HomeMy WebLinkAboutAPPROVED Hopper RENO PLAN-Shower- RenoSeapointe Builders
Shower Demo & Reno
Existing Floor planHOPPER -SHOWER
NEW FLOOR PLAN
REMOVE EXISTING AND REPLACE WITH
NEW TOILET -LIKE FOR LIKE.
0
PROPOSED PLAN:
DEMO -REMOVE TUB, TUB AND
SHOWER FIXTURES ,AND WALL
BETWEEN EXISTING SHOWER AND TUB
REMOVE EXISTING TOILET.
REMOVE TILE FLOOR
PROPOSED RENO PLAN NEW:
REPLACE NEW TOILET TO
EXISTING PLUMBING.
CHANGE EXISTING SHOWER HEAD (1 )
TO HANDHELD FIXTUER TO EXISTING
PLUMBING.
USE TWO EXISTING DRAINS LIKE FOR
LIKE
ADD NEW ROUGN PLUMBING ,AND TRIM
FOR TWO NEW RAIN HEAD SHOWERS (2
& 3)
ADD NEW ROUGH PLUMBING AND TRIM
FOR NEW HANDHELD SHOWER (4)
REPLACE WALL BOARD AND DRYWALL
AS NEEDED, INSTAL NEW TILE TO
SHOWER AND BATH FLOOR..
1
2
3
4