Loading...
HomeMy WebLinkAboutProject Information0 t -�- wrightsoft® Load Short Form Entire House For: DENNIS AND BRENDA BALSER, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Htg Clg Outside db (OF) 43 91 Method Inside db (OF) 68 75 Construction quality Design TD (OF) 25 16 Fireplaces Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/lb) 18 59 HEATING EQUIPMENT Make rheem Trade 14 ajm Model AHRI ref Efficiency 100 EFF Heating input 4.8 kW Heating output 16435 Btuh Low output baseboard 500 Btuh/ft Total low baseboard 44 ft High output baseboard 700 Btuh/ft Total high baseboard 31 ft Space thermostat Job: balser Date: 4-27-15 By: Infiltration Simplified Average 0 COOLING EQUIPMENT Make rheem Trade rheem Cond 14 ajm 36 Coil RHKLHM 3821 AHRI ref 3805982 Efficiency 13.0 EER, 16 SEER Sensible cooling 25760 Btuh Latent cooling 11040 Btuh Total cooling 36800 Btuh Actual air flow 580 cfm Air flow factor 0.022 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0.82 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Baseboard (ft) Low High Clg AVF (cfm) MASTER BEDROOM 133 2747 4108 5 4 90 W.I.CLOS 42 473 933 1 1 21 master bath 58 464 473 1 1 10 bedroom #2 93 601 907 1 1 20 bedroom # 2 clos 14 149 390 0 0 9 bedroom #3 101 2476 2560 5 4 56 bath 0 765 794 2 1 17 stairs 46 1271 2197 3 2 48 hall 33 1789 2795 4 3 61 greatroom 260 4499 3938 9 6 87 kitchen 87 908 1686 2 1 37 utility 23 768 878 2 1 19 stairs 1st floor 95 3287 2934 7 5 65 powder room 25 804 884 2 1 19 .1. .....L......:a... -I-- An 0-in nnn n A nn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft® Rlght-Suite® Universal 2015 15.0.16 RSU20741 ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser .rup Calc = MJ8 Building Front faces: W T:14:29 Page 1 Entire House 1029 21812 26379 44 31 580 Other equip loads 0 0 Equip. @ 0.95 RSM 25192 Latent cooling 5936 T/ITA1 Q 4n')n 11404n 1344nn A OA con Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. c wri htsoft° 2015-May-0819:10:16 �. 9 Right-Suite�al Universal 2015 15.0.16 RSU20741 Page 2 ...elDocuments\Wrightsoft HVAC\CLIENTS\Balser .rup Cale = MJ8 Building Front faces: W ' . I -- wrightsoft® Building Analysis Entire House For: DENNIS AND BRENDA BALSER 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 280N Outdoor: Heating Dry bulb (°F) 43 Daily ran( aF� °F) - Wet bulb ° - Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (°F) Relative humiddity (%) Cooling Moisture difference (gr/lb) 96 Infiltration: ion: ( L ) etConstruction 78 quality 7.5 Fireplaces Component Btuh/ft2 Btuh % of load Walls 9.4 13664 62.6 Glazing 19.8 1946 8.9 Doors 0 0 0 Ceilings 1.1 1127 5.2 Floors 0.9 1079 4.9 Infiltration 1.1 1689 7.7 Ducts 2306 10.6 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 121812 100.0 Component Btuh/ft2 Btuh % of load Walls 7.6 11030 41.8 Glazing 45.77 45088 17.11 DoorCeilings 3.2 3291 12.5 Floors 0.6 672 2.5 Infiltration 0.3 537 2.0 Ducts 2892 11.0 Ventilation 0 0 Internal gains 3450 13.1 Blower 0 0 Adjustments 0 To9l 26379 100.0 Latent Cooling Load = 5936 Btuh Overall U-value = 0.192 Btuh/ft2-°F Data entries checked. Job: balser Date: 4-27-15 By: Heating 25 50 18.1 Simplified Average 0 Cooling 16 50 58.7 't WI.1 htsoftm 2015-May-09 07:17:16 1 g Right -Suite® Universal 2015 15.0.16 RSU20741 Page 1 '4C�Ck ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser .rup Calc = MJ8 Building Front faces: W ® Component Constructions Job: balser ' wrightsoft p Cate: 4-27-15 MASTER BEDROOM By: �•ject Intormation For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 - Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 ' Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft?'F fN-'F/6tuh Btuh& Btuh MAN Btuh Walls 13AA-Ooc: Blk wall, 2'W' wood int frm, 8" thk, 5/8" gypsum board int n 70 0.584 0 14.5 1018 11.7 822 fnsh 13AB-Oocs: Blk wall, stucco ext, 2'V" wood int frm, 8" thk, 5/8" w 70 0.258 0 6.42 446 5.19 360 gypsum board int fnsh Partitions (none) Windows 4A5-2om: 2 glazing, cir low-e outr, air gas, mtl no brk frm mat, cir w 23 0.770 0 19.2 431 47.5 1069 innr, 1/4" gap, 1/8" thk; 6 ft overhang (3.2 ft window ht,10.5 It sep.); 6.6 ft head ht Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" 133 0.044 21.0 1.10 146 3.20 427 gypsum board int fish Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 133 0.045 21.0 0.89 119 0.56 74 gypsum board int fnsh - 19A-21cscp: Flr floor, frm fir, 12" thkns, carpet flr fnsh, r-21 cav ins, 133 0.045 21.0 0.89 119 0.56 74 tight crwl ovr wri htsoft° 2015-May-0818:65:22 �. 9 Right -Suite® Universal 2016 15.0.16 RSU20741 Page 3 �iCCA ...e0ocuments\Wrightsoft HVAC%CLIENTS1Balser .rup Cale - MJ8 Building Front faces: W Job: balser -- wrightsoft® Component Constructions Date: 4-27-15 MCLOS By: For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 280N Outdoor: Heating Dry bulb (OF) 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L ) Method 78 Construction quality 7.5 Fireplaces Heating Cooling 68 75 25 16 50 50 18.1 58.7 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W BWh/ft? °F W T/Btuh BWhff Btuh BWhM' BWh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" w 40 0.258 0 6.42 257 5.19 207 gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 cell ins, 5/8" 42 0.044 21.0 1.10 45 3.20 133 gypsum board int fnsh Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 42 0.045 21.0 0.89 37 0.56 23 gypsum board int fnsh 19A-21cscp: Flr floor, frm fir, 12" thkns, carpet fir fnsh, r-21 cav ins, 45 0.045 21.0 0.89 40 0.56 25 tight crwl ovr A wri htsofts g 2015-May-0818:55:22 9 RI ht-Sulte® Universal 2015 15.0.16 RSU20741 Page 4 ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser .nip Calc = MJ8 Building Front faces: W 27-1ti t t Co nstructions Job: 4- • � balser wrightsoft® CDate: 427-15 master bath By: For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Desinn Conditir Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry. bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" gypsum board Intfnsh Floors 19A-21 bstp: Part floor, tile fir fnsh, r-21 ins, firm fir, 12" thkns, 5/8" gypsum board int fnsh Or Area U-value Instil R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'--°F W- F/Btuh BIuhM' Btuh BtuhAt' Btuh w 40 0.258 0 6.42 257 5.19 207 58 0.044 21.0 1.10 58 0.045 21.0 0.89 63 3.20 184 51 0.56 32 . ► +55 Page 5wrightsoft® Right -Suite® Universal 2015 15.0.16 RSU20741 2015 May-08 18:age 5 .,.elDocuments\Wrlghtsoft HVAC\CLIENTS\Balser trap Calc = MJ8 Building Front faces: W Component Constructions Job: balser wrightsoft- Date: 4-27-15 bedroom #2 By: Project • • For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Design Conditions Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft'-°F/Btuh Btuh/ft' Btuh MAN Btuh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 cell ins, 5/8" gypsum board int fnsh Floors 19A-2lbstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" gypsum board int fnsh W 47 0.258 0 6.42 302 5.19 244 93 0.044 21.0 1.10 102 3.20 297 93 0.045 21.0 0.89 83 0.56 52 wri htsoft° 2015-May-0818:55:22 % 9 Right-SuSe® Universal 2015 15.0.16 RSU20741 Page 6 ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser .rup Calc = MJ8 Building Front faces: W © Component Constructions Job: balser