HomeMy WebLinkAboutEnvelope Leakage Test Report (Blower Door Test)LoT
Envelope Leakage Test Report (Blower Door Test) is -
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition ��� V�`
Jurisdiction: I Permit #: a o IO a
Job Information l
Builder: L 7 go Community: Meti do w t-^ C) Lot:
Address: 3601 6 v'o Vt? G t Unit:
City. Fo 4 PIGr(Ir State: F L Zip:
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
OPRESCRIPTIVE METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
0 PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(SO) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406 2017 (ERI): Li —I 6
X 60 - N2 3 = , 2 Method for calc ,latingbuilding vol,
CFM(50) Building Volume ACH(50)
O Retrieved from architectural plans
VIPASS OFAIL O Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation
installation must be verified by building department.
OField measured and calculated
Testing. Testing shall be conducted in accordance with ANSURESNETACC 380 and reported at a pressure or 0.2 inche w g. (50 Pascals). Testing
shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth in Section
489.105(3xf), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building therma/envelope.
Duringtesting.
1.Ecterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3.Interior doors, if installed at the time of the test, shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, if installed at the time of the test, shall be turned off.
6-Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: UES, Universal Engineering Sciences phone: 772-924-3575
1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements accordin to t compliance method selected above.
Signature of Tester: Date of Test: �— Zo 2 7—
Printed Name of Tester. Trevor LaPorte
License/Certification #: 5064789 Issuing Authority: BPI