Progress Inspection Report #19
Permit #SLC 2102-0371
Project Name: Barclay Beach Cl
ub Progress Report thru 9-24-21
Project Address: 2800 SR-A1A, Hutchinson Island Inspection Visits: 9-24-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: 04 stack new excavations, 07 stack waterproofing and knockdown
textures, and 05 stack form stripping
INSPECTOR'S REPORT
Keystone Engineering visited the site on 9-24-21 and had several conversations with the
construction team by telephone throughout the week.
This week new spalls were discovered on the 04 stack and new excavations have been
completed. Spalls may have been easier to see after the handrails were removed or are
now revealing after the vibration of the excavations throughout the stack during the
project. Severe spalling was observed above a sliding glass door on the Unit 604
balcony, the contractor will need to build an interior barricade and remove the door to
allow access for excavation.
Workers removed the mesh protection from the 05 stack and stripped the forms from the recent
cast backs. Waterproofing and knockdown texture applications are in progress on the 07
stack.
It
hJo. 50088
s SIMTE OF
.Y l
- 1
I�vv,A-
View of a small column repair in progress on the Unit 204 balcony
} f
i » r
. r
z
r
b,
i�
View of a new edge repair in progress on the Unit 304 balcony
yX
is
"�}�.. a �•q• 9 I I
L'� r
r t N 1
1
i
tL•' \
� N
J�
View of a new edge repair in progress on the Unit 504 balcony
o.
f
. f
-,.,, ,�• tip.
Y" 1
View of new surface repairs in progress on the Unit 604 balcony
y \.\
tg} 1
v
t
`4
L
View of the severe spalling discovered above the Unit 604 sliding glass door
f
r
View of additional new excavations in of additional new excavations in progress on the Unit 604 balconvon the Unit 604 balcony
ell k- -N."
M �T
x, 14
{ Kw.,
Z�
T
View of corroded reinforcement in a new excavation on the Unit 904 balcony
South25 : • •
. .. : -. .
KEYSTONE
Phone: • •
ENGINEERING & : : :
CONSULTING, IN('.
Progress Inspection Report #20
Permit #SLC 2102-0371
Project Name: Barclay Beach Club Progress Report thru 10-1-21
Project Address: 2800 SR-Al A, Hutchinson Island Inspection Visits: 9-30-21
Prime Contractor: Blue Coast Construction
Superintendent: Rafael Rodriguez
Activities in-progress: 06 and 07 stack waterproofing, texturing, and painting, 05 stack handrail
removal and painting, 04 stack final repairs
INSPECTOR'S REPORT
Keystone Engineering visited the site on 9-30-21 and had several conversations with the
construction team by telephone throughout the week.
Waterproofing applications were completed on the 06 and 07 balcony stacks, knockdown
textures are still in progress. Painting is also in progress on the walls and ceilings for the
06 stack. This week the construction crew removed the existing handrails on the 05
stack and are painting the new stucco applications to prep surfaces for shutter track
reinstallations.
New excavations were completed where the new spalling was discovered above the Unit 604
sliding glass door. Workers prepped the existing reinforcement and cast back the repair
this week. The crew is repairing new spalls, removing remaining fasteners, and cleaning
up on the 04 stack balconies.
a
r r
•fir
No. 50068 �k
-o STATE OF
o �OR�� :
10 N A L S144 ����
f
h
View of the knockdown textures applied on the Unit 206 balconv
View of the knockdown textures applied on the Unit 106 balconv
-:,.gin
s ems:.:.
,.,. ,;:.
.:Vk�.:,. ..�u�r
ttM
�, � .
��� .
,.�' `
y � _..: �f
i. £
`so-(,:...f x�i� 1 ,,�
t�"�iE tJ1 tll,;,,,, p. ry C f,
�yam} }
� � _£
,, `�; � x � t ,.
�h fit. Y LY ��K �H�� � L�� �:;.
"�. .-� Iry �`'... ,.�. ,. &" s' �+.�,�f, .M.
Y
x 'da ice.
� 3w_:
���. 4-.;
i �N
• i
1
�4
l
1
h'
View of the painting in progress next to the 06 stack
t
�i
a
View of the handrail removalin progress on the 05 stack
• .. .
y
i
View of the full depth repair in progress above the Unit 604 sliding glass door