Project No. 21-139B Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 2
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. B
5059 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0406
PROJECT NAME: Bryn Mawr Condominiums Concrete
Repairs 2021 – Bldg. B DATE: February 9, 2022
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Concrete pre-pour at the limited access balconies – Units 201, 406, 503 & 706.
OBSERVATIONS:
Unit 201
• Loose concrete has been chipped and removed along the southwest corner.
• The screen enclosures did not require removal.
• Reinforcing was exposed and found to be in serviceable condition with minor corrosion.
Unit 503
• Surface spall area have been chipped and corrosion chased until clean bar was found.
• Sliding glass door does not require removal.
Units 406 & 706
• Swing stage has been mobilized to the north of the building (06 stack).
RECOMMENDATIONS:
Units 201 & 503
• All exposed reinforcing bars to be power tool cleaned and coated with the approved corrosion inhibitor.
Units 406 & 706
• Chip & remove loose concrete at areas previously marked once the swing stage is in place at the 06 stack.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139B Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 2 of 2
Pic 1 – Unit 201
Edge repair
Pic 2 – Unit 503
Surface spall
Pic 3 – 06 Stack
North elevation
Swing stage mobilized