Loading...
HomeMy WebLinkAbout21-139B - Bryn Mawr Condos 2021 - Bldg B - Rep 6 - 02.09.22M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139B Report No. 6 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 2 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. B 5059 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0406 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. B DATE: February 9, 2022 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Concrete pre-pour at the limited access balconies – Units 201, 406, 503 & 706. OBSERVATIONS: Unit 201 • Loose concrete has been chipped and removed along the southwest corner. • The screen enclosures did not require removal. • Reinforcing was exposed and found to be in serviceable condition with minor corrosion. Unit 503 • Surface spall area have been chipped and corrosion chased until clean bar was found. • Sliding glass door does not require removal. Units 406 & 706 • Swing stage has been mobilized to the north of the building (06 stack). RECOMMENDATIONS: Units 201 & 503 • All exposed reinforcing bars to be power tool cleaned and coated with the approved corrosion inhibitor. Units 406 & 706 • Chip & remove loose concrete at areas previously marked once the swing stage is in place at the 06 stack. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139B Report No. 6 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 2 Pic 1 – Unit 201 Edge repair Pic 2 – Unit 503 Surface spall Pic 3 – 06 Stack North elevation Swing stage mobilized