Loading...
HomeMy WebLinkAboutAPPROVED SGD780NOANOA No. 20-0429.03 Expiration Date: August 02, 2022 Approval Date: October 15, 2020 Page 1 MIAMI-DADE COUNTY PRODUCT CONTROL SECTION 11805 SW 26 Street, Room 208 DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175-2474 BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy PGT Industries, Inc. 1070 Technology Drive North Venice, FL 34275 SCOPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER -Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein and has been designed to comply with the Florida Building Code, including the High Velocity Hurricane Zone. DESCRIPTION: Series “SGD-780” Aluminum Sliding Glass Door w/900 & 1350 corner (Reinf/Non-Reinf)– L.M.I. APPROVAL DOCUMENT: Drawing No. MD-780.0 Rev C titled “Aluminum Sliding Glass Door (LM)”, sheets 1 through 18 of 18, dated 10/05/15 and last revised on 04/22/20, prepared by PGT Industries, signed and sealed by Anthony Lynn Miller, P. E., bearing the Miami–Dade County Product Control Revision stamp with the Notice of Acceptance number and Expiration date by the Miami–Dade County Product Control Section. MISSILE IMPACT RATING: Large and Small Missile Impact Resistant Limitations: 1.Max Panels configuration is allowed per tables 1 thru 3, not to exceed 462.11 ft2. The inside/outside 900 & 1350 corner units are limited to straight panel each corner side per tables 1 thru 3. 2.See sheets 7 & 8 for Design Pressure (DP), glass type, sill type for positive DP limit, applicable reinforcement and anchorage quantity requirements. See sheet 11 for glass options. See sheets 12 thru 15 for anchors lay out at tracks and corners. See Pocket anchor details in sheet 6. 3.Pockets wall, cavity is not part of this approval. Exterior/Interior Pocket wall & applicable Egress requirement to be reviewed by Building official. LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and series and following statement: "Miami-Dade County Product Control Approved", noted herein. RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This NOA revises #17-0420.04 and consists of this page 1 and evidence pages E-1, E-2 & E-3, as well as approval document mentioned above. The submitted documentation was reviewed by Ishaq I. Chanda, P.E. Ishaq I. Chanda, P.E. Product Control Unit Supervisor NOA No. 20-0429.03 Expiration Date: August 02, 2022 Approval Date: October 15, 2020 E- 1 PGT Industries, Inc. NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED 1. Evidence submitted under previous approvals A. DRAWINGS 1. Manufacturer's die drawings and sections (Submitted under files # listed below) 2. Drawing No. MD-780.0 Rev B titled “Aluminum Sliding Glass Door (LM)”, sheets 1 through 18 of 18, dated 10/05/15 and last revised on 07/17/17, prepared by PGT Industries, signed and sealed by Anthony Lynn Miller, P.E. B. TESTS 1. Test reports on: 1) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 2) Large Missile Impact Test per FBC, TAS 201-94 3) Cyclic Wind Pressure Loading per FBC, TAS 203-94 Along with marked–up drawings and installation diagram of Aluminum SGD (w TPS, Super, Cardinal & Duraseal spacers), prepared by Fenestration Testing Laboratory, Inc., Test Reports No(s) FTL–8717, FTL-8970 and FTL-8968, dated 02/15/16, 06/07/16 and 06/20/16, all signed and sealed by Idalmis Ortega, P. E. 2. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 3) Water Resistance Test, per FBC, TAS 202-94 4) Large Missile Impact Test per FBC, TAS 201-94 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 6) Forced Entry Test, per FBC 2411 3.2.1, TAS 202-94 Along with marked–up drawings and installation diagram of Aluminum SGD w/1350 interior/Exterior corner & interior pocket mount, prepared by Fenestration Testing Laboratory, Inc., Test Reports No(s) FTL–8322 and FTL-8374, dated 08/06/15, both signed and sealed by Idalmis Ortega, P. E. (Addendum letter dated Jan 18, 2016, issued by Fenestration Testing Lab) Along with marked–up drawings and installation diagram of Aluminum SGD, prepared by Architectural Testing, Inc., Test Report No. ATI–8124.01-401-18 R, dated 11/13/2008, signed and sealed by Joseph A. Reed, P.E. (submitted under files # 12-0516.04) Along with marked–up drawings and installation diagram of Aluminum SGD, prepared by Fenestration Testing Laboratory, Inc., Test Reports No(s) FTL–5618, dated 06/21/2008, FTL– 5619, dated 07/07/2008, FTL–5254, dated 05/17/2007 and FTL–5273, dated 05/07/2007 respectively, all signed and sealed by Carlos S. Rionda, P. E.