle power 60 and 72-
P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 •• •' voltagell voltage
modules)
mINPUT
Rated Input DC Powerni 320 1 350 370 400 40S 485 505 W
Absolute Maximum Input Voltage 48 60 80 60 125i2i 830 Vdc
(Voc at lowest temperature)
MPPT Operating Range 8-48 8-60 8-80 8-60 12.5-105 12.5-83 Vdc
O Maximum Short Circuit Current 11 11.02
(Isc) 11 10.1 11.75 11 14 Adc
Maximum DC Input Current 13.75 12.5 14.65 12.5 17.5 Adc
25 Maximum Efficiency 99.5
Weighted Efficiency 98.8 98.6 %
YEAR Overvoltage Category II
WARRANTY OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER)
Maximum Output Current 15 Adc
Maximum Output Voltage 60 85 Vdc
V7ARRAN
OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF)
Safety Output Voltage per Power 1±0.1 Vdc
Optimizer
STANDARD COMPLIANCE
N EMC FCC Part15 Class 3,IEC61000-6-2,IEC61000-6-3
Safety IEC62109-1(class II safety),UL1741
Material UL94 V-0,UV Resistant
ROHS Yes
INSTALLATION SPECIFICATIONS
Maximum Allowed System 1000 Vdc
Voltage
Compatible inverters All SolarEdge Single Phase and Three Phase inverters
129x153x33.5 129x153x29.5 129x162x59 TrimDimensions(WxLxH) 129x153x27.5/5.1x6x1.1 /5.1x6x1.3 /S.1x6x1.16 129x159x49.5/5.1x6.3x1.9 /5.1x6.4x2.3 /in
Weight(including cables) 630/1.4 750/1.7 655/1.5 845/1.9 1064/2.3 gr/lb
Input Connector MC4s) Single or dual MC4i3i
MC4t3n"i
Input Wire Length 0.16/0.52 0.16 or 0.9 0.16/0.52 m/ft
/0.52 or 2.95
Output Wire Type/Connector Double Insulated/MC4
Output Wire Length 0.9/2.95 1.2/3.9 m/ft
PV power optimization at the module-level Operating TemperatureRangeib 40to+85/-40to+185 -C/°F
Protection Rating IP68/Type 6P
Relative Humidity 0-100 %
/ Specifically designed to work with SolarEdge 1 Fast installation with a single bolt (1)Rated power of the module at STC will not exceed the optimizer"Rated Input DC Power".Modules with up to+5%power tolerance are allowed
(2)NEC 2017 requires max input voltage be not more than 80V
inverters (3)For other connector types please contact SolarEdge
(4)For dual version for parallel connection of two modules use P485-4NMDMRM.In the case of an odd number of PV modules in one string,installing one P485 dual version power optimizer connected to
/ Next generation maintenance with module- one PV module.When connecting a single module seal the unused input connectors with the supplied pair of seals
<) to 25°/D more energy level monitoring (5)Longer inputs wire length are available for use.For 0.9m input wire length order P401-xxxLxxx
p gY (6)For ambient temperature above+85°C/+1857 power de-rating is applied.Refer to Power Optimizers Temperature De-Rating Technical Note for more details
/ Superior efficiency (99.5%) / Meets NEC requirements for arc fault DesignPV System • _ . Three Phase for
protection (AFCI) and Photovoltaic Rapid SolarEdge
/ Mitigates all types of module mismatch losses, Shutdown System PVRSS P320,P340,P370,
Y ( ) Minimum String Length 8 10 18
from manufacturing tolerance to partial (PowerOptimizers> P400,P401
P405,P485,P505 6 8 14
shading / Module-level voltage shutdown for installer Maximum String Length(Power Optimizers) 25 25 50t9i
and firefighter safety 5700 T(000 wit'
/ Flexible system design for maximum space Maximum Power per String SE7600-US-SE11400- 5250 600000) 12750(") W
us>
utilization Parallel Strings of Different Lengths or Orientations Yes
(7) For detailed string sizing information refer to:http://www.solaredge.com/sites/default/files/string_sizing-na.pdf
(8)It is not allowed to mix P405/P485/P505 with P320/P340/P370/P400/P401 in one string
(9)A string with more than 30 optimizers does not meet NEC rapid shutdown requirements;safety voltage will be above the 30V requirement
(10)For 208V grid:it is allowed to install up to 6,500W per string when the maximum power difference between each string is 1,000W
