Loading...
HomeMy WebLinkAboutAPPROVED Hopper RENO PLAN-Shower- RenoSeapointe Builders Shower Demo & Reno Existing Floor planHOPPER -SHOWER NEW FLOOR PLAN REMOVE EXISTING AND REPLACE WITH NEW TOILET -LIKE FOR LIKE. 0 PROPOSED PLAN: DEMO -REMOVE TUB, TUB AND SHOWER FIXTURES ,AND WALL BETWEEN EXISTING SHOWER AND TUB REMOVE EXISTING TOILET. REMOVE TILE FLOOR PROPOSED RENO PLAN NEW: REPLACE NEW TOILET TO EXISTING PLUMBING. CHANGE EXISTING SHOWER HEAD (1 ) TO HANDHELD FIXTUER TO EXISTING PLUMBING. USE TWO EXISTING DRAINS LIKE FOR LIKE ADD NEW ROUGN PLUMBING ,AND TRIM FOR TWO NEW RAIN HEAD SHOWERS (2 & 3) ADD NEW ROUGH PLUMBING AND TRIM FOR NEW HANDHELD SHOWER (4) REPLACE WALL BOARD AND DRYWALL AS NEEDED, INSTAL NEW TILE TO SHOWER AND BATH FLOOR.. 1 2 3 4