HomeMy WebLinkAbout21-145B Ocean Harbor South - Rep 1 - 02.02.22M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145B Report No. 1
Client:
Building Official:
Contractor:
File
Mr. Gene Ross- Elliott Merrill
SLC Building Department
Mr. Bob Stark-Structure-Con
Mr. Khris McConnell-Structure Con
Page 1 of 2
OCEAN HARBOR SOUTH CONDOMINIUMS
4200 NORTH HWY A1A – SOUTH BLDG – BLDG. B
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 2106-0288
PROJECT NAME: Ocean Harbor South – Bldg. B DATE: February 2, 2022
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny / Windy
WORK INSPECTED:
Unit 609 – Balcony Demo
OBSERVATIONS:
• Post shores are in place at units 409 and 509 below.
• The sliding glass door (SGD) has been removed and a temporary wall has been installed at the north elevation.
• Demolition of the deteriorated concrete floor under the SGD was completed.
• All exposed reinforcing bars have minor corrosion except for one, which runs directly under the SGD track.
• (1) Uniform post tension (PT) cable at the east jamb is damaged and requires replacement.
RECOMMENDATIONS:
• The damaged PT cable is to be spliced with a new cable and re-stressed.
• Chip the north balcony edge to locate the end of the damaged PT cable lock-off anchor.
• Provide a new #5 dowel to be lapped next to the corroded bar under the SGD and epoxy 6” into the existing
column.
• Continue repairs as per the specs by mechanically cleaning all corroded and exposed reinforcing bars and
coating them with the specified corrosion inhibitor prior to applying concrete repair mortar.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145B Report No. 1
Client:
Building Official:
Contractor:
File
Mr. Gene Ross- Elliott Merrill
SLC Building Department
Mr. Bob Stark-Structure-Con
Mr. Khris McConnell-Structure Con
Page 2 of 2
Pic 1
North facing SGD spalling area.
Pic 2
Partial depth repair area.
Pic 3
Uniform cable broken at thr east jamb.