(11)For 277/480V grid:it is allowed to install up to 15,000W per string when the maximum power difference between each string is 2,000W
solaredge.com solar=@@
S t;rtra Technologies Ltd.All rights reserved.rk,SOLAREDGE,the SolarEdge logo,OPTIMIZED BY 0000 SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc. (60u. Ro u
All other trademarks mentioned herein are trademarks of their respective owners.Date:12/2021 DS-000044-1.3-NA.Subject to change without notice. C n
Intertek
Single Phase Inverter
P=4 with HD-Wave Technology for North America
SE3000H-US / SE380OH-US / SE5000H-US / S E6000H-US/S• n le Phase Inverter Z SE760OH-US / SE10000H-US SE1140OH-US
l< OUTPUT
with HD-Wave Technology
m Rated AC Power Output 3000 3800 @ 208V 5000 5000 @ 208V 7600 0000 10000 @ 208V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
for North America Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / AC Output Voltage Min. Nom. Max. Vac
(211-240-264)
AC Output Voltage Min.-Nom.-Max. Vac
SE760OH-US / SE10000H-US / SE1140OH-US L.'..' (183-208-229)
r12-215 AC Frequency(Nominal) 59.3-60-6051i Hz
Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A
YEAR-..= L"1 Current @240V
solar
�-���-wOVe Maximum Continuous Output
Current @208V 16 24 48.5 A
UnGFDI Threshold 1 A
solar : U Utility Monitoring,Islanding Protection, Yes
Country Configurable Thresholds
INPUT
Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W
Maximum DC Power @208V - 5100 - 7750 - - 15500 W
Transformer-less,Ungrounded Yes
Maximum Input Voltage 480 Vdc
Nominal DC Input Voltage 380 400 Vdc
~ Maximum Input Current @240VI21 8.5 10.5 13.5 16.5 20 27 30.5 Adc
n Maximum Input Current @208VI�1 - 9 13.5 - 27 Adc
Max.Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
a Ground-Fault Isolation Detection 600kn Sensitivity
7 � Maximum Inverter Efficiency 99 99.2 °k
CEC Weighted Efficiency 99 99 @ 240V %
98.5 @ 208V
a Nighttime Power Consumption <2.5 W
1 1W ! ADDITIONAL FEATURES
Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional)
Revenue Grade Data,ANSI C12.20 Optional"'
Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect
Optimized installation with HD-Wave technology 2017690.12
p 9Y STANDARD COMPLIANCE
Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-07
Specifically designed to work with Extremely small Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI)
power optimizers Emissions FCC Part 15 Class B
INSTALLATION SPECIFICATIONS
/ Record-breaking efficiency Built-in module-level monitoring AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG
DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG
/ Fixed voltage inverter for longer strings / Outdoor and indoor installation AWG Range
Dimensions with Safety Switch 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/
(HxWxD) mm
/ Integrated arc fault protection and rapid shutdown for Optional: Revenue grade data,ANSI C12.20 Weight with Safety Switch 22/10 25.1/11.4 26.2/11.9 38.8/17.6 Ib/kg
NEC 2014 and 2017, per article 690.11 and 690.12 Class 0.5 (0.5%accuracy) Noise <25 1 <50 dBA
Cooling Natural Convection
UL1741 SA certified, for CPUC Rule 21 grid Operating Temperature Range -13 to+140/-25 to+6&4)(-40°F/-40°C option)"'
compliance Protection Rating NEMA 4X(Inverter with Safety Switch)
0)For other regional settings please contact SolarEdge support
¢)A higher current source may be used;the inverter will limit its input current to the values stated
s o 1 a r ai Revenue grade inverter P/N ion refer to:h 0NNC2
1^1 For power de-rating information refer to:https://wwwsolaredge.com/sites/default/files/se-temperature-Berating-note-na.pdf
so a red g e.co m W ts)-40 version P/N:SExxxxH-US000NNU4
O SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S
other trademarks mentioned herein are trademarks of their respective owners.Date:03/2019N01/ENG NAM.Subject to change without notice.
