HomeMy WebLinkAboutENGINEERS REPORT SEC 19 2431 SE Dixie Hwy
Novo
c �r�, Stuart, FL 34996
ST Phone: (772) 287-0525
MATHERS ENGINEERING ���,�oUn Email: mathersengineers@bellsouth.net
e
tY, permit
CORPORATION
Memo
To: Plan Reviewer From: Holly Mathers
Co: St Lucie Co. Building Dept. Pages: SEE ATTACHED
2300 Virginia Avenue
Fort Pierce, FL 34982
Fax: Date: 12/10/2021
Re: Atlantis B Condominium Phone:
10152 S. Ocean Drive, Jensen Beach
Concrete Restoration
Permit#SLC 2103-0427
❑Please Reply X Mailed ❑ Hand Delivered ❑ Faxed Only ❑Faxed and Mailed
Enclosed is 1 signed and sealed engineer's threshold inspection report#3 for the
concrete restoration permit #2103-0427.
vk.�ANNED
This message is intended only for use of the individual or entity to which it is addressed,and may contain
information that is privileged,confidential,and exempt from disclosure under applicable law. If the reader of the
message is not the intended recipient,or the employee or agent responsible for delivering the message,you are
hereby notified that any dissemination,distribution or copying of the communication is strictly prohibited. If you
have received this communication in error,please notify us immediately by telephone and return the original
message to us at the address above via the U.S.Postal Service.
I
2431 SE Dixie Highway
MUM Stuart, FL 34996
MATHERS ENGINEERING Phone: (772)287-0525
EB#0004456
CORPORATION
Post-Building Permit Addendum Engineer's Field Observation Report #3
Date: December 09, 2021
To: Plan Review
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Blue Coast Construction
__ 2587 SE Monroe Street . _
Stuart,FL 34997
Referenced Project: Concrete Restoration'for Exterior Common Walkways
For tad to 7th Levels
For Atlantis B Condominium
Located at 10152 S. Ocean drive,Jensen Beach,FL 34957
Permit No.: SLC 2103-0427
Mathers Engineering Corporation visited the job site and made the following observations of the
ongoing concrete restoration and repairs of exterior walkways:
Site Observations 10/01/2021 thru 12/09/2021:
North Side Walkways:
. • Deck coating not yet installed.
South Side Walkways:
• Concrete restoration completed.
• Guardrails re-installed.
• Deck coating not yet installed.
Limitations:
Our professional services have been performed,our findings obtained, and our opinions prepared in accordance
with general accepted engineering principles and practices. This company is not responsible for the
conclusions,opinions or recommendations r1r���i�l>�y others based on our findings.
\ /
Approved by: ��� \P .....9
���..•��GENSF,,�`,n�i�
PE 19658
REI;EIVED
F ,
c onto . ,•`,<v�.� FEB 0 3 2022
-G�
William J. Mathers, PE /�jsS�ONAI \\��\ 'sT. Lucie,County, Per'.
Florida License PE#19658 I II I 1 SCANFlorida SI#155