wrightsoft p Date: 4-27-15 bedroom # 2 clos By: Project I• • For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Design Conditions Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (°F) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul lk Htg HTM Loss Clg HTM Gain ft' MuhIIF-°F ft? °F/Btuh Btuh&2 Btuh Btuh/ft' Btuh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md:Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" gypsum boardint fnsh Floors 19A-2lbstp: Part floor, tile fir fnsh, r-21 ins, firm fir, 12" thkns, 5/8" gypsum board int fnsh w 14 0.258 0 6.42 90 5.19 14 0.044 21.0 1.10 15 3.20 14 0.045 21.0 0.89 13 0.56 73 45 8 wri htsoft° 2015-May-0818:55:22 9 Right -Suite® Universal 2015 15.0.16 RSU20741 Page 7 ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser sup Calc = MJ8 Building Front faces: W -- wrightsoft® Component Constructions bedroom #3 Project Inf• rm ation For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 280N Outdoor: Heating Dry bulb (°F) 43 Daily range (°F) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L ) Method 78 Construction quality 7.5 Fireplaces Job: balser Date: 4-27-15 By: Heating Cooling 68 75 25 16 50 50 18.1 58.7 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fY BtuhAl'--°F fl'-°F/Btuh Btuhff Btuh Btuh/f2 Btuh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int firm, 8" thk, 5/8" a 114 0.258 0 6.42 732 5.19 591 gypsum board int fnsh s 84 0.258 0 6.42 539 5.19 435 all 198 0.258 0 6.42 1271 5.19 1026 Partitions (none) Windows 1D-c2om: 2 glazing, clr outr, air gas, mtl no brk frm mat, cir innr, s 23 0.870 0 21.7 500 27.7 641 1/4" gap,1/8" thk;1 ft overhang (5.2 ft window ht, 0.6 ft sep.): 6.6 ft head ht Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 cell ins, 5/8" 101 0.044 21.0 1.10 111 3.20 323 gypsum board int fnsh Floors 19A-21bstp: Part floor, the fir fnsh, r-21 ins, firm fir, 12" thkns, 5/8" 101 0.045 21.0 0.89 90 0.56 56 gypsum board int fnsh •. wri htsoft° 2015 May o8 18:55:22 A- 9 Right -Suite® Universal 2015 15.0.16 RSU20741 Page 8 ACCA ...e\Documents\Wrightsoft HVAC\CLIENTS\Balser .rup Calc = MJ8 Building Front faces: W Component Constructions Job: balser WrlghtSOft® bathDDa e: 4-27-15 Project Information For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Design • • • Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft? °F W-°F/Btuh Btuh/ft' Btuh BtuhN Btuh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" a 91 0.258 0 6.42 585 5.19 472 gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors (none) wri htsoft° 2015-May-0818:55:22 g Right -Suite® Universal 2015 15.0.16 RSU20741 Page 9 ...elDocumentslWrlghtsoft HVAC\CLIENTS\Balser .rup Calc = MJ8 Building Front faces: W - wrightsoft® Component Constructions stairs For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 28ON Outdoor: Heating Dry bulb (OF) 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L ) Method 78 Construction quality 7.5 Fireplaces Job: balser Date: 4-27-15 By: Heating 68 25 50 18.1 Simplified Average 0 Cooling 75 16 50 58.7 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain T Btuhrtt'--°F ft'-°F/Btuh Btuh/t' Btuh Btuh/ft' BWh Walls 13AB-Oocs: Blk wall, stucco e)t, 2"x4" wood int frm, 8" thk, 5/8" a 77 0.258 0 6.42 495 5.19 399 gypsum board int fnsh Partitions (none) Windows 4A5-2om: 2 glazing, clr low-e outr, air gas, mtl no brk frm mat, clr a 23 0.770 0 19.2 441 47.5 1092 innr,1/4" gap,1/8" thk; 1 ft overhang (4.2 ft window ht, 10.5 ft sep.); 11.3 ft head ht Doors (none) Ceilings 6A 21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" ypsum board int