HomeMy WebLinkAboutProduct Approval Diagram(3) #4/0 (THW) copper
and (1) #2 ground (THW)
copper in 2 galy. conduit
Panel: 200 A.M.C.B. 200 Amp
1,6, 3W 40 Circuit Panel
120/240 Volt 1
O
disc. (3) #4/0 (THW) copper
and (1) #2 ground (THW)
copper in 2" galy. conduit
5/8"" dia. x 10'-0 F.P.L. service
long ground rod N3/4"" copper
water pipe 1
MM
tie ground wire
to footing rebars
I Riser la
Electrical Load Calcu'lations
2267 Living S.F. at 3 VA
6801 watts
One 20 Amp Appliance Ckts.
1500 watts
Two Laundry Cir. @ 1500 watts
3000 watts
One Range
8000 watts
One Dishwasher & One Disposal @ 1500 watts each
3000 watts
One Microwave @ 2000 watts
2000 watts
One Dryer @ 5 kw
5000 watts
Ref. @ 1500 watts
1500 watts
Three Baths @ 1500 watts each
4500 watts
Water Heater
8500 watts
Total 43,801 watts
First 10 KVA at 100% 10,000 watts
Remainder at 40% 13,520 watts
Total 23,520 watts
One AC Heat at 100% 10,000 watts
Total 33,520 watts
33,520 W / 240 V = 140.0 Amps
Use 200A Service
Smoke detectors wired to 120V Bathroom lights
Non Switchable, Non GFI
Electrical contractor to verify all equipment loads prior to
start of construction. Electrical contractor to recalculate
electrical schedule if loads are to be modified
c r^
Elect£ a-� %"
1. All loads to be checked by a Florida Licensed Electrician
Z All work to meet the National Electrical Code
3. Calculations and panels below are for sizing conduit and overall
building load requirements only
4. All conductors to be copper; all insulation to be THHN. Conduit as
follows: PVC below ground, Rigid from underground to service box
for exterior lights on building; AC, MC, or EMT conduit elsewhere.
5. Ensure min. 36" clear between equipment and disconnects, Typical.
wp
Septic
System
Hook Up
Electric y
scale: 1/4`" = 1'-0"
PR0E,"
Approval Glass Building Rated Product Rated
Product Model Number Manufacturer Attachment Method
Number Type Design Pressures Design Pressures
Head: 6"max. from corners & 13-max. o.c. Jambs: 6-max. from
NOA: 17-1212.21
S.H. Windows
7700
Lawson
Impact
corners 10"max. o.c. above meeting rail & 9-o.c. below meeting
rail & 3-each side of meeting rail.. Use 1 /4"" Tapcon with 1 1 /4""
+38.7 -50.5
+/-60.0
embedment into concrete
Head and Sill: 5.75"and 11.75 from corners & 12.75"max. o.c.
NOA: 18-0503.06
French Door
2200
Lawson
Impact
Jambs: 5""max. and 17`"o.c. max. o.c. Use 5/16"" Tapcon with
+34.4 -37.8
+/-76.0
1 1 /2"" embedment into concrete.
6"" from corners & 14,5""o.c. at Jambs. Head and Sill 3- and
FL#: 20468.4
Swing Doors
Fiberglass
Therma-Tru
N.A.
7- from centerline. Use 1 /4"" Tapcon with 1 1 /4"" embedment
+34.4 -37.8
+/- 50.0
into concrete
6"" from corners & 14.5-o.c. at Jambs. Head and Sill 3"" and
FL#: 20468.12
Swing Doors
Fiberglass
Therma-Tru
Impact
7"" from corners & centerline. Use 1 /4"" Tapcon with 1 1 /4""
+34.4 -37.8
+/- 50.0
embedment into concrete
Approval
Building Rated
Product Rated
Product
Model Number
Manufacturer
Attachment Method
Number
Design Pressures
Design Pressures
FL#:22259.1
Underlayment
Beacon Tri Built
Owens Corning
Direct to Deck
-45.0
-150.0
FL#: 14645.2
Roofing
5V Crimp
Metal Sales Mfg.
#10-14 hex head screws with sealing washer along panel 12"o.c. Fastener
-45.0
-149.6
to penetrate the plywood a minimum of 3/8 .
Meter
ELEC i RIGAL LEDGEND
j0 RECESSED LIGH T WITH LENS (9 EXTERIOR & WET LOCATIONS
SURFACE MOUN`rED LIGHT FIXTURE
Tf-- T) SURFACE MOUNTED FLUORESCENT LIGHT FIXTURE
® UNDER CABINETFLUORESCENT FIXTURE
RECESSED INCANDESCENT LIGHT FIXTURE WITH EXHAUST FAN
CEILING FAN WITH LIGHT OPTION COMBO.
0 CARBON MONOXIDE
0 EXHAUST FAN OUTLET SMOKE DETECTOR
O MOTION SENSOR
T THERMOSTAT ON SWITCH
DUPLEX OUTLET - SWITCHED ff9 DOOR CHIMES
DUPLEX OUTLET
S® SMOKE DETECTOR
220 V OUTLET
�t SWITCH -F+ TELEVISION
yr THREE WAY SWITCH -Q TELEPHONE
3w
-rtjD - DIMMER SWITCH PUSH BUTTON
NOTE: RECEPTACLES IN KITCHEN & BATH AREAS TO BE 46- A.F.F.
ALL 120V SINGLE PHASE 15 & 20 AMP BRANCH CIRCUITS SUPPLYING
OUTLETS THAT ARE NOT GFCI MUST BE AFCI.
TAMPER PROOF RECEPTICALES MUST BE INSTALLED IN 120 VOLT, SINGLE
PHASE 15 & 20 AMP BRANCH CIRCUITS
OWNER TO CORRDINATE LOCATIONS OF TELEPHONES AND TELEVISIONS
IN FIELD WITH CONTRACTOR
St. tuc e
Permit �� my
i
a�
>
I
00
v
cv
rW
e'N
date revision
/ ' � 12/8/21 Plan Review
Comments
drawn
s.l.
checked
s.l.
date
8/27/21
scale
as noted
job number
21032
sheet