Single Phase Inverter
P=4 with HD-Wave Technology for North America
SE3000H-US / SE380OH-US / SE5000H-US / S E6000H-US/S• n le Phase Inverter Z SE760OH-US / SE10000H-US SE1140OH-US
l< OUTPUT
with HD-Wave Technology
m Rated AC Power Output 3000 3800 @ 208V 5000 5000 @ 208V 7600 0000 10000 @ 208V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
for North America Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / AC Output Voltage Min. Nom. Max. Vac
(211-240-264)
AC Output Voltage Min.-Nom.-Max. Vac
SE760OH-US / SE10000H-US / SE1140OH-US L.'..' (183-208-229)
r12-215 AC Frequency(Nominal) 59.3-60-6051i Hz
Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A
YEAR-..= L"1 Current @240V
solar
�-���-wOVe Maximum Continuous Output
Current @208V 16 24 48.5 A
UnGFDI Threshold 1 A
solar : U Utility Monitoring,Islanding Protection, Yes
Country Configurable Thresholds
INPUT
Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W
Maximum DC Power @208V - 5100 - 7750 - - 15500 W
Transformer-less,Ungrounded Yes
Maximum Input Voltage 480 Vdc
Nominal DC Input Voltage 380 400 Vdc
~ Maximum Input Current @240VI21 8.5 10.5 13.5 16.5 20 27 30.5 Adc
n Maximum Input Current @208VI�1 - 9 13.5 - 27 Adc
Max.Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
a Ground-Fault Isolation Detection 600kn Sensitivity
7 � Maximum Inverter Efficiency 99 99.2 °k
CEC Weighted Efficiency 99 99 @ 240V %
98.5 @ 208V
a Nighttime Power Consumption <2.5 W
1 1W ! ADDITIONAL FEATURES
Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional)
Revenue Grade Data,ANSI C12.20 Optional"'
Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect
Optimized installation with HD-Wave technology 2017690.12
p 9Y STANDARD COMPLIANCE
Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-07
Specifically designed to work with Extremely small Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI)
power optimizers Emissions FCC Part 15 Class B
INSTALLATION SPECIFICATIONS
/ Record-breaking efficiency Built-in module-level monitoring AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG
DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG
/ Fixed voltage inverter for longer strings / Outdoor and indoor installation AWG Range
Dimensions with Safety Switch 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/
(HxWxD) mm
/ Integrated arc fault protection and rapid shutdown for Optional: Revenue grade data,ANSI C12.20 Weight with Safety Switch 22/10 25.1/11.4 26.2/11.9 38.8/17.6 Ib/kg
NEC 2014 and 2017, per article 690.11 and 690.12 Class 0.5 (0.5%accuracy) Noise <25 1 <50 dBA
Cooling Natural Convection
UL1741 SA certified, for CPUC Rule 21 grid Operating Temperature Range -13 to+140/-25 to+6&4)(-40°F/-40°C option)"'
compliance Protection Rating NEMA 4X(Inverter with Safety Switch)
0)For other regional settings please contact SolarEdge support
¢)A higher current source may be used;the inverter will limit its input current to the values stated
s o 1 a r ai Revenue grade inverter P/N ion refer to:h 0NNC2
1^1 For power de-rating information refer to:https://wwwsolaredge.com/sites/default/files/se-temperature-Berating-note-na.pdf
so a red g e.co m W ts)-40 version P/N:SExxxxH-US000NNU4
O SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S
other trademarks mentioned herein are trademarks of their respective owners.Date:03/2019N01/ENG NAM.Subject to change without notice.
