Loading...
HomeMy WebLinkAboutEngineering & Testing 8-19-14o c, Phone 954-784-2941 0 .1 800-848-1919 ederd" Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069�- Client: Mel-Ry Construction Date: August 18, 2014 Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: Project: Proposed Residence Lot 833 Permit #: Address: 10701 S. Ocean Drive, Jensen Beach, FL Tech: 14-2265' DAS Area Tested: Footings for Pad Compaction Req.: 95% Material Type: Light Brown Sand w/Shell Fragments Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture 6/6 Compaction Pass 1 N.E. Corner of Footings 12" BOF 7.3 109.2 110.0 9.0 99.3% Yes 2 N.W. Corner of Footings 12" BOF 5.2 107.6 110.0 9.0 97.8% Yes 3 S.W. Comer of Footings 12" BOF 4.4 108.0 110.0 9.0 98.2% Yes 4 5 6 7 8 9 10 11 12 13 1 ' 4 •r 14 15 Remarks: See Reverse For Disclaimer Test Performed Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift SL = Springline FL = Final Lift SG = Subgrade BG = Below Grade BC = Basecourse BOF = Bottom of Footing On Top 12" Of Pad Not A \ Submitted by: LEBLANC Professional Engineer #59394 Cert. of Authorization #5471 a`i TOP = Top of Pipe FG = Finished Grade State of Florida" As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizafjoh foi ayblication'of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. This testing does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for detennination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and otherfd 'sturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, Al rep orts�ai;e'subrnitted ai'c thie confidential property of clients and authorization for use, publication of statements, conclusions or extracts fi,om or.iegarding our reports is reserved pending written approval. It has been a pleasure working with you and look forward to do so in the near future. f