Loading...
HomeMy WebLinkAboutProgress Inspection Report 9 & 10 South25 • KEYSTONE Avenue,Cocoa Phone: 0• ENGINEERING & : : : CONSULTING, INC. Progress Inspection Report #9 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 7-16-21 Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 7-13-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: Unit 506, 804, and Penthouse 4 steel prep, 04 stack edge repairs, 06 and 07 stack door inspections INSPECTOR'S REPORT Keystone Engineering visited the site on 7-13-21 and had several conversations with the Y 9 9 construction team by telephone throughout the week. This week the construction crew completed new excavations for Units 506, 804, and Penthouse 4, workers prepped the existing reinforcement and supplemented rebar for deteriorated sections. Waterproofing applications and door reinstallations were completed for Units 1004 and 1007 this week, where workers have now removed the interior barricades. Two condo representatives observed the Penthouse 4 pre-pour inspection and the door inspections performed on the 06 and 07 stacks with Keystone Engineering on Wednesday. Workers are preparing edge repairs for several units on the 04 stack. After receiving permission from the association, the contractor is going to cut the ends of the existing handrail posts that were originally embedded in the concrete. This allows the workers to leave the handrails installed as a safety measure while work is in progress. +�1itt0lDiill�7 � f r p,.S Pp • No. 5�0068 STATE OF Q 0;*•'••�4 OR`�4'•�`�� rrrr/f�s101VA L Ea fl1111111t llk I .. ; oll View of steel prep in progress for concrete repairs under a door on the Penthouse 4 balcony r, h View of steel prep in progress for concrete repairs under an additional door on the Penthouse 4 balcony i y � View of steel prep in progress for concrete repairs under an additional door on the Penthouse 4 balconAl _ J View of corrosion and spalling observed under a door on the Unit 206 balcony t ` View of corrosion and spalling observed under an additional door on the Unit 206 balcony �t-f * 7 •� -—k V View of concrete damage observed under a door on the Unit 307 balcony r, l t 4 4 i4�'.W— View of severe corrosion and spalling observed under an additional door on the Unit 307 balcony i Y View of excavations in progress on the Unit 804 balcony r F- r :.t ti •, Y View of additional excavations in progress on the Unit 804 balcony ,I •x 1 :y .. `��.�[`.�-_ � '�Y ,r, �•�« is t View of concrete damage that extended past the door and around the wall inside Unit 804 tea►/ _ r I View of door reinstallations • • • on 114 balcon View ;n�w`� Yeti I. �\� `ems - '` •�4; `1\� i+s of • ••fing app ions • door, • • • surface for1004 "$ Y } . :. 'fir_, View of an edge repair in progress on the Unit 904 balcony,where workers will cut the existing handrail post to keep the metal out of the concrete i ' 1 1 View of an edge repair in progress on the Unit 704 balcony yt yl f • IL d View of the severe corrosion caused by the water intrusion through the core-mounted handrail posts 25 South Brevard Avenue, KEYSTONECocoa Beach, FL 32931 Phone: 00 ENGINEERING & - : : : CONSULTING, INC. Progress Inspection Report #10 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 7-23-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 7-23-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: 06 and 07 stack door removal, door reinstallations, and pre-pour inspection, Unit 905 door removal and excavations, 04 stack door reinstallations INSPECTOR'S REPORT Keystone Engineering visited the site on 7-23-21 and had several conversations with the construction team by telephone throughout the week. This week the construction crew installed interior barricades and removed sliding glass doors for Units 506, 306, 206, and 905. Initial excavations were completed under several doors, others are still in progress. The crew is focusing on threshold repairs first to reinstall the doors quicker before addressing the concrete repairs on the rest of the balcony. A pre- pour inspection was completed for the completed excavations on the 06 and 07 stacks. Door reinstallations are in progress for upper levels of the 06 and 07 stacks and cast backs are in progress for the lower unit thresholds. Doors have been reinstalled for Units 804, 904, 1004, and Penthouse 3, where the crew will begin removing the interior barricades next week. �P 06 Z ' NO. 0 • MTTE OF w ''����� X§ ��`���NAL•��6�\\ /�l�ihtN1111h1���\ �r y'• 1 S ♦'jr 7: V l 1' View of a surface repair in progress on the Unit 907 balcony L M View of the door reinstallations completed after the thresholds were cast back on the Unit 707 balcony } v View of concrete repairs in progress on the Unit 607 balcony A' I_ View of the concrete repairs in progress on the Unit 806 balcony r r- M's!r b i a t - + b `• View of cast backs and waterproofing applications completed for a door threshold on the Unit 506 balcony f .if Jo ',t r r i View of cast backs completed and waterproofing applications in progress for a threshold on the Unit 306 balcony ( • fI p 1 r A. y h,. View of a door reinstallation in progress after cast backs and waterproofing applications were completed for a threshold on the Unit 306 balcony 4 1' i 1n View of carpets of carpets being to cure the new concrete repairs on the Unit 206 balcony cure the new concrete repairs on the Unit 206 balcony ♦, Bel to j d . r gM �f View of an interior barricade installed,door removed,and initial excavations in progress on the Unit 905 balcony