Loading...
HomeMy WebLinkAboutProgress Inspection Report 13 & 14 r 25 South i • ' ; •�KEYSTONE Beach, FL 32931 Phone: 321-454- • • ENGINEERING - : : : CONSULTING, INC. Progress Inspection Report #13 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 8-13-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 8-11-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: Unit 504 and 404 door removal and excavations, Unit 206 edge repairs INSPECTOR'S REPORT Keystone Engineering visited the site on 8-11-21 and had several conversations with the construction team by telephone throughout the week. This week the construction crew removed sliding glass doors on the Unit 504 and 404 balconies. Excavations continued past the doors, an additional door will need removed on the Unit 404 and 204 balconies. Doors were inspected from the inside for damage, however units with tile make it hard to detect damage within. Most of the sliding glass doors have rebar that run parallel with the track, and it is difficult if not impossible to excavate completely around the steel without removing the track. Severely corroded reinforcement was discovered in a column on the inside of Unit 404. Contractor plans to cast back the surface repairs before addressing the column. Workers excavated spalls on the edge of the Unit 206 balcony, steel prep and form installations are in progress. Cast backs are also in progress on the rest of the 06 stack. 4 IV •`.(� r No. 5006$ OF „ ,Q �. SATE i o •. 4 o R %///�S l01 A III j 41 o' View of a sliding glass door removed on the Unit 504 balcony and excavations in progress past the threshold 74- v � - • w1 try ./*� 4 r a , View of fractured concrete under a sliding glass door on the Unit 404 balcony,where you can see the exposed rebar running parallel with the track r w t Y t ARM If View of excavations in progress on the northeast corner of the Unit 404 balcony .is 4 T ,�� dip, View of the severely corroded reinforcement exposed in the column inside Unit 404 r Y' View of concrete damage observed under a Unit 204 sliding glass door r , View of a door removed and excavations in progress on the Unit 204 balcony I i 1 - F a View of form installations for an edge repair in progress on the Unit 106 balcony 25 South vard KEYSTONE - .•Cocoa 00 ENGINEERING & - : : : CONSULTING, INC. Progress Inspection Report #14 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 8-20-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 8-19-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: 04 stack interior barricades and cast backs, 06 stack stucco applications, and 07 stack steel prep and form installations INSPECTOR'S REPORT Keystone Engineering visited the site on 8-19-21 and had several conversations with the construction team by telephone throughout the week. The construction crew extended the interior barricades inside Units 204 and 404 to continue excavations past door/window thresholds. Cast backs were completed for Unit 504 and several other units on the 04 stack with repairs in progress. The contractor is laying carpet over the repairs for 4 days to cure the concrete. Stucco applications are in progress across the slab faces and ceilings on the 06 stack. Steel prep and form installations are in progress for the 07 stack repairs, cast backs will begin soon. \N4.%�dStaSylit9td!!!j jZ P's Po `° ��°''�. 0� * No. 0068 q sTATE OF a A ••.'a o `O R 10 • �' A r . View of an edge repair cast back on the Unit 1004 balconAft y View of carpet used to cure the new concrete for repairs on the Unit 904 balcony a r • ''��P L' View of cast backs in progress on the Unit 804 balconv ,,I- View of cast backs in progress on the Unit 604 balconv I r MWI View of cast backs in progress on the Unit 404 balconYOP 4_ 4*1 k- View of cast backs completed on the Unit 404 balcony P OFF J View of cast backs in progress on the Unit 304 balcony r ti i .L�•' rr@ - a 1kr� t. View of a cast back in progress on the Unit 204 balcony