HomeMy WebLinkAboutTermite SprayIF71
Planning &Development Services
} Building &Code Regulation Division RECEIVED
2300 Virginia Ave
• Fort Pierce, FL 34982 JA N 2 5 2 i121
772-462-2172 Fax 772-462-6443
St.Lucie County
Permitting
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: � � abll-bill JOB ADDRESS: 4 aVe Q
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR: -
PEST CONTROL LICENSE #: Q l b 6 l 2
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control
Association.
j i
Square feet if area treated: Chemicals used: mq�G�li"f`f'1 (- SC
.> Q Total gallons used: 10
Percentage of solution: Q
Date of Treatment: f)r Time of Treatment: 0
0
Footing 1/ Slab St
ist Treatment 1 Treatment
Re-Treat Re-Treat
Driveway Pools 1st 1st Treatment 1 Treatment
Re-Treat Re-Treat
Other Perimeter for Final Inspection
15t Treatment 8 ,
Re-Treat
Ognature of Exter - a or Date
Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job"
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a,!re-inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobslte posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area
treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of
Protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
i