HomeMy WebLinkAboutProgress Inspection Report 15 & 16 25 South d A KEYSTONE .• �. . •. 00 ENGINEERING & 4 : : : CONSULTING, INC Progress Inspection Report #15 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 8-27-21 Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 8-25-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: 07 stack cast backs, 06 stack handrail removal and edge repairs, Unit 805 door removal and excavations, and 04 stack post shore installations INSPECTOR'S REPORT Keystone Engineering visited the site on 8-25-21 and had several conversations with the construction team by telephone throughout the week. The construction crew cast back the 07 stack repairs and finished the stucco applications on the 06 stack. Workers removed all the handrails on the 06 stack, which revealed edge spalls that were missed before. New excavations are now in progress to repair concrete damage on the edge of several 06 units. The crew removed sliding glass doors and completed new excavations on the Unit 805 balcony, steel prep and form installations are in progress. Workers cast back the remaining repairs on the Unit 404 and 204 balconies. Post shore installations are in progress on several 04 stack units to dissipate the weight to prep for a column repair on the Unit 404 balcony. // 41, N0. 50068 f: q 3'1A'CE OF �a ZZ V//1�S�ON AL•E�607X�`�ti //t!/IINIIIIt1l���� i View of an edge spall marked for repair on the Unit 906 balcony '•k View of cast backs completed on the Unit 606 balconv 1 r, ti 1 q r r toQ ilk kpl, View of cast backs completed on the Unit 406 balcony 1 11 , t , .. �� ,j ,jp,,� � 'Sirs' 1 ;�►�r�. , •� Y w : View of corroded reinforcement exposed through an edge spall on the Unit 306 balcony 4 Additional view of corroded reinforcement and spalling on the edge of the Unit 306 balcony 31A View of stucco applications and handrails removed on the 06 balcony stack i, f/r S d ' s ,\ repairView of a surface progress on the Unit 805 balcony 110 View of an edge repair in progress on the Unit M 80 balcony 1 View of an additional •. progress on the Unit 805 balcony View a of excavationsprogress next to the windowon the Unit 805balcony A 7-7 1 dv 1 View of corroded steel and spalling extending past the window on the Unit 805 balcony a� i n ,tO► View of additional surface repairs in progress under a door on the Unit 805 balcony i r _ r r View of concrete repairs in progress under an additional door on the Unit 805 balcony t lip .�- � ��!: � y, ,� tom!�L��S•, View of a cast back in progress on the Unit 204 balcony View of post shores installed next to the column on the Unit 404 balcony 1 ' t � South25 • KEYSTONEAvenue,Cocoa Phone: • • ENGINEERING & : :: CONSULTING, INC. Progress Inspection Report #16 Permit #SLC 2102-0371 Project Name: Barclay Beach Club Progress Report thru 9-3-21 Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 9-2-21 Prime Contractor: Blue Coast Construction Superintendent: Rafael Rodriguez Activities in-progress: 06 stack cast backs, 07 stack stucco applications, Unit 605 and 405 door removal and demo, Unit 805, 404, and 904 door reinstallations INSPECTOR'S REPORT Keystone Engineering visited the site on 9-2-21 and had several conversations with the construction team by telephone throughout the week. This week the construction crew finished excavating the new edge spalls on the 06 stack, prepped the steel, and cast back the repairs. Stucco applications are nearly complete on the 07 stack. After cast backs were completed on the Unit 805 balcony workers reinstalled the sliding glass doors. Door reinstallations and interior barricade removal are also in progress on the Unit 404 and 904 balconies except for where the damaged column is on the Unit 404 balcony. The crew installed interior barricades and removed sliding glass doors on the Unit 605 and 405 balconies. New excavations were completed on the Unit 605 balcony and are in progress for 405. A pre-pour inspection was completed on Thursday, steel prep and cast backs are in progress. ,rti,;,eGttittffl r 3p No. 0068 •: STAVE OF Q' ,p P A% .• w Q,p•%. 4 p R�4 %//SS/o N AL•��G\\\\\� 54. • t View of surface repairs in progress under a door on the Unit 605 balcony •V • ` rt w View of additional surface repairs in progress under another door on the Unit 605 balcony I r T� View of a surface repair in progress on the Unit 605 balcony T. View of additional concrete repairs in of additional concrete repairs in progress on the Unit 605 balcon�on the Unit 605 balcony I t dft View of a new edge repair in progress on the Unit 204 balcony I 3�►6 _ r View of a cast back in progress for a new edge repair on the Unit 306 balcony 1 -- A`'i•i: progressView of additional cast backs in proaress for new edize repairs on the 06 stack View of stucco applications in