fnsh Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" gypsum board int fnsh 46 0.044 21.0 1.10 46 0.045 21.0 0.89 51 3.20 148 41 0.56 26 wri htsoft° 2015•May-0818:55:22 A= 9 Right-Sufte® Universal 2015 15.0.16 RSU20741 Page 10 1CA ...e0ocumentsMightsoft HVAMCLIENTMalser .rup Calc = MJ8 Building Front faces: W -1- wrightsoft° Component Constructions hall •liect intormation For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Job: balser Date: 4-27-15 By: Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fP Btuh&2--°F W TBtuh BtuhAt' Btuh Btuhtft- Btuh Walls 13AA-Ooc: Blk wall, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int n 64 0.584 0 14.5 931 11.7 751 fnsh 13AB-0ocs: Blk wall, stucco ext, 2"x4" wood int firm, 8" thk, 5/8" w 17 0.258 0 6.42 109 5.19 88 gypsum board int fnsh Partitions (none) Windows 4A5-2om: 2 glazing, cir low-e outr, air gas, mtl no brk frm mat, clr w 20 0.770 0 19.2 383 47.5 950 innr, 1/4" gap, 1/8" thk; 6 ft overhang (3.2 ft window ht, 10.5 ft sep.); 6.6 ft head ht Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 cell ins, 5/8" 33 0.044 21.0 1.10 36 3.20 106 gypsum board int fnsh Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 33 0.045 21.0 0.89 30 0.56 18 gypsum board int fnsh wri htsoft° 2015-May-0818:55:22 9 Right-Sufte® Universal 2016 15.0.16 RSU20741 Page 11 ..elDocurnents\Wrightsoft 1-1VACTLIENTS1Balser .rup Cale = MJ8 Building Front faces: W wrightsoft® Component Constructions Job: Date: balser 4-27-15 greatroom By: Project Information For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Design Conditions Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/W--°F W-°FBtuh Btuh/H' stun Btuh/t' Btuh Walls 13AA-Ooc: Blk wall, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int n 142 0.584 0 14.5 2065 11.7 1667 fnsh 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" w 171 0.258 0 6.42 1099 5.19 887 gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" 260 0.044 21.0 1.10 285 3.20 833 gypsum board int fnsh Floors 19A-2lbstp: Part floor, the fir fish, r-21 ins, frm fir, 12" thkns, 5/8" 260 0.045 21.0 0.89 233 0.56 145 gypsum board int fnsh wrhtsoft� 2015 May-08 18:55:22 il .` 9 Right-Sufte® Universal 2015 15.0.16 RSU20741 Page 12 ACC�" ...e\Documents\Wrightsoft HVACMCLIENTMalser .rup Calc = MJ8 Building Front faces: W - wrightsoft, Component Constructions kitchen For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 280N Outdoor: Heating Dry bulb (OF) 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L ) Method 78 Construction quality 7.5 Fireplaces Job: balser Date: 4-27-15 By: Heating Cooling 68 75 25 16 50 50 18.1 58.7 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W BtuhM2--°F ft'-°F/Btuh Btuh/W Ruh BbuhlR' Ruh Walls 13AB-Oocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" w 58 0.258 0 6.42 373 5.19 301 gypsum board int fnsh Partitions (none) Windows 4A5-2om: 2 glazing, cir low-e outr, air gas, mtl no brk frm mat, cir w 10 0.770 0 19.2 192 47.5 475 innr, 1/4" gap, 1/8" thk; 6 ft overhang (3.2 it window ht, 10.5 ft sep.); 6.6 ft head ht Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" gypsum board int fnsh Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" gypsum board int fnsh 87 0.044 21.0 1.10 87 0.045 21.0 0.89 95 3.20 278 78 0.56 48 wri htsoft, 2015-May-0819:24:58 �- 9 Right -Suite® Universal 2015 15.0.16 RSU20741 Page 13 A ...e\DocurnentsMightsoft HVACICLIENTSIealser .rup Calc = MJ8 Building Front faces: W Job: balser -�- wrightsoft® Component Constructions Date: 4-27-15 Utility By - Project Information - For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Conditions —Design Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 25 16 Latitude: 28°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (°F) 43 91 Infiltration: Daily range (°F) - 16 ( L ) Method Simplified Wet bulb (°F) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft' Btuh/ft'--'F ft? °F/Btuh BWh/ft' Btuh BWhm Btuh Walls 13AA-Ooc: Blk wall, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int n 41 0.584 0 14.5 596 11.7 481 fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" 23 0.044 21.0 1.10 25 3.20 73 gypsum board int fnsh Floors 19A-21bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 23 0.045 21.0 0.89 20 0.56 13 gypsum board int fnsh .� WCI htsoft° 2015-May-0819:13:40 9 Rlght-Suite® Universal 2015 15.0.16 RSU20741 Page 14 ...eMocumentslWrightsoft HVACICLIENTSIBalser .rup Cale = MJ8 Building Front faces: W 1 -�- wrightsoft® Component Constructions stairs 1st floor For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 280N Outdoor: Heating Dry bulb (OF) 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L } Method 78 Construction quality 7.5 Fireplaces Job: balser Date: 4-27-15 By: Heating Cooling 68 75 25 16 50 50 18.1 58.7 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuhfl?--°F ft'-°F/Btuh Btuhlft' Btuh Etuhlft' Btuh Walls 13AA-Ooc: Blk wall, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int n 176 0.584 0 14.5 2559 11.7 2066 fish Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md: Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" gypsum board int fnsh Floors 19A-2lbstp: Part floor, tile fir fnsh, r-21 ins, firm fir, 12" thkns, 5/8" gypsum board int fnsh 95 0.044 21.0 95 0.045 21.0 1.10 104 3.20 303 0.89 85 0.56 53 htsoft 2015-May-08 19:13:40 wri �► . 9 m Right-Sufte® Universal 2016 15.0.16 RBU20741 Page 15 ��` ...elDocuments\Wrightsoft HVAC\CLIENTS\Balser .rup Cale = MJ8 Building Front faces: W f 0 - wrightsoft® Component Constructions powder room For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Location: Vero Beach Municipal AP, FL, US Elevation: 30 ft Latitude: 28 °N Outdoor: Heating Dry bulb 0 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 91 Infiltration: 16 ( L ) Method 78 Construction quality 7.5 Fireplaces Job: balser Date: 4-27-15 By: Heating Cooling 68 75 25 16 50 50 18.1 58.7 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' BtuhflF-°F ft'-TlBtuh BWhlft' Btuh BWhAll Ruh Walls 13AB-0ocs: Blk wall, stucco ext, 2"x4" wood int frm, 8" thk, 5/8" s 34 0.258 0 6.42 218 5.19 176 gypsum board int fnsh w 55 0.258 0 6.42 353 5.19 285 all 89 0.258 0 6.42 572 5.19 462 Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md:Attic ceiling, mtl roof mat, r-20 roof ins, r-21 ceil ins, 5/8" 25 0.044 21.0 1.10 28 3.20 81 gypsum board int fnsh Floors 19A-21 bstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 25 0.045 21.0 0.89 23 0.56 14 gypsum board int fnsh wri htsoft® 2015-May-08 19:13:40 9 Rfght-Suite® Universal 2015 15.0.16 RSU20741 Page 16 ...e\Documents\Wdghtsoft HVACICLIENTS1Balser .rup Cafc = MJ8 Building Front faces: W - - wrightscft Component Constructions ballse Date: 5 dumbwaiter clos By: Project I• • • For: dennis and brenda, NA 10701 S OCEAN DR. LOT 4, JENSEN BEACH, FL. 34957 Design Conditions Location: Indoor: Heating Cooling Vero Beach Municipal AP, FL, US Indoor temperature (OF) 68 75 Elevation: 30 ft Design TD (OF) 25 16 Latitude: 280N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 18.1 58.7 Dry bulb (OF) 43 91 Infiltration: Daily range (OF) - 16 ( L ) Method Simplified Wet bulb (OF) - 78 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/R'--°F