©2016 Eaton. All rights reserved.
pe.eaton.com
Eaton general duty cartridge
fuse safety switch
DG223NRB
UPC:782113144252
Dimensions:
• Height: 19.25 IN
• Length: 7.38 IN
• Width: 9.13 IN
Weight:14 LB
Notes:Maximum hp ratings apply only when dual
element fuses are used. 3-Phase hp rating shown is
a grounded B phase rating, UL listed.
Warranties:
• Eaton Selling Policy 25-000, one (1) year from
the date of installation of the Product or
eighteen (18) months from the date of shipment
of the Product, whichever occurs first.
Specifications:
• Type: General duty, cartridge fused
• Amperage Rating: 100A
• Enclosure: NEMA 3R
• Enclosure Material: Painted galvanized steel
• Fuse Class Provision: Class H fuses
• Fuse Configuration: Fusible with neutral
• Number Of Poles: Two-pole
• Number Of Wires: Three-wire
• Product Category: General duty safety switch
• Voltage Rating: 240V
Supporting documents:
• Eatons Volume 2-Commercial Distribution
• Eaton Specification Sheet- DG223NRB
Certifications:
• UL Listed
Product compliance: No Data
ProteaBracketTM is the perfect solar attachment solution for most trapezoidal
S=59t
rib, exposed-fastened metal roof profiles!
The Right Way!—
NOW AVAILABLE
The Right Way!TM
IN ALUMINUM � - ' ' � ' �" -' '' '� �' ••�
ProteaBracketTM
A versatile bracket for
N mounting solar PV to a f
� trapezoidal roof profiles
O
QProteaBracketTl is now made in aluminum.
O Still the most versatile trapezoidal metal
r
roof attachment solution on the market,
the S-5! ProteaBracket just got better! ------ � �
The bracket features an adjustable
attachment base and module attachment ' 0
•O options to accommodate different roof
Nprofile dimensions and mounting options. •
Our pre-applied EPDM gasket with peel `
i and stick adhesive makes installation
O a snap,ensuring accurate and secure Features and Benefits ''II • ••
�• placement the first time.
d With no messy sealants,faster installation, 34% lighter- saves on shipping
L. and a weather-proof fit, ProteaBracket Stronger L-FootTM O
M offers you the most versatile solar Load-tested for engineered V ,�
attachment solution available.
N application LO
• Corrosion-resistant materials (n
v Adjustable - Fits rib profiles
M up to 3" '
M ProteaBracket*can be used for Peel-and-Stick prevents accidental
O
rail mounting or "direct-attach" shifting during installation _ \
}' with 5-5! PVKITT" Fully pre-assembled N i
25-year warranty* M ProteaBracket"and the 5-5!PVKIT'"2.0
3 M mounted on a trapezoidal roof profile
Lh
•i 00
4) *When ProteaBracket is used in conjunction with the S-51 PVKIT, *See www.S-5.com for details. WM
an additional nut is required during installation. 00
r w1Y
iin i mom
h4m SOLARMOUNT ..
' ' • ' ' ' ' ' ' ' ' ' ' ' ' ' ' " ' ' ' ' ' UNIRAC
BETTER DESIGNS
TRUST THE INDUSTRY'S BEST DESIGN TOOL CONCEALED UNIVERSAL o
Start the design process for every project in our U-Builder on-line design tool. ENDCLAMPS
It's a great way to save time and money.
BETTER SYSTEMS
ONE SYSTEM-MANY APPLICATIONS
Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety
of modules in Portrait or Landscape.Tilt the system up on flat or low slow roofs. END CAPS INCLUDED
Components available in mill,clear,and darkfinishesto optimize your design financials WITH EVERY ENDCLAMP
and aesthetics.
BETTER RESULTS
MAXIMIZE PROFITABILITY ON EVERY JOB
CONCEALED --- Trust Unirac to help you minimize both system and labor costs from the time the job is
UNIVERSAL quoted to the time you rteams get off the roof.Faster installs.Less Waste.More Profits.
