Project Name: Barclay Beach Club Progress Report thru 5-21-21
Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 5-21-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: Mobilization, removing tile and coatings, and marks for repair
INSPECTOR'S REPORT
Keystone Engineering visited the site on 5-21-21 and had several conversations with the
construction team by telephone throughout the week.
The contractor mobilized a storage trailer, dumpster, and other equipment on site. Workers
installed swing stages on the northeast corner stack and on the three southeast balcony
stacks. The construction crew removed tile and coatings from several units this week
and are still in progress. Damage inspections and marks for repair are in progress on the
04 and 06 balcony stacks. Many units on the 04 stack have damage near the door
thresholds, several may require to be removed in order to repair the damage. Next week
the crew will begin new excavations for the inspected balconies.
RECEIVED
rl///d , Nov 0 5 702,
S PO q�f ,*�, Permitting Department
Q' ,++••.«....��y� ."� St. Lucie county
Y
dw .
.a STATE OF t
&s��NA L�
ITT-
View of severely corroded reinforcement exposed in a spall next to a door threshold on the Penthouse 3 balcony
pp
PLOW
i
'•a .'�-_ _
f
K ,
View of deteriorated reinforcement exposed by a door threshold on the Penthouse 3 balcony
t
a
1C`4M r
1,
it:. •
oo
i
H;
View of marks for repair on the Penthouse 3 balcony,this section of the balcony slab will need completely
replaced
,t f
i
;.k
View of corroded reinforcement exposed on the Penthouse 3 balcony
r
ti
a FAwWrl
Additional view of severe spaliing next to a door threshold on the Penthouse 3 balconv
11
r
{—Watek
View of the tile removed and marks for repair on the Unit 1004 balconv
�Q.
y
View of corroded reinforcement exposed next to a door threshold on the Unit 1004 balcony
t/
View of the tile removed on the Unit
•1 balcon
-
r s
Y'
}
_y� sy N •.IIr � .-3.
IJ
44 Iv
yy }
View of corroded reinforcement exposed under a door threshold on the Unit 804 balcony
or „ I
Y di
it
View of severe spalling observed under a door threshold on the Unit 704 balcony
IL
View of corroded reinforcement exposed and marked for repair by a door threshold on the Unit 1006 balconv
l
View of the tile/coating removed and marks for repair on the Unit 906 balconv
i � s
j
r-
�y t
View of the tile/coating removed and marks for repair on the Unit 806 balcony
t
�l `y
p �
6�
View of the the/coating removed with little damage on the Unit 706 balcony
I/ ♦ i
7 ti
�� ���� �� � ��.• k"' � is
View of the tile/coating removed and marks for repair around exposed reinforcement next to the door
thresholds on the Unit 606 balcony
i
View of corroded reinforcement exposed on the edge of the ceiling on the Unit 406 balcony
n
4
View of the swine stages installed on the 3 southeast balcony stacks
South25 : •
KEYSTONE • •• •.
Phone: • •
ENGINEERING & : : :
_ CONSULTING, INC.
Progress Inspection Report
Permit #2102-0371
Project Name: Barclay Beach Club Progress Report thru 5-28-21
Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 5-24, 5-27-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: Tile and coating removal, 04 and 06 stack excavations, 07 stack marks
for repair
INSPECTOR'S REPORT
Keystone Engineering visited the site on 5-24, 5-27-21, and had several conversations with the
construction team by telephone throughout the week.
This week the 07 stack and the remaining units on the 04 and 06 stack were inspected and
marked for repairs. New excavations are in progress on the 04 and 06 stack. The
construction crew has opened many repairs in front of the doors to reveal the conditions
under the thresholds. Severe spalling and corroded reinforcement can be observed
under several thresholds. Severe corrosion and spalling under a door threshold normally
indicate the door track is leaking water into the concrete. The slab reinforcement running
under a door is important to repair because it is an area of high stress for cantilevered
balconies. Tile and coating removal are in progress on the other southeast stacks. Once
balconies are stripped to bare concrete damage inspections and marks for repair will
continue.
No. *088
q STATE OF t
a.
Aft • w t,
o 40R10:•'�`�
s//o MA L St'e0
ndniatmen���
5
5
View of severe spalling and corroded reinforcement exposed under a door threshold on the Unit 1004 balcony
400,
,f!"'.- .. ... .`,�. � �1 .l�`� ;"•"t spy."�.'� �.r, V_ _
View of severe spalling observed under an additional door threshold on the Unit 1004 balcony
-:.-
._-
WA
l 1
`n
i
View of severely corroded reinforcement observed under an additional door threshold on the Unit 1004 balcony
View of excavations in progress on the edge of the Unit 1004 balcony
t
}
"' •....
r
View of severely corroded reinforcement observed under a door threshold on the Unit 904 balcony
,
a. +
IAP
View of excavations in ro ogress where less damage is observed under a door threshold on the Unit 4 90 balcony
p � � V
t� c
�''" '.•? �i ~��; .- y eat`
WIWI
View of excavations in progress on the edge of the Penthouse 5 ceiling
11
' r �
ii
.n�
I
t
------------
A 'Casa
1 L
Al
View of severely corroded reinforcement and spalling observed under a threshold on the Penthouse 5 balcony
i .
i¢R;
1
4
,r -
F
t=
View of the tile/coating removed on the Unit 807 balcony,with little damage to be repaired
f
i, ty f
\ '�666666
' 1
View of the tile/coating removed and marks for repair on the Unit 607 balcony
�>
71
View of corroded reinforcement exposed and marked for repair on the Unit 507 balcony
y _
f
n
4M1
Y
View of excavations in progress on the Unit 606 balcony
c _
G
r 1_
View of the damage observed under a threshold after the tile/coating was removed on the Unit 306 balcony
i