(Submitted under file #11- 1018.12). C. CALCULATIONS 1. Anchor verification calculations and structural analysis dated 04/08/17 and last revised on 07/17/17, complying with FBC-2017 (6th Edition), prepared by PGT, signed and sealed by Lynn Miller, P.E. 2. Anchor verification calculations and structural analysis dated 01/20/16, complying with FBC-2014 (5th Edition), prepared by PGT, signed and sealed by Lynn Miller, P.E. (submitted under file #15-0903.09) 3.Glazing complies w/ ASTME-1300-02, 04 & -09. Ishaq I. Chanda, P.E. Product Control Unit Supervisor NOA No. 20-0429.03 Expiration Date: August 02, 2022 Approval Date: October 15, 2020 E-2 PGT Industries, Inc. NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED D. QUALITY ASSURANCE 1.Miami Dade Department of Regulatory and Economic Resources (RER) E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 14-0916.11 issued to Kuraray America, Inc. (Former E.I. DuPont DeNemours & Co., Inc.) for the “Sentry Glass ® (Clear and White) Glass Interlayers”, expiring on 07/04/18. 2.Notice of Acceptance No. 16-1117.01 issued to Kuraray America, Inc. (Former E.I. DuPont DeNemours & Co., Inc.) for the “Trofosil Ultra clear & color PVB Interlayers (former Butacite)”, expiring on 07/08/19. F.STATEMENTS 1. Statement letter of conformance to FBC 2017 (6 th Edition) and FBC 2014(5th edition), prepared by PGT, dated July 17, 2017, signed and sealed by Lynn Miller, P.E. 2.Statement letter of conformance to FBC 2014(5th edition) and letter of no financial interest, prepared by PGT, dated 08/28/15, signed and sealed by Lynn Miller, P.E. (submitted under file #15-0903.09) 3. Spacer reference e-mail by PGT dated Jan 13, 2016, signed by Lynn Miller, P.E. 4.Lab compliance as part of the above referenced test report. G. OTHER 1.This NOA revises & renews NOA #16-0629.10, expiring 08/02/22. 2. Test proposal # 07-2583, approved by BCCO, #14-1739 & 17-0387 approved by RER. 2.New Evidence submitted A.DRAWINGS 1. Drawing No. MD-780.0 Rev C titled “Aluminum Sliding Glass Door (LM)”, sheets 1 through 18 of 18, dated 10/05/15 and last revised on 04/22/20, prepared by PGT Industries, signed and sealed by Anthony Lynn Miller, P. E. B. TESTS 1.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94 3) Water Resistance Test, per FBC, TAS 202-94 4)Large Missile Impact Test per FBC, TAS 201-94 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 along with marked-up drawings and installation diagram of all PGT Industries, Inc. representative units listed below and tested to qualify Dowsil 791 and Dowsil 983 silicones, prepared by Fenestration Testing Laboratory, Inc., Test Reports No.: FTL-7897, PGT PW5520 PVC Fixed Window (unit 6 in proposal), dated 09/03/14 FTL-20-2107.1, PGT SGD780 Aluminum Sliding Glass Door (unit 7 in proposal) FTL-20- 2107.2, PGT CA740 Alum. Outswing Casement Window (unit 8 in proposal) FTL-20-2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4, PGT PW7620A Aluminum Fixed Window (unit 10 in proposal) dated 07/13/20, all signed and sealed by Idalmis Ortega, P.E. Ishaq I. Chanda, P.E. Product Control Unit Supervisor NOA No. 20-0429.03 Expiration Date: August 02, 2022 Approval Date: October 15, 2020 E - 3 PGT Industries Inc. NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED B.CALCULATIONS 1. Anchor verification calculations and structural analysis, complying with FBC 7th Edition (2020), dated 04/22/20, prepared by manufacturer, signed and sealed by Anthony Lynn Miller, P.E. 2. Glazing complies with ASTM E1300-04, -09, -12 and -16. D. QUALITY ASSURANCE 1.Miami Dade Department of Regulatory and Economic Resources (RER). E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc. (Former E.I. DuPont DE Nemours & Co., Inc.) for the “Sentry Glass ® (Clear and White) Glass Interlayers”, expiring on 07/04/23. 2.Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. (Former E.I. DuPont DE Nemours & Co., Inc.) for the “Trofosil Ultra clear & color PVB Interlayers (former Butacite)”, expiring on 07/08/24. F.STATEMENTS 1.Statement letters of conformance to FBC 2020(7th Edition), dated 04/18/20, prepared, signed & sealed by Lynn Miller, P. E. G. OTHER 1.This NOA revises NOA #17-0420.04 and updates to FBC 2020 (7th Edition), expiring 08/02/22. 2.RER Test proposals #19-1155 dated 01/10/20 approved by Ishaq I. Chanda, P.E, expiring 04/14/21expiring 04/07/25.