CLAMPS UNIVERSAL SELF
UNIRAC BETTER SUPPORT STANDING MIOCLAMPS
25 WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM
Professional support for professional installers and designers.You have access to
our technical support and training groups.Whatever your support needs,we've got
OPTIONAL YEAH you covered.Visit Unirac.com/solarmount for more information.
■ FRONTTRIM WABRATI �
U-BUILDER ONLINE DESIGN
• I ��� TOOL SAVES TIME& MONEY
BONDING&GROUNDING ��� Visit design.unirac.com
w
MECHANICAL LOADING
UL2703
Mai SYSTEM FIRE CLASSIFICATION
UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT
I 1 I ' UNMATCHED CERTIFIED ENGINEERING BANKABLE DESIGN PERMIT
EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION
TECHNICAL SUPPORT CERTIFIED QUALITY PROVIDER BANKABLE WARRANTY
Unirac's technical support team is dedicated to answering Unirac is the only PV mounting vendor with ISO Don't leave your project to chance,Unirac has the
questions&addressing issues in real time.An online certifications for 9001:2008,14001:2004 and OHSAS financial strength to back our productsand reduceyour risk.
THE PROFESSIONALS' CHOICE FOR RESIDENTIAL RACKING library Df documents including engineering reports, 18001:2001,which means wetleliverthe highest standards Have peace ofmintlknowingyou are providing products of
stamped letters and technical data sheets greatly forfit,form,and function.These certifications demonstrate exceptional quality.SOLARMOUNTis covered bya 25 year
simplifiesyour permittingand project planning process. our excellence and commitment to first class business practices. limited product warranty and a 5 year limitedfinish warranty.
BEST INSTALLATION EXPERIENCE•CURB APPEAL•COMPLETE SOLUTION•UNIRAC SUPPORT
ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN
FOR QUESTIONS 0R CUSTOMER SERVICE VISIT UNIRAC.00M 0R CALL (505) 248-2702 PUB2018AUG31-PRINTED UPDATE FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702
CSA CSA
GROUP'm (EP GROUP`
Certificate:70131735 Master Contract: 266909
Certificate of Compliance Project: 80082031 Date Issued: 2021-06-02
Certificate: 70131735 Master Contract: 266909
The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules.
Project: 80082031 Date Issued• 2021-06-02 The system is secured to the roof with the L-Foot components through the roofing material to building structure.
Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end
Issued To: Unirac clamps. The modules are bonded to the racking system with the stainless-steel bonding mid clamps with piercing
1411 Broadway NE points. The system is grounded with 10 AWG copper wire to bonding/grounding lugs.Fire ratings of Class A
Albuquerque,New Mexico,87102 with Type 1,2, 3, 10, 19,22 or 25 for steep slope. Tested at 5"interstitial gap which allows installation at any
United States stand-off height.
Attention: Klaus Ncolaedis The grounding of the system is intended to comply with the latest edition of the National Electrical Code,to
include NEC 250&690. Local codes compliance is required, in addition to national codes.All
The products listed below are eligible to bear the CSA Mark shown with grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used
p g during the certification testing for the current edition of the project report.
adjacent indicators 'C' and 'US'for Canada and US or with adjacent
indicator 'US'for US only or without either indicatorfor Canada only. The system may employ optimizers/micro-inverters and used for grounding when installed per installation
instructions.
UL 2703 Mechanical Load ratings:
Issued by: �4 c�EO Downward Design Load(lb/ft2) 113.5
Michael Hoffnagle
Upward Design Load (Ib/ft2) 50.7
O Down-Slope Load(1b/ft2) 16.13
CD Test Loads:
C US
Downward Load (Ib/ft2) 170.20
Upward Load (lb/ft2) 76.07
Down-Slope Load(Ib/ft2) 24.2
PRODUCTS
CLASS -C531302-POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems Unirac Large Array
CLASS -C531382-POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems -
Certified to US Standards ULA is a ground mount system using the SolarMount(SM)platform for the bonding and grounding of PV
modules.ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system
is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the
Models: SM - SOLARMOUNT Flush-to-Roof is an extruded aluminum rail PV horizontal Pipe to the vertical Pipe. The Front cap is also used to secure the Cross brace.A Slider is attached to
racking system that is installed parallel to the roof in landscape or the vertical Pipe to secure the Cross brace. The SM rails,caps, slider,rail brac kets, and cross braces materials are
portrait orientations. 6105-T5 aluminum extrusion.Fasteners materials are 304 stainless steel. Horizontal and vertical pipe materials
ULA - Unirac Large Array is a ground mount system using the meet the minimum requirements of ASTM A53 for galvanized steel pipe in 2"and 3"diameter.
