Progress Inspection Report #8 7 �o ands
Permit #SLC 2102-0371
Project Name: Barclay Beach Club Progress Report thru 7-2-21
Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 7-1-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: Unit 1004, 904, PH03, 906, 706, and 606 cast backs, door reinstallations,
Unit 1004, 1007, PH04, and PH05 excavations, and storm prep
INSPECTOR'S REPORT
Keystone Engineering visited the site on 7-1-21 and had several conversations with the
construction team by telephone throughout the week.
This week Keystone Engineering inspected the door thresholds from the interior in several units
on the 04 and 05 balcony stacks, more door thresholds were also inspected from the
exterior on the 06 stack. Cast backs were completed for Units 904, 1004, and PH03
where waterproofing and door installations are finishing up. The construction crew is
applying a layer of waterproofing under door thresholds before reinstalling the tracks.
Cast backs were also completed for Units 606, 706, and 906 where door reinstallations
are in progress.
Concrete repairs are in progress for Units 1007, PH04, and PH05. Workers removed sliding
glass doors and installed interior barricades to chase the corroded reinforcement and
spalled concrete through excavations. Once excavations reach good concrete and
cleaner steel the damage has been completely removed. A pre-pour inspection was
completed on Thursday and cast backs are in progress. The construction crew started
storm prep at the end of the week. Units with interior barricades for removed doors will
have an additional plywood wall installed over the door frame on the outside.
AF
N0. 50058 i M
o Z S*MTE OF
i/,' '96',O NAL•�?G\\\\�`e\\
�ou111111t%na��
-
t
t l qq
Itt
y
View of excavations in progress under a door threshold on the Unit 904 balcony
t
View of a surface repair in progress on the Unit 904 balcony
yf
AU
s "V
Aw
f
�r
View of cast backs and door reinstallations completed on the Penthouse 3 balcony
E
f:
r._
View of waterproofing applications in prolzress on the Penthouse 3 balcony
1,
`
View of fractured concrete observed under a door on the Unit 306 balconv
h► M ;
.� r` �_R .
f •d
View of concrete damage observed under another door on the Unit 306 balconv
l ,
r
+ '
Nv
View of repairs in progress under a door threshold on the Penthouse 5 balcony
r�
View of repairs in progress under another door threshold on the Penthouse 5 balcony
t
\y.
1
41
View of surface repairs in progress under another door on the Penthouse 5 balcony
4
VAllaill
Y�7
rrr
i - mac' '•i�
View of the deterioration of the reinforcement from the repair in the previous photo
-'6Am
40
1 �
"r..a�1:....aai a
,gyp � � ,r `•
r
View of surface repairs in progress under a door on the Unit 1007 balcony
�•v
roll
f
f
View of a surface repair in progress under another door on the Unit 1007 balconv
` rr
. t
`w
i
View of a surface repair in progress under a door on the Penthouse 4 balconv
k
Additional view of surface repairs in progress on the Penthouse 4 balconv
4w
,,�
jol- w
�� 'Ay �� •
View of an additional repair in progress on the Penthouse 4 balconv
s S� �.
r
1 r
s,
lth a
EL ,
View of corroded reinforcement expanding a repair through the floor of the Penthouse 4 balconv into the unit
below
R
Oar ♦ 1'7 -+,�,.�
View of the interior barricades installed and sealed on the Penthouse 4 balcony
sue+'
r.
A W + -. -
View of ceiling damage observed above a door on the Unit 1005 balcony
South25 Brex,ard
t. KEYSTONE Cocoa Beach, FL 32931f
• -454-7300
ENGINEERING & : : :
CONSULTING, INC.
Progress Inspection Report #8
Permit #SLC 2102-0371
Project Name: Barclay Beach Club Progress Report thru 7-9-21
Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 7-9-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: Storm prep, 07 stack door inspections, door removal and reinstallations,
and new excavations
INSPECTOR'S REPORT
Keystone Engineering visited the site on 7-9-21 and had several conversations with the
construction team by telephone throughout the week.
This week the contractor's primary focus was prepping the building for the tropical storm.
Workers installed and sealed additional barricades over the door frames for units where
doors were removed for repairs over the weekend by Monday. The construction crew
secured equipment and removed the swing stages.
Once the building was clear of the storm the crew reinstalled the swing stages and resumed
work. New excavations revealed the conditions under doors on the 07 stack, Keystone
Engineering inspected the concrete to determine which doors need removed for repairs.
Interior barricades were installed for Units 804 and 506, where doors were removed and
excavations are now in progress. Door reinstallations for Penthouse 3 and cast backs for
Penthouse 5 and Unit 1007 were completed this week. Threshold waterproofing
applications and door reinstallations are in progress
��s;t�+l�t llliiif i
ti�NNNIv,. S PO
,`//'/
No. 50068 %
ST&TE OF r
,p ••.A, P►•• �, ..
o '•.,C OR 10
% SSA O N A L �?�������
tifl!I1100
OIJ
View of corrosion and spalling observed under a door on the Unit 707 balcony
N
1 e K
Ir 4
View of corrosion and spalling observed under an additional door on the Unit 707 balcony
G'
i
_ate' ...S
_ - r
... #
r
f
View of damaged concrete under an additional door on the Unit 707 balcony
View of spallinQ extending past the door inside Unit 707
View of fractured concrete observed under a door on the Unit 507 balcony
4cl] n
I
�•YI 1
. I
I
View of additional barricades installed as storm prep where doors were removed for Unit 407
r
e
.f` jp.
View of concrete damage observed under a door on the Unit 207 balcony
e� c
M •
View of damage observed under an additional door on the Unit 207 balcony
yam.
• ol . rr•'-•
Ow
View of steel prep in progress for surface repairs under a door for Unit 506
44
--7V. _ .
�a, y
S
Additional view of surface repairs in progress on the Unit 506 balcony