Loading...
HomeMy WebLinkAboutEngineering & TestingPhone 954-784-2941 1 edei—al 800-848-1919 Fax 954-784-7875 & TESTING INC. / Or �(� www.fed-eng.com Zrn,cw 13th Ave Pompano Beach, FL 33069 / J Client: Mel-Ry Constuction Date: January 24, 2014 Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 14-290/178 Project: Proposed Residence Lot 99 t/ Permit #: Address: 107251. Ocean Drive, Jensen Beach, FL Tech: AM Area Tested: Building Pad Compaction Req.: 95% Material Type: Dark Brown Sand wRock & Shell Frags Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture Compaction Pass 1 NE Corner of Pad 12" FL 8.3 110.6 113.0 11.0 97.9% Yes 2 Center of Pad 12" FL 5.6 109.8 113.0 11.0 97.2% Yes 3 SW Corner of Pad 12" FL 7.1 111.2 113.0 11.0 98:4°Io Yes 4 5 7 8 9 10 11 0 E 0 V E -- 12 13 MATla a t AV 14 15 Remarks: See Reverse For Disclaimer Test Performed Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift SL = Springline FL = Final Lift Fr-'-7 Subgrade BG = Below Grade B BOF-B tt On Top 12" Of Pad Not A Verification Of Soil Beannc Submitted by: KEITH LEBLANC Professional Engineer#59394 11asecourse - o om o 0o Ing Cert. of Authorization #5471 1 TOP = Top of Pipe FG = Finished Grade State of Florida As a mutual protection to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and authorization jor publi, tion of statements, conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. Pursuant to your request, Federal Engineering & Testing, Inc has performed a compaction test at.the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only..In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by clienti prior to construction'to verify subsoil conditions. Environmental analysis of the soil materials is not 'part", of the, scope of, services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. i Job project specifications .were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc shall be notified. Our findings are relative to Ithe date and areas of our site work and should not be relied upon to represent conditions..on other areas or dates. Any subsequent site disturbances due to water erosion, rain, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. I Asa mutual protection to clients, the public and ourselves, all reports are submitted -"are , f; --�; try,; ".,t the confidential property of; clients and authorization for use, publication of statements ` . �' conclusions or extracts from or regarding our reports is res�e,r;ved p6iidifij written approval. ff' It has been a pleasure working with you and look forward to do so iri th'e near future. _