ft"F/BWh Btuh/R' Btuh RAW Btuh Walls 13AA-Ooc: Blk wall, 2"x4" wood int frm, 8" thk, 5/8" gypsum board int n 44 0.584 0 14.5 640 11.7 516 fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16A-21md:Attic ceiling, mill roof mat, r-20 roof ins, r-21 ceil ins, 5/8" 19 0.044 21.0 1.10 21 3.20 62 gypsum board int fnsh Floors 19A-2lbstp: Part floor, tile fir fnsh, r-21 ins, frm fir, 12" thkns, 5/8" 19 0.045 21.0 0.89 17 0.56 11 gypsum board int fnsh wri htsoft° 2015-May-0819:13:40 9 Right -Suite® Universal 2015 MO. 16 RSU20741 Page 17 ...e0ocuments\Wrightsoft HVACICLIENTS1Balser .rup Cale = MJ8 Building Front faces: W This combination qualifies for a Federal Energy Efficiency Tax Credit when placed in service between Feb 17, 2009 and Dec 31, 2014. Certificate of Product Ratings AHRI Certified Reference Number: 3805982 Date: 5/8/2015 Product: Split System: Air -Cooled Condensing Unit, Coil with Blower Outdoor Unit Model Number: 14AJM36 Indoor Unit Model Number: RHKL-HM3821+RCSL-H*3821 Manufacturer: RHEEM SALES COMPANY, INC. Trade/Brand name: RHEEM; RUUD; WEATHERKING Region: Series name: Manufacturer responsible for the rating of this "system combination is RHEEM SALES COMPANY, iNC* Rated as follows in accordance with AHRI Standard 210/240-2008 for Unitary Air -Conditioning, and Air -Source Heat Pump Equipment and -subject to verification of rating accuracy by AHRI sponsored, independent, third party testing:;U. : _ k - " r t 2- .- _ � 1 V 1 S 1. 4 i Y i `. / 4 E ., .f ✓ i". i n t_ " :-Coolin 9Ca aci (Btuh) 36800 _ P V, EER Rating=(Cooling) - 13 00 -'SEER Rating (Cooling) 16.00 IEER Rating (Cooling): * Ratings followed by an asterisk (*) indicate a voluntary rerate of previously published data, unless accompanied with a WAS, which indicates an involuntary rerate. DISCLAIMER AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for, the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed In the directory at www.ahrldlrectory.org. TERMS AND CONDITIONS This Certificate and Its contents are proprietary products of AHRI. This Certificate shall only be used for Individual, personal and confidential reference purposes The contents of this Certificate may not, In whole or In part, be reproduced; copied; disseminated;�1 entered Into a computer database; or otherwise utilized, In any form or manner or by any means, except for the user's Individual, personal and confidential reference. &IRONDI o 6, N , CERTIFICATE VERIFICATION QE The information for the model cited on this certificate can be verified at www.ahrldlrectory.org, click on "Verify Certificate" link we make life better - and enter the AHRI Certified Reference Number and the date on which the certificate was issued, which Is listed above, and the Certificate No., which Is listed at bottom right. = ©2014 Air -Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 130755912838884013 ft Donald J. Nuelle P.E. 6304 Garrett Street Jupiter, FL William Durden St. Lucie County Building Department 2300 Virginia Ave Ft. Pierce, FL 34982 RE: Balser Residence 10725 S. Ocean Drive Lot 4 Jensen Beach, FL Sheet A-1 Dear Mr. Durden; Date: 2/2/09 This letter will serve as my notice that the handwritten changes on sheet A-1 of the above referenced sheet are my hand written changes and I have initialed the changes. Unfortunately, the residential designer did not change the mistake so I had to change them by hand. The mullion applied pressures are +46.2 psf and — 50.9 psf. If you have any questions or require additional information please contact me at (561)-629-6975. Si re ., n /5 Donald J. Nuelle P.E. 52046 1