SolarMount (SM) platform for the bonding and grounding of The mechanical load ratings from the SM test data will be applied to the ULA model.
PV modules.
Solarmount Fire Testing is not applicable due to being a ground mount system.
DOD 507 Rev.2019-04-30 ©2018 CSA Group. All rights reserved. Pa e 1 DOD 507 Rev.2019-04-30 ©2018 CSA Group. All fights reserved. Pa e 2
CM
' L+f CM
'—— a CC ft'f'Cate TUV Rheinland PTL
1
y i
�+ 1
Certificate no.
r S 47 t 6001 c n t
VL.7 VLIVVVIJ V1
1
Q CQ i
Z `a '
W0 ; = License Holder: Manufacturing Plant:
Cc Z Unirac Inc. Unirac Inc.
■■i Z 1411 Broadway NE 1411 Broadway NE
0 Albuquerque NM 87102 Albuquerque NM 87102
USA USA
J O � Ln � N Ln �0 � O
1 O CDN CDCO N N -1 Ln
Ln Nn 1.i O O O O
1
i
i
Test report no.: USA-314 4 0029 005 Client Reference:Tom Young
1
Tested to: UL 2 7 0 3:2 015
1 �
1
r. o
rV
N a`
1
1
1 M
1
1
1
� 0 Certified Product: Module Rack Mounting System License Fee-Units
1
1
00 Ln I1n Nl r_ Ln Ln OT
N N .o r1 �O It .O .O Model Designation: SolarMount (SM) 7
O Ln 1- 10 1,1 .-I � O Ib N
l/) N 0 0 0 0 0 O O O
Max System Voltage of PV Module: 1000 VDC
Max Size of PV Module: 20.8 sq.ft. surface area
Max Overcurrent Protection Rating of PV Module:
30 A when using the qualified grounding lugs;
20 A when using the Enphase micro inverter EGC.
Fire Rating: Class A when installed with
Type 1, Type 2, Type3, or Type 10 fire rated modules.
1 },
1 21
(continued)
F-
1
7
O Appendix: 1,1-5
1 2:
1 Q rn .o � 't
J O O� CD Ln
�O rn N �O Ln
O rl O r1 O Ln r4
1 V) -i O O O O O O O O
1
,
Licensed Test mark: Date of Issue
(day/mo/yr)
1 VI V
27/07/2016
1 G x x x x
1
COO*
a a x } x
a x > Q a z z
LU
t- a J J w w � TOVRheinDUS
= LJJ O O LL LL l7 l7
tL 0 v Z Z O O LL LL
•1 w Lu F- F- O O
L
_ O V) O O w w V) n
' V)
' O Q a 0 0 0 o
TUV Rheinland PTL,LLC,1107 W.Fairmont Drive,Building A,Tempe,Arizona 85282,Tel(480)966-1700,Fax(775)314-6458
PZ8 PZ8
structural structural
ENGINEERS ENGINEERS
January 20,2021
Unirac Components and Cladding Roof Zones:
1411 Broadway Blvd.NE The Components and Cladding Roof Zones shall be determined based on ASCE 7-16 Component and Cladding design.
Albuquerque,NM 87102
Notes: 1)U-builder Online tool analysis is only for Unirac SM SOLARMOUNT Rail Flush systems only and do not
Attn.:Unirac-Engineering Department include roof capacity check.
