Loading...
HomeMy WebLinkAboutProgress Inspection Report 1 & 2 • South Brevard KEYSTONE •31 • • • ENGINEERING & Fax: 321-459-2888 CONSULTING, INC,. �•••Y Beach, Progress Inspection Report #1 Permit #2102-0371 SCANNED Project Name: Barclay Beach Club Progress Report thru 5-21-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 5-21-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: Mobilization, removing tile and coatings, and marks for repair INSPECTOR'S REPORT Keystone Engineering visited the site on 5-21-21 and had several conversations with the construction team by telephone throughout the week. The contractor mobilized a storage trailer, dumpster, and other equipment on site. Workers installed swing stages on the northeast corner stack and on the three southeast balcony stacks. The construction crew removed tile and coatings from several units this week and are still in progress. Damage inspections and marks for repair are in progress on the 04 and 06 balcony stacks. Many units on the 04 stack have damage near the door thresholds, several may require to be removed in order to repair the damage. Next week the crew will begin new excavations for the inspected balconies. RECEIVED rl///d , Nov 0 5 702, S PO q�f ,*�, Permitting Department Q' ,++••.«....��y� ."� St. Lucie county Y dw . .a STATE OF t &s��NA L� ITT- View of severely corroded reinforcement exposed in a spall next to a door threshold on the Penthouse 3 balcony pp PLOW i '•a .'�-_ _ f K , View of deteriorated reinforcement exposed by a door threshold on the Penthouse 3 balcony t a 1C`4M r 1, it:. • oo i H; View of marks for repair on the Penthouse 3 balcony,this section of the balcony slab will need completely replaced ,t f i ;.k View of corroded reinforcement exposed on the Penthouse 3 balcony r ti a FAwWrl Additional view of severe spaliing next to a door threshold on the Penthouse 3 balconv 11 r {—Watek View of the tile removed and marks for repair on the Unit 1004 balconv �Q. y View of corroded reinforcement exposed next to a door threshold on the Unit 1004 balcony t/ View of the tile removed on the Unit •1 balcon - r s Y' } _y� sy N •.IIr � .-3. IJ 44 Iv yy } View of corroded reinforcement exposed under a door threshold on the Unit 804 balcony or „ I Y di it View of severe spalling observed under a door threshold on the Unit 704 balcony IL View of corroded reinforcement exposed and marked for repair by a door threshold on the Unit 1006 balconv l View of the tile/coating removed and marks for repair on the Unit 906 balconv i � s j r- �y t View of the tile/coating removed and marks for repair on the Unit 806 balcony t �l `y p � 6� View of the the/coating removed with little damage on the Unit 706 balcony I/ ♦ i 7 ti �� ���� �� � ��.• k"' � is View of the tile/coating removed and marks for repair around exposed reinforcement next to the door thresholds on the Unit 606 balcony i View of corroded reinforcement exposed on the edge of the ceiling on the Unit 406 balcony n 4 View of the swine stages installed on the 3 southeast balcony stacks South25 : • KEYSTONE • •• •. Phone: • • ENGINEERING & : : : _ CONSULTING, INC. Progress Inspection Report Permit #2102-0371 Project Name: Barclay Beach Club Progress Report thru 5-28-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 5-24, 5-27-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: Tile and coating removal, 04 and 06 stack excavations, 07 stack marks for repair INSPECTOR'S REPORT Keystone Engineering visited the site on 5-24, 5-27-21, and had several conversations with the construction team by telephone throughout the week. This week the 07 stack and the remaining units on the 04 and 06 stack were inspected and marked for repairs. New excavations are in progress on the 04 and 06 stack. The construction crew has opened many repairs in front of the doors to reveal the conditions under the thresholds. Severe spalling and corroded reinforcement can be observed under several thresholds. Severe corrosion and spalling under a door threshold normally indicate the door track is leaking water into the concrete. The slab reinforcement running under a door is important to repair because it is an area of high stress for cantilevered balconies. Tile and coating removal are in progress on the other southeast stacks. Once balconies are stripped to bare concrete damage inspections and marks for repair will continue. No. *088 q STATE OF t a. Aft • w t, o 40R10:•'�`� s//o MA L St'e0 ndniatmen��� 5 5 View of severe spalling and corroded reinforcement exposed under a door threshold on the Unit 1004 balcony 400, ,f!"'.- .. ... .`,�. � �1 .l�`� ;"•"t spy."�.'� �.r, V_ _ View of severe spalling observed under an additional door threshold on the Unit 1004 balcony -:.- ._- WA l 1 `n i View of severely corroded reinforcement observed under an additional door threshold on the Unit 1004 balcony View of excavations in progress on the edge of the Unit 1004 balcony t } "' •.... r View of severely corroded reinforcement observed under a door threshold on the Unit 904 balcony , a. + IAP View of excavations in ro ogress where less damage is observed under a door threshold on the Unit 4 90 balcony p � � V t� c �''" '.•? �i ~��; .- y eat` WIWI View of excavations in progress on the edge of the Penthouse 5 ceiling 11 ' r � ii .n� I t ------------ A 'Casa 1 L Al View of severely corroded reinforcement and spalling observed under a threshold on the Penthouse 5 balcony i . i¢R; 1 4 ,r - F t= View of the tile/coating removed on the Unit 807 balcony,with little damage to be repaired f i, ty f \ '�666666 ' 1 View of the tile/coating removed and marks for repair on the Unit 607 balcony �> 71 View of corroded reinforcement exposed and marked for repair on the Unit 507 balcony y _ f n 4M1 Y View of excavations in progress on the Unit 606 balcony c _ G r 1_ View of the damage observed under a threshold after the tile/coating was removed on the Unit 306 balcony i View of the the/coating removed and marks for repair on the Unit 206 baiconv