Loading...
HomeMy WebLinkAboutFPUA Utility FeeFort Pie;_ ,2,e Utilities Authon-, "Committed to Quality" Key Accounts 206 S. 6th Street P.O. Box 3191 Fort Pierce, Florida 34948-319.1 Invoice Number KA-45-08 Job, Location 4932 WATERSONG WAY PCN Account Name G. W: PURUCKER HOMES FEI # Contact Name G.W. PURUCKER HOMES Billing Address Telephone Fax Mobile Phone (772) 466-1600 Fax (772) 465-6984 Accounting Codes # Size Description Fees 06-3-060-43701-0000 1 1 Water Meter and/or Service Installation 320.00 06-2-000-23500-0000 Cust. Type 0Commercial Residential Water Security Deposit 60.00 06-3-060-48800-0000 Water Initiation of Service 40.00 06-3-060-43702-0000 Water Capital Improvement Charge. Water ERCs 1 $1,841.00 06-3-06.0-49525-0000 *Water Accrued Guaranteed Revenue Charge .$131.55 Meter Verification Fees 0.00 06-3-060-43701-0000 City Limits 0 Inside 0 Outside DDC 0.00 08-2-000-23500-0000 Wastewater Security Deposit 0.00 08-3-080-48800-0000 Wastewater Initiation of Service 0.00 08-3-080-43702-0000 Wastewater Capital Improvement Wastewater ERCs 0 0.00 08-3-080-49525-0000 *Wastewater Accrued Guaranteed Revenue Charge $0.00 06-3-060-43701-0000 Lien Fees $0.00 Accounting Codes Construction Cost Estimates Fees 0.06 0:00 ood until the end of them u y f Down Payment 0.06 F � month. If not r, �' , ewat ; AaGRC fees are *Water and the month new Wastewater ees apply. contact our office for updated fees. received b the`end o Invoice Total 2,392.55 Description for Service Order INSTALL 5/8.X 3/4'l �WATER_METER ONLI'-NO_SEWER Total Paid�Date Paid `t Check Number Customers will be assessed wastewater charges the day they connect to the wastewater system or within 365 days from date wastewater Connection Charge is paid - whichever is first. The cost of the service line from the point of deliver at the property line to the house is the responsibility of the Applicant and is not included in this invoice. Construction cost estimates are based on current labor, equipment and material prices. Actual costs of construction will be determined at the completion of the project. Should unforseen circumstances be encountered during construction, including but not limited to adverse weather conditions and construction conflicts, the owner will be responsible for increased costs. Additional costs incurred by the owner shall not exceed fifteen (15) percent of the total estimated construction costs shown.above. Estimated costs paid by the owner that exceed the actual cost of construction will be refunded by Fort Pierce Utilities Authority. Key Accounts Date 4/24/2608 - W/WW Engineering Date Customer's Signature Date Printed Name