2)Risk Category II per ASCE 7-16.
Re:Engineering Certification for the Unirac U-Builder 2.0 SOLARMOUNT Flush Rail 3)Topographic factor,kzt is 1.0.
4)Array Edge Factor YE=1.5
PZSE,Inc.-Structural Engineers has reviewed the Unirac SOLARMOUNT rails,proprietary mounting system constructed 5)Average parapet height is 0.0 ft.
from modular parts which is intended for rooftop installation of solar photovoltaic(PV)panels;and has reviewed the U- 6)Wind speeds are LRFD values.
builder Online tool.This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail,SOLARMOUNT 7)Attachment spacing(s)apply to a seismic design category E or less.
STANDARD rail,and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information,data and
analysis contained within are based on,and comply with the following codes and typical specifications: Design Responsibility:
1. 2020 Florida Building Code,by Florida Building Commission The U-Builder design software is intended to be used under the responsible charge of a registered design professional
2. Minimum Design Loads for Buildings and other Structures,ASCE/SEI 7-16 where required by the authority having jurisdiction.In all cases,this U-builder software should be used under the
3. 2018 International Building Code,by International Code Council,Inc.w/Provisions from SEAOC PV-2 2017. direction of a design professional with sufficient structural engineering knowledge and experience to be able to:
4. 2018 International Residential Code,by International Code Council,Inc.w/Provisions from SEAOC PV-2 2017. . Evaluate whether the U-Builder Software is applicable to the project,and
5. AC428,Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic(PV)Panels,November Understand and determine the appropriate values for all input parameters of the U-Builder software.
1,2012 by ICC-ES.
6. 2015 Aluminum Design Manual,by The Aluminum Association,2015
This letter certifies that the Unirac SM SOLARMOUNT Rails Flush,when installed according to the U-Builder engineering
Following are typical specifications to meet the above code requirements: report and the manufacture specifications,is in compliance with the above codes and loading criteria.
Design Criteria: Ground Snow Load=0-100(psf) This certification excludes evaluation of the following components:
Basic Wind Speed=85-190(mph) 1) The structure to support the loads imposed on the building by the array;including,but not limited to:strength
Roof Mean Height=0-60(ft) and deflection of structural framing members,fastening and/or strength of roofing materials,and/or the effects
Roof Pitch=0-45(degrees) of snow accumulation on the structure.
Exposure Category=B,C&D 2) The attachment of the SM SOLARMOUNT Rails to the existing structure.
Attachment Spacing: Per U-builder Engineering report. 3) The capacity of the solar module frame to resist the loads.
Cantilever: Maximum cantilever length is L/3,where"L"is the span noted in the U-Builder online This requires additional knowledge of the building and is outside the scope of the certification of this racking system.
tool. DIGITAL SIGNATURE
Clearance: 2"to 10"clear from top of roof to top of PV panel. If you have any questions on the above,do not hesitate to call.
��t\II111111/��
Tolerance(s): 1.0"tolerance for any specified dimension in this report is allowed for installation. Prepared by: ``� J��"KE N NSS~ti,FFi'�i
Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. PZSE,Inc.—Structural Engineers
S
Landscape-PV Panel long dimension is parallel to ridge/eave line of roof and the PV No.73522
Roseville,CA _ _
panel is mounted on the long side. THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PAUL
Portrait-PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel K.ZACHER,PE ON 01/20/2021 USING A SHA-1 AUTHENTICATION CODE.
EXP.02/28/2023
is mounted on the short side. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED ''� �'+'o4OR10P:�'
AND SEALED AND THE SHA-1 CATION CODE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES �� SS�ONA Ltt"`�G```
01/20/2021
1478 Stone Point Drive,Suite 190, Roseville,CA 95661 1478 Stone Point Drive,Suite 190, Roseville,CA 95661
T 916.961.3960 F 916.961.3965 W www.pzse.com T 916.961.3960 F 916.961.3965 W www.pzse.com
Experience I Integrity I Empowerment Experience I Integrity I Empowerment