Progress Inspection Report #15
Permit #SLC 2102-0371
Project Name: Barclay Beach Club Progress Report thru 8-27-21
Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 8-25-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: 07 stack cast backs, 06 stack handrail removal and edge repairs, Unit 805
door removal and excavations, and 04 stack post shore installations
INSPECTOR'S REPORT
Keystone Engineering visited the site on 8-25-21 and had several conversations with the
construction team by telephone throughout the week.
The construction crew cast back the 07 stack repairs and finished the stucco applications on the
06 stack. Workers removed all the handrails on the 06 stack, which revealed edge spalls
that were missed before. New excavations are now in progress to repair concrete
damage on the edge of several 06 units. The crew removed sliding glass doors and
completed new excavations on the Unit 805 balcony, steel prep and form installations
are in progress.
Workers cast back the remaining repairs on the Unit 404 and 204 balconies. Post shore
installations are in progress on several 04 stack units to dissipate the weight to prep for
a column repair on the Unit 404 balcony.
//
41,
N0. 50068
f:
q 3'1A'CE OF �a ZZ
V//1�S�ON AL•E�607X�`�ti
//t!/IINIIIIt1l����
i
View of an edge spall marked for repair on the Unit 906 balcony
'•k
View of cast backs completed on the Unit 606 balconv
1 r,
ti
1
q
r
r
toQ
ilk kpl,
View of cast backs completed on the Unit 406 balcony
1
11
, t
, .. �� ,j ,jp,,� � 'Sirs' 1 ;�►�r�. ,
•� Y
w :
View of corroded reinforcement exposed through an edge spall on the Unit 306 balcony
4
Additional view of corroded reinforcement and spalling on the edge of the Unit 306 balcony
31A
View of stucco applications and handrails removed on the 06 balcony stack
i,
f/r S
d '
s ,\
repairView of a surface progress on the Unit 805 balcony
110
View of an edge repair in progress on the Unit
M
80 balcony
1
View of an additional •. progress on the Unit 805 balcony
View
a
of excavationsprogress next to the windowon the Unit 805balcony
A
7-7 1
dv
1
View of corroded steel and spalling extending past the window on the Unit 805 balcony
a�
i
n
,tO►
View of additional surface repairs in progress under a door on the Unit 805 balcony
i
r
_ r r
View of concrete repairs in progress under an additional door on the Unit 805 balcony
t
lip
.�- � ��!: � y, ,� tom!�L��S•,
View of a cast back in progress on the Unit 204 balcony
View of post shores installed next to the column on the Unit 404 balcony
1
'
t �
South25 •
KEYSTONEAvenue,Cocoa
Phone: • •
ENGINEERING & : ::
CONSULTING, INC.
Progress Inspection Report #16
Permit #SLC 2102-0371
Project Name: Barclay Beach Club Progress Report thru 9-3-21
Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 9-2-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: 06 stack cast backs, 07 stack stucco applications, Unit 605 and 405 door
removal and demo, Unit 805, 404, and 904 door reinstallations
INSPECTOR'S REPORT
Keystone Engineering visited the site on 9-2-21 and had several conversations with the
construction team by telephone throughout the week.
This week the construction crew finished excavating the new edge spalls on the 06 stack,
prepped the steel, and cast back the repairs. Stucco applications are nearly complete on
the 07 stack. After cast backs were completed on the Unit 805 balcony workers
reinstalled the sliding glass doors. Door reinstallations and interior barricade removal are
also in progress on the Unit 404 and 904 balconies except for where the damaged
column is on the Unit 404 balcony.
The crew installed interior barricades and removed sliding glass doors on the Unit 605 and 405
balconies. New excavations were completed on the Unit 605 balcony and are in
progress for 405. A pre-pour inspection was completed on Thursday, steel prep and cast
backs are in progress.
,rti,;,eGttittffl r
3p No. 0068 •:
STAVE OF Q'
,p P A% .• w
Q,p•%. 4 p R�4
%//SS/o N AL•��G\\\\\�
54.
• t
View of surface repairs in progress under a door on the Unit 605 balcony
•V • ` rt
w
View of additional surface repairs in progress under another door on the Unit 605 balcony
I
r
T�
View of a surface repair in progress on the Unit 605 balcony
T.
View of additional concrete repairs in of additional concrete repairs in progress on the Unit 605 balcon�on the Unit 605 balcony
I
t
dft
View of a new edge repair in progress on the Unit 204 balcony
I
3�►6 _
r
View of a cast back in progress for a new edge repair on the Unit 306 balcony
1
--
A`'i•i:
progressView of additional cast backs in proaress for new edize repairs on the 06 stack
View of stucco applications in